221:
H-Young
Company was selected to improve the surface to grade II bitumen standard, widen the road to 7 metres (23 ft) across, with culverts, drainage channels and side paths at a cost of KSh10.8 billion (US$ 108 million). As of December 2018, construction works were approximately 20 percent
310:
420:
521:
250:
333:
236:
reported work progress at an estimated 87 percent complete. At that time the road length is reported as 114 kilometres (71 mi) long. Completion is expected later in 2021.
430:
281:
518:
533:
178:, a total distance of about 122 kilometres (76 mi). However the construction contract gives the distance as 135 kilometres (84 mi).
214:, using locally sourced funds, plans to upgrade the entire road to class II bitumen surface with shoulders, culverts and drainage channels.
365:
397:
453:
482:
215:
186:
This road, is an important trade corridor for traffic headed from
Nairobi, South Sudan and Ethiopia, to the proposed
582:
572:
245:
425:
338:
286:
577:
370:
229:
newspaper reported construction progress at 75 percent, with commissioning expected in
October 2021.
211:
120:
159:
487:
233:
525:
458:
255:
226:
311:"Distance between Garsen, Tana River, Kenya and Kikoni Landing Site, C112, Lamu, Kenya"
566:
218:
is handling the hiring of a qualified, competent contractor to carry on the work.
175:
171:
163:
143:
72:
548:
535:
199:
195:
167:
139:
60:
135:
101:
191:
187:
147:
82:
513:
421:"AfDB taps firm to kick-start delayed Lamu, Ethiopia road"
398:"Construction of major highway at Kenya's Coast to begin"
366:"Construction of Garsen-Lamu highway to start this year"
334:"Surveyors map out Lamu to Ethiopia transport project"
483:"Garsen-Witu-Lamu road to be completed in two months"
519:
Highways agency seeks Nema nod for Lamu-Garissa road
222:complete, with a completion date of December 2019.
111:
97:
92:
78:
66:
56:
51:
41:
33:
28:
23:
162:, pursuing a general easterly direction through
514:Webpage of the Kenya National Highway Authority
454:"PM Abiy, Kenyatta commit to increased trade"
8:
359:
357:
267:
391:
389:
282:"The hopes riding on Lamu-Garsen road"
20:
7:
275:
273:
271:
452:Anthony Kitimo (14 December 2020).
280:Kazungu, Kalume (4 December 2018).
400:. Construction Review Online (CRO)
14:
134:is a road, under construction in
332:Bocha, Galgalo (15 March 2012).
216:Kenya National Highway Authority
481:Rolyn Njoroge (22 March 2021).
309:Globefeed.com (10 April 2016).
419:Omondi, George (20 May 2014).
174:, where the ferry connects to
158:The road starts at Garsen, in
1:
47:Completion in 2021 (Expected)
37:84 mi (135 km)
599:
364:Mwakio (2 February 2016).
190:and is a component of the
138:, connecting the towns of
429:. Nairobi. Archived from
116:
107:
88:
132:Garsen–Witu–Lamu Highway
24:Garsen–Witu–Lamu Highway
396:CRO (2 February 2016).
246:List of roads in Kenya
524:24 April 2019 at the
426:Business Daily Africa
339:Business Daily Africa
287:Business Daily Africa
549:2.38861°S 40.51000°E
371:The Standard (Kenya)
545: /
212:government of Kenya
206:Upgrade and funding
121:Transport in Kenya
68:Major intersections
554:-2.38861; 40.51000
45:Designated in 2016
583:Tana River County
225:In December 2020
198:Highway, part of
160:Tana River County
129:
128:
29:Route information
590:
560:
559:
557:
556:
555:
550:
546:
543:
542:
541:
538:
501:
500:
498:
496:
491:. Nairobi, Kenya
488:The Star (Kenya)
478:
472:
471:
469:
467:
449:
443:
442:
440:
438:
416:
410:
409:
407:
405:
393:
384:
383:
381:
379:
361:
352:
351:
349:
347:
329:
323:
322:
320:
318:
306:
300:
299:
297:
295:
277:
69:
21:
598:
597:
593:
592:
591:
589:
588:
587:
563:
562:
553:
551:
547:
544:
539:
536:
534:
532:
531:
526:Wayback Machine
510:
505:
504:
494:
492:
480:
479:
475:
465:
463:
459:The EastAfrican
451:
450:
446:
436:
434:
418:
417:
413:
403:
401:
395:
394:
387:
377:
375:
363:
362:
355:
345:
343:
331:
330:
326:
316:
314:
313:. Globefeed.com
308:
307:
303:
293:
291:
279:
278:
269:
264:
256:B8 road (Kenya)
242:
232:In March 2021,
227:The EastAfrican
208:
184:
156:
67:
52:Major junctions
46:
17:
12:
11:
5:
596:
594:
586:
585:
580:
575:
573:Roads in Kenya
565:
564:
529:
528:
516:
509:
508:External links
506:
503:
502:
473:
444:
411:
385:
353:
324:
301:
266:
265:
263:
260:
259:
258:
253:
248:
241:
238:
234:The Star Kenya
207:
204:
183:
180:
155:
152:
127:
126:
125:
124:
114:
113:
112:Highway system
109:
108:
105:
104:
99:
95:
94:
90:
89:
86:
85:
80:
76:
75:
70:
64:
63:
58:
54:
53:
49:
48:
43:
39:
38:
35:
31:
30:
26:
25:
15:
13:
10:
9:
6:
4:
3:
2:
595:
584:
581:
579:
576:
574:
571:
570:
568:
561:
558:
527:
523:
520:
517:
515:
512:
511:
507:
490:
489:
484:
477:
474:
461:
460:
455:
448:
445:
433:on 7 May 2016
432:
428:
427:
422:
415:
412:
399:
392:
390:
386:
373:
372:
367:
360:
358:
354:
341:
340:
335:
328:
325:
312:
305:
302:
289:
288:
283:
276:
274:
272:
268:
261:
257:
254:
252:
249:
247:
244:
243:
239:
237:
235:
230:
228:
223:
219:
217:
213:
205:
203:
201:
197:
193:
189:
181:
179:
177:
173:
169:
165:
161:
153:
151:
149:
145:
141:
137:
133:
123:
122:
118:
117:
115:
110:
106:
103:
100:
96:
91:
87:
84:
81:
79:East end
77:
74:
71:
65:
62:
59:
57:West end
55:
50:
44:
40:
36:
32:
27:
22:
19:
16:Road in Kenya
530:
493:. Retrieved
486:
476:
464:. Retrieved
457:
447:
435:. Retrieved
431:the original
424:
414:
402:. Retrieved
376:. Retrieved
369:
344:. Retrieved
337:
327:
315:. Retrieved
304:
292:. Retrieved
285:
231:
224:
220:
209:
185:
157:
131:
130:
119:
18:
578:Lamu County
552: /
466:14 December
294:10 December
176:Lamu Island
172:Lamu County
567:Categories
540:40°30′36″E
537:02°23′19″S
262:References
166:to end at
462:. Nairobi
374:. Nairobi
342:. Nairobi
290:. Nairobi
188:Port Lamu
522:Archived
495:9 August
317:10 April
240:See also
182:Overview
154:Location
93:Location
437:9 April
404:9 April
378:9 April
346:9 April
251:LAPSSET
200:LAPSSET
98:Country
42:History
196:Moyale
168:Mokowe
140:Garsen
61:Garsen
34:Length
136:Kenya
102:Kenya
497:2021
468:2020
439:2016
406:2016
380:2016
348:2016
319:2016
296:2018
210:The
192:Lamu
164:Witu
148:Lamu
146:and
144:Witu
83:Lamu
73:Witu
170:in
569::
485:.
456:.
423:.
388:^
368:.
356:^
336:.
284:.
270:^
202:.
150:.
499:.
470:.
441:.
408:.
382:.
350:.
321:.
298:.
194:-
142:,
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.