Knowledge (XXG)

Grand Duchy of Baden State Railway

Source đź“ť

3611: 611:), opened in 1862, but also main lines. In addition to attempts by towns, that still had no railway connexion and wanted better access to the railway network, the large cities in the state also got involved in railway line construction, in order to open up their environs and to strengthen their position as transport hubs. For example, the city of Mannheim built a direct railway line to Karlsruhe without having to go via Heidelberg, in order to step out of the shadows into which they had fallen when the Badische Haupt Railway was married up at Friedrichsfeld and Heidelberg with the Main-Neckar Line that ran on northwards. In a countermove the city of Heidelberg pressed for the construction of the Heidelberg– 418: 126: 194: 30: 71: 3815: 702: 118:
operation of the railway was, by contrast, given to the Foreign Ministry because it took over the running of the Postal Division, that from then on became the 'Post and Railway Division'. Not until the merger of the Baden Post Office into the Reichspost in 1872 did a separate railway administration emerge in Baden: the
261:
in 1863. With that the 414.3 km long Baden main line was completed. After the all-important north–south axis as well as links to the Lake Constance region had been established by the Baden Mainline, the remaining network expansion plans concentrated on opening up the area of Pforzheim with the
117:
The Ministry of the Interior was responsible for the construction of the railway, setting up for that purpose its own authority, the 'Railway Construction Division'. Later the railway construction authorities were incorporated into the 'Water and Road Construction Division'. Responsibility for the
105:
in 1837, did any serious planning begin for the building of a railway in Baden in order to avoid the loss of trade routes to Alsace. At an extraordinary meeting of the state parliament, the Baden legislature passed three laws on 29 March 1838 for the construction of the first route between Mannheim
522:
Around 1895, Baden's railway network was more or less finished bar a few small sections. In 1900 it had a track length of 1996 km, of which 1521 km was owned by the State Railways. In the succeeding years the main effort was the expansion of stations which formed railway hubs. The most
832:) electric locomotives were procured. All had side-rods driving three axles. The electrification of the Wiesen valley line was mainly done in order to trial electric traction; it had no great significance in terms of traffic. No further expansion of electric services was carried out after the 713:
on 1 April 1920 the Baden State Railways were merged into it. The head office in Karlsruhe became the Karlsruhe Reichsbahn Division. The foundation of the Reichsbahn meant that a wish list of routes in Baden was cancelled and only four new lines were built:
2857:(Baden Branch Lines) on 1 January 1899, all state-operated private lines went into state ownership over the course of time. In addition to those lines run by the Baden State Railways there were also fully private lines after 1889 that are not listed. 3646:). As the railway network expanded the size of the fleet grew rapidly. When the railways were converted from broad to standard gauge in 1854/55, there were already 66 locomotives, 65 tenders and 1,133 wagons in the fleet. At the end of the 315:. The Basel link line, which connected Baden station on the east of the Rhine with the Central station west of the Rhine, was opened in 1873. Today it is the most important railway connexion between Germany and Switzerland. 380:
were particularly difficult because both states were competing for traffic between Germany and the Alpine passes. While Baden favoured a line via Pforzheim, WĂĽrttemberg was interested in a more direct connexion at
3650:
the vehicle inventory included 915 locomotives, 27,600 goods wagons and 2,500 passenger coaches, of which 106 locomotives, 7,307 goods wagons and 400 passenger coaches had to be given to the victorious powers as
302:
Even when the Baden Mainline was being built, plans were already being formulated to link up with the Swiss railway network. This was not achieved until the bridge at Waldshut over the river Rhine, built by
590:
Several routes in Baden were built by private concerns, but operated by the State Railways and, in most cases, subsequently taken over. These were not just branch lines of purely local significance like the
3006:
In addition several routes were built by foreign state railways that ran through Baden territory. The section from Bretten to Bruchsal was transferred in 1878 to the ownership of the Baden State Railways.
3986: 3610: 93:
was put forward for the first time by Mannheim businessman, Ludwig Newhouse, but initially received no support from the Baden state government. Other proposals too by, for example
3666:
The Baden State Railways fostered the growth of an indigenous railway vehicle industry in Baden, because they preferred to buy from local firms such as the engineering works of
634:) at Karlsruhe an den Rhein, built by the city of Karlsruhe, opened in 1862, was the first link between Baden's railways and those of the Palatinate. It was nationalised in 1906. 201:
In the state treaty of 27 July 1852 an accommodation was reached which enabled the construction and operation of a line on Swiss sovereign territory by the Baden State Railways.
3910: 3803: 3976: 3971: 425:
The subsequent expansion of Baden's railway network was either aimed at opening up the regions or carried out from a military perspective. Worth mentioning are:
3956: 1788: 3966: 190:, during which differences of opinion over the best place for the junction of the Baden line to the Swiss network – Basel or Waldshut – led to delays. 3836: 345:
From 1861 there had also been a direct route to France after the completion of the Rhine bridge between Kehl and Strasbourg. The opening up of the
3915: 3699: 3660: 1191: 2079: 1986: 110:
and a branch to Strasbourg. The construction of the railway line was to be funded by the state, something that had been championed especially by
3796: 3781: 2976: 385:. An agreement was finally reached in the state treaty of the 4 December 1850, whereby WĂĽrttemberg was granted the right to build the direct 3890: 3831: 3751:(in German). Heidelberg: Heidelberger Verlagsanstalt und Druckerei – via Digital Texts at the Inst. of Economic and Business history. 3704: 3445: 1814: 1755: 836:
due to the serious economic situation and it was not until 1952 that the electrification of Baden's railway network was begun in earnest.
186:
were opened as early as 1844 and 1845 respectively. The extension of the main line through Basel territory required negotiations with the
3935: 3905: 3709: 3499: 3477: 3453: 3381: 3308: 3241: 3168: 3144: 3122: 3100: 3076: 119: 3160: 1272: 1230: 1171: 406: 3867: 3469: 1211: 969: 3789: 1736: 3771: 3573: 3523: 3671: 2995: 2059: 1833: 453: 290:, opened 1862–1866) and forging a direct link from Karlsruhe to Konstanz, without the diversion via Basel, in the shape of the 3349: 3324: 3068: 402: 3981: 3900: 3597: 3405: 1640: 1508: 1435: 1364: 1318: 731: 291: 1583: 335: 1621: 3565: 3930: 3627: 97:, were unsuccessful at first. Not until the foundation of a railway company in the neighbouring French province of 3961: 2430:
only the section as far as the border belonged to the Baden State Railways. The Basel link line was built by the
692:, built by the city of Karlsruhe, opened in 1879 and taken over by the Baden State Railways on the day it opened. 665:, built by the city of Mannheim, opened in 1870 and taken over by the Baden State Railways on the day it opened. 798:
The Baden State Railways began electric railway operations on 13 September 1913 with opening of the 15 KV AC, 16
3515: 2597: 658: 205: 2861: 3925: 3714: 3652: 3549: 3203: 3196: 2941: 2473: 2327: 1602: 1560: 1546: 1403: 1383: 1124: 1109: 727: 557: 417: 111: 2447: 3429: 3421: 3357: 3332: 3286: 3263: 3111: 2107: 1635: 1503: 1345: 1253: 366: 275: 243: 85:
to build and operate railways at state expense. In 1833 a proposal for the construction of a railway from
2238: 3233: 3217: 2431: 1939: 1885: 1778: 1695: 1679: 1527: 1489: 1470: 1454: 1419: 1397: 499: 488: 430: 2936: 2854: 763: 3388: 3683: 2986: 2960: 2890: 2732: 2710: 2619: 2482: 2124: 1869: 1824: 1518: 1413: 1336: 1114: 1081: 1062: 1043: 1024: 1015: 1005: 1000: 950: 931: 912: 889: 870: 809: 719: 592: 480: 461: 421:
Construction of the strategic railway line in south Baden and the Danube valley between 1887 and 1890
163: 38: 829: 3872: 3862: 3687: 3615: 3589: 3510: 3412: 3397: 2922: 2839: 2571: 2521: 2415: 2261: 2089: 1034: 1019: 779: 748: 710: 346: 331: 246:
all their existing routes and rolling stock to standard gauge within just one year during 1854/55.
187: 54: 17: 353:) was first realised in 1865 with a pontoon bridge from Karlsruhe–Maxau as well as a link between 3920: 3675: 3092: 2917: 2817: 2798: 2688: 2395: 2386: 2040: 1726: 1299: 1152: 1133: 362: 82: 3674:('Karlsruhe Engineering Company'). And two coach manufacturers emerged in Baden in the shape of 3746: 409:, which ran partly in Württemberg. The connexion with Bruchsal was taken into service in 1853. 3656: 3623: 3373: 3343: 2779: 2705: 2434:
and co-financed by the Baden State Railway. The state railway had a special role for the only
979: 941: 926: 817: 669: 608: 146:), was built in sections between 1840 and 1863. The first, 18.5 km long, section between 3584: 3416: 3392: 3339: 3048: 3040: 2906: 2900: 2309: 2224: 2206: 2146: 2050: 1953: 1864: 1828: 1769: 1712: 1660: 1465: 1282: 1181: 1147: 1143: 1128: 1072: 1057: 825: 741: 738: 528: 465: 442: 254: 171: 2517: 2499: 578:
The newly built Heidelberg central station could not be completed due to the start of the
3647: 3209: 2409: 2344: 2256: 2142: 2073: 1597: 1522: 833: 579: 568: 3882: 3841: 2111: 1765: 438: 125: 3727:
von Hippel, Wolfgang; Stephan, Joachim; Gleiber, Peter; Enzweiler, Hans-JĂĽrgen (1990).
3667: 2932: 2592: 2093: 2054: 1912: 1654: 1574: 1499: 1430: 1359: 759: 654: 507: 377: 238: 139: 94: 41:
was an independent state in what is now southwestern Germany until the creation of the
193: 57:
in 1920, its network had an overall length of about 2,000 kilometres (1,200 mi).
29: 3950: 3857: 2955: 2951: 2885: 2766: 2606: 2527: 2504: 2069: 1981: 1843: 1689: 1674: 1556: 638: 627: 622:
The most important of the privately built lines operated by the State Railways were:
561: 541: 472: 304: 197:
Konstanz station still has today a slim clock tower typical of former Baden stations.
42: 828:
branch. In addition to an experimental Class A¹ locomotive, eleven Class A² and A³ (
3530: 3436: 2659: 2643: 2588: 2545: 2435: 1792: 1612: 1480: 1449: 1340: 1286: 650: 612: 358: 308: 3055: 2399: 2390: 1730: 1267: 1205: 390: 271: 70: 3560: 3464: 3293: 3274: 3179: 3155: 3133: 3087: 2295: 2286: 1996: 1925: 1916: 1899: 1880: 1722: 1706: 1670: 1616: 1593: 1578: 1541: 1332: 983: 775: 287: 183: 107: 701: 274:
route (opened 1859–1863), linking up the Odenwald and Tauberfrankens with the
3679: 3580: 3484: 3460: 3364: 3252: 3183: 3151: 3027: 2970: 2834: 2723: 2701: 2679: 2639: 2477: 2372: 2252: 2160: 1977: 1933: 1860: 1847: 1445: 1374: 1244: 1240: 1221: 1185: 1166: 1053: 1038: 960: 880: 865: 821: 604: 476: 405:) even on Baden territory, while Baden was permitted to build and operate the 279: 167: 151: 102: 3534: 3488: 3440: 3297: 3224: 3129: 3083: 3035: 2830: 2811: 2792: 2683: 2601: 2566: 2495: 2341: 2272: 2031: 1950: 1920: 1809: 1773: 1484: 1309: 1263: 1225: 1105: 1076: 996: 945: 903: 899: 884: 787: 689: 677: 662: 511: 446: 386: 327: 323: 267: 263: 175: 159: 155: 3626:
for the Baden State Railways were built by the English locomotive works of
53:), which was founded in 1840. At the time when it was integrated into the 3556: 3506: 3368: 3315: 3270: 3188: 3175: 3107: 3063: 3031: 2864:
completed the following routes within the Baden railway network by 1945:
2774: 2745: 2623: 2584: 2299: 2290: 2221: 2203: 2188: 2138: 2018: 2014: 2000: 1650: 1537: 1393: 1378: 1294: 1092: 861: 844:
The railway lines in Baden State Railway network were opened as follows:
685: 646: 503: 398: 382: 354: 319: 258: 154:
was taken into service on 12 September 1840. Other sections followed: to
147: 86: 3814: 3538: 3059: 2881: 2770: 2727: 2562: 2439: 1929: 1895: 1805: 1750: 1746: 1631: 1328: 1313: 1248: 1162: 922: 907: 771: 681: 515: 394: 283: 74:
Baden premium bond from 1845/49 issued to finance railway construction.
2853:
Apart from the Ettlingen West–Ettlingen Stadt line, taken over by the
214:). After it turned out that all her neighbouring states had opted for 3319: 3248: 2990: 2749: 2663: 2357: 2313: 2035: 1355: 1290: 616: 312: 98: 307:, was completed on 18 August 1859. Other links were made in 1863 at 3609: 2443: 2174: 813: 700: 600: 416: 250: 192: 124: 90: 78: 69: 28: 3748:
Die badischen Eisenbahnen in historisch-statistischer Darstellung
3659:. An overview of Baden's locomotive classes may be found in the 3228: 2541: 1201: 964: 179: 3785: 334:, in which the Grand Duchy of Baden participated. In 1879 the 619:
route, in order to secure its importance as a transport hub.
560:
in Basel with new adjoining marshalling yard to the north at
574:
New marshalling yard and goods station at Heidelberg, 1914
342:) followed, although Baden did not own any section of it. 3772:
Laws and state treaties concerned with the Baden railways
106:
and the Swiss border at Basel, as well as a stub line to
45:
in 1871. It had its own state-owned railway company, the
3729:
Eisenbahn-Fieber: Badens Aufbruch ins Eisenbahnzeitalter
51:
GroĂźherzoglich Badische Staatseisenbahnen or G.Bad.St.E.
553:
New station at Offenburg with a marshalling yard, 1911
3776: 3670:
and Martiensen in Karlsruhe, which later became the
1966:
Karlsruhe marshalling yard–Karlsruhe West–Knielingen
705:
Plan of the railway lines built before 1945 in Baden
3881: 3850: 3824: 537:
New goods relief line at Freiburg im Breisgau, 1905
204:The Baden railway lines were initially laid to the 129:
Departure of a train from Heidelberg station, 1840.
3686:in 1897. Some coaches were also purchased by the 3630:and delivered in 1839. They were given the names 3987:1841 establishments in the German Confederation 790:) was begun, but the line was never completed. 582:. Its completion had to be delayed until 1955. 101:, for the construction of a line from Basel to 770:Construction work on a railway connexion from 3797: 471:The strategic diversions on the Upper Rhine: 8: 2450:were contracted to build and run this line. 2275:station and Windschläg–Offenburg goods line 550:New marshalling yard in Mannheim, 1906–1907 3804: 3790: 3782: 2446:, that opened on 3 June 1905. The firm of 3977:Railway companies disestablished in 1871 3740:(in German). Karlsruhe: Verlag G. Braun. 3009: 2866: 2455: 846: 3700:List of Baden locomotives and railbuses 3661:List of Baden locomotives and railbuses 547:New goods relief line at Bruchsal, 1906 330:had been established since 1846 by the 3758:110 Jahre Eisenbahndirektion Karlsruhe 2426:On the cross-border lines marked with 81:was the second German state after the 33:Map of the railway lines in Baden 1870 3972:Railway companies established in 1841 3837:History of the railway in WĂĽrttemberg 3760:(in German). Eisenbahn-Kurier Verlag. 311:, in 1871 at Konstanz and in 1875 at 7: 3832:History of rail transport in Germany 3777:Vehicles of the Baden state railways 3705:History of rail transport in Germany 518:–Roeschwoog (Elsass), opened in 1895 3731:(in German). Verlag Regionalkultur. 3710:Grand Duchy of Hesse State Railways 2761:City of Freiburg, Breisach, Baden 2634:City of Freiburg, Town of Breisach 318:The connexion to the north towards 120:Grand Duchy of Baden State Railways 47:Grand Duchy of Baden State Railways 18:Grand Duchy of Baden State Railways 3957:Grand Duchy of Baden State Railway 3868:Deutsche Reichsbahn (East Germany) 2718:Schopfheim-Zeller Railway Company 2080:Stahringen–Friedrichshafen railway 1987:Stahringen–Friedrichshafen railway 114:. In September 1838 work started. 25: 2977:Tuttlingen–Hattingen railway line 1584:Altshausen–Schwackenreute railway 3873:Deutsche Reichsbahn-Gesellschaft 3813: 3574:Prussian-Hessian Railway Company 3524:Prussian-Hessian Railway Company 1622:Sigmaringen–Krauchenwies railway 778:(with a planned junction to the 3672:Maschinengesellschaft Karlsruhe 3614:Composite Coach. Built 1878 by 242:rail, the Baden State Railways 3967:Transport in Baden-WĂĽrttemberg 3470:Tuttlingen–Sigmaringen railway 3161:Plochingen–Immendingen railway 2453:State-operated private lines: 1: 3736:KuntzemĂĽller, Albert (1953). 1212:Appenweier–Strasbourg railway 970:Appenweier–Strasbourg railway 134:Development of the main lines 1319:Black Forest Railway (Baden) 534:New station at Rastatt, 1895 523:important conversions were: 487:) and the completion of the 376:Negotiations for a route to 365:followed the opening of the 298:Links to neighbouring states 138:The first route, called the 3593: 3569: 3545: 3519: 3495: 3473: 3449: 3425: 3401: 3377: 3353: 3328: 3304: 3282: 3259: 3237: 3213: 3192: 3164: 3140: 3118: 3096: 3072: 3069:WĂĽrttemberg Western Railway 3044: 2999: 2980: 2964: 2945: 2926: 2910: 2894: 2843: 2821: 2802: 2783: 2757: 2736: 2714: 2692: 2670: 2650: 2630: 2610: 2575: 2553: 2531: 2508: 2486: 2419: 2403: 2380: 2365: 2351: 2334: 2320: 2303: 2280: 2265: 2246: 2232: 2214: 2196: 2182: 2167: 2153: 2132: 2118: 2100: 2083: 2063: 2044: 2025: 2008: 1990: 1971: 1960: 1943: 1906: 1889: 1873: 1854: 1837: 1818: 1799: 1782: 1759: 1740: 1716: 1699: 1683: 1664: 1644: 1625: 1606: 1587: 1568: 1550: 1531: 1512: 1493: 1474: 1458: 1439: 1423: 1407: 1387: 1368: 1349: 1322: 1303: 1276: 1257: 1234: 1215: 1195: 1175: 1156: 1137: 1118: 1099: 1085: 1066: 1047: 1028: 1009: 990: 973: 954: 935: 916: 893: 874: 495:) all between 1887 and 1890 403:WĂĽrttemberg Western Railway 4003: 3628:Sharp, Roberts and Company 2490:Wiesental Railway Company 697:Merger into the Reichsbahn 586:State-run private railways 361:in 1867. A connexion with 3756:Schell, Fridolin (1982). 3738:Die Badischen Eisenbahnen 3606:Running and rolling stock 2847:Murgthal Railway Company 2740:Renchtal Railway Company 2579:Murgthal Railway Company 1879:Weizen (near StĂĽhlingen)– 1737:MĂĽllheim–Mulhouse railway 178:in 1851. The branches to 3851:German railway companies 3819:German railway companies 3688:Swiss Industrial Company 3616:Swiss Industrial Company 3516:Weschnitz Valley Railway 2814:Erbprinz–Ettlingen Stadt 1692:–Weizen (bei StĂĽhlingen) 709:On the formation of the 407:Karlsruhe–MĂĽhlacker line 212:5 ft 3 in 3715:Prussian state railways 3655:in accordance with the 3550:Swiss Northeast Railway 3346:–Mannheim Haupt station 3197:Swiss Northeast Railway 2862:Deutsche Reichs Railway 2795:West–Ettlingen Erbprinz 2051:Neustadt (Black Forest) 1829:Neustadt (Black Forest) 1789:Mannheim-Friedrichsfeld 1603:Hegau-Ablachtal Railway 1547:Hegau-Ablachtal Railway 1384:Hegau-Ablachtal Railway 112:Karl Friedrich Nebenius 3825:German railway history 3619: 3566:Weinheim–Worms railway 3430:Hessian Ludwig Railway 3358:Hessian Ludwig Railway 3333:Hessian Ludwig Railway 3287:Swiss National Railway 3264:Swiss National Railway 3206:–Basel Central station 2942:Neckarsteinach–Schönau 2241:– Lenzkirch – Bonndorf 2159:Mimmenhausen-Neufrach– 1346:Baden Odenwald Railway 1254:Baden Odenwald Railway 853:As part of the route: 706: 688:with its extension to 466:Neustadt (Schwarzwald) 422: 367:Baden Odenwald Railway 276:Baden Odenwald Railway 198: 130: 75: 34: 3745:MĂĽller, Karl (1904). 3613: 3446:Kinzig Valley Railway 3234:Nagold Valley Railway 3218:Swiss Central Railway 3016:As part of the route 2873:As part of the route 2557:Lahr Railway Company 2462:As part of the route 2448:Vering & Waechter 2432:Swiss Central Railway 1886:Wutach Valley Railway 1815:Kinzig Valley Railway 1779:Neckar Valley Railway 1756:Kinzig Valley Railway 1696:Wutach Valley Railway 1680:Wutach Valley Railway 1528:Tauber Valley Railway 1490:Elsenz Valley Railway 1471:Tauber Valley Railway 1455:Elsenz Valley Railway 1420:Tauber Valley Railway 1404:Mannheim–Ludwigshafen 1398:Ludwigshafen am Rhein 718:The extension of the 704: 489:Wutach Valley Railway 431:Neckar Valley Railway 420: 196: 128: 73: 32: 3982:Grand Duchy of Baden 3684:Waggonfabrik Rastatt 2987:Freiburg im Breisgau 2961:Rench Valley Railway 2891:Rench Valley Railway 2733:Rench Valley Railway 2711:Wiese Valley Railway 2620:Freiburg im Breisgau 2483:Wiese Valley Railway 2125:Freiburg im Breisgau 1870:Wehra Valley Railway 1825:Freiburg im Breisgau 1713:Bruchsal–Germersheim 1661:Bruchsal–Germersheim 1641:Black Forest Railway 1509:Black Forest Railway 1436:Black Forest Railway 1365:Black Forest Railway 1115:Rhine Valley Railway 1082:Rhine Valley Railway 1063:Rhine Valley Railway 1044:Rhine Valley Railway 1025:Rhine Valley Railway 1016:Freiburg im Breisgau 1006:Rhine Valley Railway 1001:Freiburg im Breisgau 951:Rhine Valley Railway 932:Rhine Valley Railway 913:Rhine Valley Railway 890:Rhine Valley Railway 871:Rhine Valley Railway 810:Wiese Valley Railway 720:Rench Valley Railway 593:Wiese Valley Railway 481:Wehra Valley Railway 462:Freiburg im Breisgau 294:(opened 1866–1873). 292:Black Forest Railway 164:Freiburg im Breisgau 39:Grand Duchy of Baden 3863:Deutsche Bundesbahn 3590:Main Valley Railway 3398:Main Valley Railway 3204:Basel Baden station 2923:Murg Valley Railway 2840:Murg Valley Railway 2696:Town of Waldkirch 2572:Murg Valley Railway 2474:Basel Baden station 2416:Murg Valley Railway 2328:Basel Baden station 2262:Murg Valley Railway 2239:Kappel-GutachbrĂĽcke 1273:Karlsruhe–MĂĽhlacker 1231:Karlsruhe–MĂĽhlacker 1222:Wilferdingen-Singen 1172:Karlsruhe–MĂĽhlacker 1167:Wilferdingen-Singen 1125:Basel Baden station 1110:Basel Baden station 794:Electric operations 749:Murg Valley Railway 711:Deutsche Reichsbahn 188:Swiss Confederation 55:Deutsche Reichsbahn 3676:Waggonfabrik Fuchs 3620: 3093:Enz Valley Railway 2973:–Hattingen (Baden) 2937:Schönau (Odenwald) 2918:Klosterreichenbach 2825:Town of Ettlingen 2818:Alb Valley Railway 2806:Town of Ettlingen 2799:Alb Valley Railway 2787:Town of Karlsruhe 2689:Elz Valley Railway 2535:City of Karlsruhe 2512:City of Karlsruhe 2396:Tauberbischofsheim 2387:Tauberbischofsheim 2335:13 September 1913 2247:24 September 1907 2227:, northern section 2209:, southern section 2041:Elz Valley Railway 2009:20 September 1899 2006:Seckach–Miltenberg 1904:Seckach–Miltenberg 1727:Neuenburg am Rhein 1300:High Rhine Railway 1153:High Rhine Railway 1134:High Rhine Railway 875:12 September 1840 764:Schönau (Odenwald) 707: 571:at Karlsruhe, 1913 531:at Karlsruhe, 1895 423: 371:Baden Odenwaldbahn 199: 144:Badische Hauptbahn 131: 83:Duchy of Brunswick 76: 35: 3944: 3943: 3657:Versailles Treaty 3624:steam locomotives 3603: 3602: 3374:Kraichgau Railway 3141:27 September 1869 3004: 3003: 2996:Höllental Railway 2895:28 November 1926 2851: 2850: 2780:Kraichgau Railway 2706:Zell im Wiesental 2668:Heidelberg–Speyer 2648:Heidelberg–Speyer 2614:City of Mannheim 2424: 2423: 2366:21 November 1913 2360:–Beuren-BĂĽĂźlingen 2304:23 November 1911 2191:goods relief line 2183:15 December 1905 2133:4 September 1905 2127:goods relief line 2060:Höllental Railway 2026:15 November 1900 1834:Höllental Railway 1665:23 November 1874 1626:6 September 1873 1607:6 September 1873 1569:11 February 1872 1369:6 September 1866 1119:20 February 1855 818:Zell im Wiesental 766:stub line in 1928 744:–Seebrugg in 1926 670:Kraichgau Railway 609:Zell im Wiesental 454:Höllental Railway 413:Further expansion 249:The line reached 16:(Redirected from 3994: 3962:History of Baden 3818: 3817: 3806: 3799: 3792: 3783: 3761: 3752: 3741: 3732: 3511:FĂĽrth (Odenwald) 3474:27 November 1890 3422:Odenwald Railway 3340:Mannheim-Waldhof 3049:Main-Neckar Line 3041:Main-Neckar Line 3010: 3000:8 November 1934 2946:21 October 1928 2911:1 December 1926 2907:Three Lakes Line 2867: 2671:10 December 1873 2554:15 November 1865 2456: 2404:1 December 1914 2352:23 October 1913 2281:6 November 1911 2225:marshalling yard 2207:marshalling yard 2197:29 January 1906 2168:1 December 1905 1954:marshalling yard 1907:1 December 1887 1819:4 November 1886 1741:6 February 1878 1700:15 October 1876 1645:1 November 1873 1551:3 February 1870 1532:23 October 1869 1475:15 October 1868 1424:10 October 1867 1258:23 October 1862 1157:30 October 1856 1138:4 February 1856 1100:9 November 1854 1086:22 January 1851 1073:Efringen-Kirchen 1067:8 November 1848 1058:Efringen-Kirchen 1035:MĂĽllheim (Baden) 1020:MĂĽllheim (Baden) 847: 807: 806: 802: 780:Zabergäu Railway 739:Three Lakes Line 529:marshalling yard 468:, opened in 1887 449:, opened in 1879 332:Main-Neckar Line 241: 235: 233: 232: 228: 225: 217: 213: 208: 172:Efringen-Kirchen 21: 4002: 4001: 3997: 3996: 3995: 3993: 3992: 3991: 3947: 3946: 3945: 3940: 3891:Alsace-Lorraine 3877: 3846: 3820: 3812: 3810: 3768: 3755: 3744: 3735: 3726: 3723: 3696: 3648:First World War 3608: 3496:9 November 1892 3450:4 November 1886 3329:15 October 1879 3214:3 November 1873 3210:Basel Link Line 3073:1 December 1853 2991:Freiburg-Wiehre 2784:15 October 1879 2755:Freiburg–Colmar 2715:5 February 1876 2631:6 February 1871 2596: 2345:central station 2215:1 October 1906 2154:1 October 1905 2101:2 October 1901 2084:1 October 1901 2074:Friedrichshafen 2064:20 August 1901 2045:20 August 1901 1991:18 August 1895 1924: 1588:11 August 1873 1523:Bad Mergentheim 1513:16 August 1869 1408:10 August 1867 1350:25 August 1866 1196:18 August 1859 1176:10 August 1859 842: 834:First World War 804: 800: 799: 796: 699: 588: 580:First World War 569:central station 415: 300: 237: 230: 226: 223: 221: 220:4 ft  219: 215: 211: 206: 136: 68: 63: 23: 22: 15: 12: 11: 5: 4000: 3998: 3990: 3989: 3984: 3979: 3974: 3969: 3964: 3959: 3949: 3948: 3942: 3941: 3939: 3938: 3933: 3928: 3923: 3918: 3913: 3908: 3903: 3898: 3893: 3887: 3885: 3879: 3878: 3876: 3875: 3870: 3865: 3860: 3854: 3852: 3848: 3847: 3845: 3844: 3839: 3834: 3828: 3826: 3822: 3821: 3811: 3809: 3808: 3801: 3794: 3786: 3780: 3779: 3774: 3767: 3766:External links 3764: 3763: 3762: 3753: 3742: 3733: 3722: 3719: 3718: 3717: 3712: 3707: 3702: 3695: 3692: 3622:The first two 3607: 3604: 3601: 3600: 3595: 3594:1 October 1912 3592: 3587: 3577: 3576: 3571: 3568: 3563: 3553: 3552: 3547: 3544: 3541: 3527: 3526: 3521: 3518: 3513: 3503: 3502: 3497: 3494: 3491: 3481: 3480: 3475: 3472: 3467: 3457: 3456: 3451: 3448: 3443: 3433: 3432: 3427: 3424: 3419: 3409: 3408: 3403: 3402:1 October 1881 3400: 3395: 3385: 3384: 3379: 3378:18 August 1880 3376: 3371: 3361: 3360: 3355: 3352: 3347: 3336: 3335: 3330: 3327: 3322: 3312: 3311: 3306: 3305:14 August 1875 3303: 3300: 3290: 3289: 3284: 3281: 3278: 3267: 3266: 3261: 3258: 3255: 3245: 3244: 3239: 3236: 3231: 3221: 3220: 3215: 3212: 3207: 3200: 3199: 3194: 3191: 3186: 3172: 3171: 3166: 3163: 3158: 3148: 3147: 3142: 3139: 3136: 3126: 3125: 3120: 3119:26 August 1869 3117: 3114: 3104: 3103: 3098: 3095: 3090: 3080: 3079: 3074: 3071: 3066: 3052: 3051: 3046: 3043: 3038: 3024: 3023: 3020: 3017: 3014: 3002: 3001: 2998: 2993: 2983: 2982: 2979: 2974: 2967: 2966: 2963: 2958: 2948: 2947: 2944: 2939: 2933:Neckarsteinach 2929: 2928: 2927:13 April 1928 2925: 2920: 2913: 2912: 2909: 2904: 2897: 2896: 2893: 2888: 2878: 2877: 2874: 2871: 2849: 2848: 2845: 2842: 2837: 2827: 2826: 2823: 2820: 2815: 2808: 2807: 2804: 2803:25 August 1885 2801: 2796: 2789: 2788: 2785: 2782: 2777: 2763: 2762: 2759: 2758:5 January 1878 2756: 2753: 2742: 2741: 2738: 2735: 2730: 2720: 2719: 2716: 2713: 2708: 2698: 2697: 2694: 2693:1 January 1875 2691: 2686: 2676: 2675: 2672: 2669: 2666: 2656: 2655: 2652: 2649: 2646: 2636: 2635: 2632: 2629: 2626: 2616: 2615: 2612: 2609: 2604: 2593:Graben-Neudorf 2581: 2580: 2577: 2574: 2569: 2559: 2558: 2555: 2552: 2549: 2537: 2536: 2533: 2530: 2525: 2514: 2513: 2510: 2507: 2502: 2492: 2491: 2488: 2485: 2480: 2470: 2469: 2466: 2463: 2460: 2422: 2421: 2418: 2413: 2406: 2405: 2402: 2393: 2383: 2382: 2379: 2376: 2368: 2367: 2364: 2361: 2354: 2353: 2350: 2347: 2337: 2336: 2333: 2330: 2323: 2322: 2319: 2318:Rheinau–Ketsch 2316: 2306: 2305: 2302: 2293: 2283: 2282: 2279: 2276: 2268: 2267: 2264: 2259: 2249: 2248: 2245: 2242: 2235: 2234: 2231: 2228: 2217: 2216: 2213: 2210: 2199: 2198: 2195: 2192: 2185: 2184: 2181: 2178: 2170: 2169: 2166: 2163: 2156: 2155: 2152: 2151:Rheinau–Ketsch 2149: 2135: 2134: 2131: 2128: 2121: 2120: 2117: 2114: 2106:Marbach (near 2103: 2102: 2099: 2096: 2094:Unteruhldingen 2086: 2085: 2082: 2077: 2066: 2065: 2062: 2057: 2055:Donaueschingen 2047: 2046: 2043: 2038: 2028: 2027: 2024: 2021: 2011: 2010: 2007: 2004: 1993: 1992: 1989: 1984: 1974: 1973: 1970: 1967: 1963: 1962: 1959: 1956: 1946: 1945: 1942: 1937: 1913:Graben-Neudorf 1909: 1908: 1905: 1902: 1892: 1891: 1888: 1883: 1876: 1875: 1872: 1867: 1857: 1856: 1853: 1850: 1840: 1839: 1836: 1831: 1821: 1820: 1817: 1812: 1802: 1801: 1798: 1795: 1785: 1784: 1781: 1776: 1762: 1761: 1758: 1753: 1743: 1742: 1739: 1734: 1719: 1718: 1715: 1710: 1702: 1701: 1698: 1693: 1686: 1685: 1684:22 April 1875 1682: 1677: 1667: 1666: 1663: 1658: 1655:Graben-Neudorf 1647: 1646: 1643: 1638: 1628: 1627: 1624: 1619: 1609: 1608: 1605: 1600: 1590: 1589: 1586: 1581: 1575:Schwackenreute 1571: 1570: 1567: 1564: 1553: 1552: 1549: 1544: 1534: 1533: 1530: 1525: 1515: 1514: 1511: 1506: 1500:Donaueschingen 1496: 1495: 1494:5 August 1869 1492: 1487: 1477: 1476: 1473: 1468: 1461: 1460: 1457: 1452: 1442: 1441: 1438: 1433: 1431:Donaueschingen 1426: 1425: 1422: 1417: 1410: 1409: 1406: 1401: 1390: 1389: 1386: 1381: 1371: 1370: 1367: 1362: 1352: 1351: 1348: 1343: 1325: 1324: 1321: 1316: 1306: 1305: 1302: 1297: 1279: 1278: 1275: 1270: 1260: 1259: 1256: 1251: 1237: 1236: 1233: 1228: 1218: 1217: 1214: 1209: 1198: 1197: 1194: 1192:Waldshut–Turgi 1189: 1178: 1177: 1174: 1169: 1159: 1158: 1155: 1150: 1140: 1139: 1136: 1131: 1121: 1120: 1117: 1112: 1102: 1101: 1098: 1095: 1088: 1087: 1084: 1079: 1069: 1068: 1065: 1060: 1050: 1049: 1046: 1041: 1031: 1030: 1027: 1022: 1012: 1011: 1010:1 August 1845 1008: 1003: 993: 992: 989: 986: 976: 975: 972: 967: 957: 956: 953: 948: 938: 937: 934: 929: 919: 918: 915: 910: 896: 895: 894:10 April 1843 892: 887: 877: 876: 873: 868: 858: 857: 854: 851: 841: 838: 830:DRG Class E 61 795: 792: 768: 767: 760:Neckarsteinach 756: 745: 735: 698: 695: 694: 693: 666: 655:Graben-Neudorf 635: 587: 584: 576: 575: 572: 565: 554: 551: 548: 545: 544:at Basel, 1905 538: 535: 532: 520: 519: 508:Graben-Neudorf 498:The strategic 496: 469: 450: 414: 411: 299: 296: 239:standard gauge 140:Baden Mainline 135: 132: 95:Friedrich List 67: 64: 62: 59: 24: 14: 13: 10: 9: 6: 4: 3: 2: 3999: 3988: 3985: 3983: 3980: 3978: 3975: 3973: 3970: 3968: 3965: 3963: 3960: 3958: 3955: 3954: 3952: 3937: 3934: 3932: 3929: 3927: 3924: 3922: 3919: 3917: 3914: 3912: 3909: 3907: 3904: 3902: 3899: 3897: 3894: 3892: 3889: 3888: 3886: 3884: 3880: 3874: 3871: 3869: 3866: 3864: 3861: 3859: 3858:Deutsche Bahn 3856: 3855: 3853: 3849: 3843: 3840: 3838: 3835: 3833: 3830: 3829: 3827: 3823: 3816: 3807: 3802: 3800: 3795: 3793: 3788: 3787: 3784: 3778: 3775: 3773: 3770: 3769: 3765: 3759: 3754: 3750: 3749: 3743: 3739: 3734: 3730: 3725: 3724: 3720: 3716: 3713: 3711: 3708: 3706: 3703: 3701: 3698: 3697: 3693: 3691: 3689: 3685: 3681: 3677: 3673: 3669: 3664: 3662: 3658: 3654: 3649: 3645: 3641: 3637: 3633: 3629: 3625: 3617: 3612: 3605: 3599: 3596: 3591: 3588: 3586: 3582: 3579: 3578: 3575: 3572: 3567: 3564: 3562: 3558: 3555: 3554: 3551: 3548: 3542: 3540: 3536: 3532: 3529: 3528: 3525: 3522: 3517: 3514: 3512: 3508: 3505: 3504: 3501: 3498: 3492: 3490: 3486: 3483: 3482: 3479: 3476: 3471: 3468: 3466: 3462: 3459: 3458: 3455: 3452: 3447: 3444: 3442: 3438: 3435: 3434: 3431: 3428: 3423: 3420: 3418: 3414: 3411: 3410: 3407: 3404: 3399: 3396: 3394: 3390: 3387: 3386: 3383: 3380: 3375: 3372: 3370: 3366: 3363: 3362: 3359: 3356: 3351: 3348: 3345: 3341: 3338: 3337: 3334: 3331: 3326: 3323: 3321: 3317: 3314: 3313: 3310: 3307: 3301: 3299: 3295: 3292: 3291: 3288: 3285: 3279: 3276: 3272: 3269: 3268: 3265: 3262: 3256: 3254: 3250: 3247: 3246: 3243: 3240: 3235: 3232: 3230: 3226: 3223: 3222: 3219: 3216: 3211: 3208: 3205: 3202: 3201: 3198: 3195: 3190: 3187: 3185: 3181: 3177: 3174: 3173: 3170: 3167: 3162: 3159: 3157: 3153: 3150: 3149: 3146: 3143: 3137: 3135: 3131: 3128: 3127: 3124: 3121: 3115: 3113: 3109: 3106: 3105: 3102: 3099: 3094: 3091: 3089: 3085: 3082: 3081: 3078: 3075: 3070: 3067: 3065: 3061: 3057: 3054: 3053: 3050: 3047: 3045:1 August 1846 3042: 3039: 3037: 3033: 3029: 3026: 3025: 3021: 3018: 3015: 3012: 3011: 3008: 2997: 2994: 2992: 2988: 2985: 2984: 2978: 2975: 2972: 2969: 2968: 2962: 2959: 2957: 2956:Bad Griesbach 2953: 2952:Bad Peterstal 2950: 2949: 2943: 2940: 2938: 2934: 2931: 2930: 2924: 2921: 2919: 2915: 2914: 2908: 2905: 2902: 2899: 2898: 2892: 2889: 2887: 2886:Bad Peterstal 2883: 2880: 2879: 2875: 2872: 2869: 2868: 2865: 2863: 2858: 2856: 2846: 2841: 2838: 2836: 2832: 2829: 2828: 2824: 2819: 2816: 2813: 2810: 2809: 2805: 2800: 2797: 2794: 2791: 2790: 2786: 2781: 2778: 2776: 2772: 2768: 2765: 2764: 2760: 2754: 2751: 2747: 2744: 2743: 2739: 2734: 2731: 2729: 2725: 2722: 2721: 2717: 2712: 2709: 2707: 2703: 2700: 2699: 2695: 2690: 2687: 2685: 2681: 2678: 2677: 2673: 2667: 2665: 2661: 2658: 2657: 2653: 2647: 2645: 2641: 2638: 2637: 2633: 2627: 2625: 2621: 2618: 2617: 2613: 2611:4 August 1870 2608: 2607:Rhine Railway 2605: 2603: 2599: 2594: 2590: 2586: 2583: 2582: 2578: 2573: 2570: 2568: 2564: 2561: 2560: 2556: 2550: 2547: 2543: 2539: 2538: 2534: 2529: 2528:Maxau Railway 2526: 2523: 2522:Maximiliansau 2519: 2516: 2515: 2511: 2509:5 August 1862 2506: 2505:Maxau Railway 2503: 2501: 2497: 2494: 2493: 2489: 2484: 2481: 2479: 2475: 2472: 2471: 2467: 2464: 2461: 2458: 2457: 2454: 2451: 2449: 2445: 2441: 2437: 2433: 2429: 2417: 2414: 2411: 2408: 2407: 2401: 2397: 2394: 2392: 2388: 2385: 2384: 2381:2 March 1914 2377: 2375:goods station 2374: 2370: 2369: 2362: 2359: 2356: 2355: 2348: 2346: 2343: 2339: 2338: 2331: 2329: 2325: 2324: 2317: 2315: 2311: 2310:BrĂĽhl (Baden) 2308: 2307: 2301: 2297: 2294: 2292: 2288: 2285: 2284: 2277: 2274: 2270: 2269: 2266:15 June 1910 2263: 2260: 2258: 2254: 2251: 2250: 2243: 2240: 2237: 2236: 2229: 2226: 2223: 2219: 2218: 2211: 2208: 2205: 2201: 2200: 2193: 2190: 2187: 2186: 2179: 2177:goods station 2176: 2172: 2171: 2164: 2162: 2158: 2157: 2150: 2148: 2147:BrĂĽhl (Baden) 2144: 2140: 2137: 2136: 2129: 2126: 2123: 2122: 2119:31 July 1904 2115: 2113: 2109: 2105: 2104: 2097: 2095: 2091: 2090:Oberuhldingen 2088: 2087: 2081: 2078: 2075: 2071: 2068: 2067: 2061: 2058: 2056: 2052: 2049: 2048: 2042: 2039: 2037: 2033: 2030: 2029: 2022: 2020: 2016: 2013: 2012: 2005: 2002: 1998: 1995: 1994: 1988: 1985: 1983: 1979: 1976: 1975: 1968: 1965: 1964: 1957: 1955: 1952: 1948: 1947: 1941: 1940:Rhine Railway 1938: 1935: 1931: 1927: 1922: 1918: 1914: 1911: 1910: 1903: 1901: 1897: 1894: 1893: 1887: 1884: 1882: 1878: 1877: 1871: 1868: 1866: 1865:Bad Säckingen 1862: 1859: 1858: 1851: 1849: 1845: 1844:Weil am Rhein 1842: 1841: 1835: 1832: 1830: 1826: 1823: 1822: 1816: 1813: 1811: 1807: 1804: 1803: 1796: 1794: 1790: 1787: 1786: 1780: 1777: 1775: 1771: 1767: 1764: 1763: 1760:15 July 1878 1757: 1754: 1752: 1748: 1745: 1744: 1738: 1735: 1732: 1728: 1724: 1721: 1720: 1714: 1711: 1708: 1704: 1703: 1697: 1694: 1691: 1688: 1687: 1681: 1678: 1676: 1672: 1669: 1668: 1662: 1659: 1656: 1652: 1649: 1648: 1642: 1639: 1637: 1633: 1630: 1629: 1623: 1620: 1618: 1614: 1611: 1610: 1604: 1601: 1599: 1595: 1592: 1591: 1585: 1582: 1580: 1576: 1573: 1572: 1565: 1562: 1558: 1557:Weil am Rhein 1555: 1554: 1548: 1545: 1543: 1539: 1536: 1535: 1529: 1526: 1524: 1520: 1517: 1516: 1510: 1507: 1505: 1501: 1498: 1497: 1491: 1488: 1486: 1482: 1479: 1478: 1472: 1469: 1467: 1463: 1462: 1459:25 June 1868 1456: 1453: 1451: 1447: 1444: 1443: 1440:15 June 1868 1437: 1434: 1432: 1428: 1427: 1421: 1418: 1415: 1412: 1411: 1405: 1402: 1399: 1395: 1392: 1391: 1388:20 July 1867 1385: 1382: 1380: 1376: 1373: 1372: 1366: 1363: 1361: 1357: 1354: 1353: 1347: 1344: 1342: 1338: 1334: 1330: 1327: 1326: 1320: 1317: 1315: 1311: 1308: 1307: 1304:13 June 1863 1301: 1298: 1296: 1292: 1288: 1284: 1281: 1280: 1274: 1271: 1269: 1265: 1262: 1261: 1255: 1252: 1250: 1246: 1242: 1239: 1238: 1232: 1229: 1227: 1223: 1220: 1219: 1213: 1210: 1207: 1203: 1200: 1199: 1193: 1190: 1187: 1183: 1180: 1179: 1173: 1170: 1168: 1164: 1161: 1160: 1154: 1151: 1149: 1145: 1144:Bad Säckingen 1142: 1141: 1135: 1132: 1130: 1129:Bad Säckingen 1126: 1123: 1122: 1116: 1113: 1111: 1107: 1104: 1103: 1096: 1094: 1090: 1089: 1083: 1080: 1078: 1074: 1071: 1070: 1064: 1061: 1059: 1055: 1052: 1051: 1048:15 June 1847 1045: 1042: 1040: 1036: 1033: 1032: 1026: 1023: 1021: 1017: 1014: 1013: 1007: 1004: 1002: 998: 995: 994: 991:27 July 1845 987: 985: 981: 978: 977: 971: 968: 966: 962: 959: 958: 952: 949: 947: 943: 940: 939: 933: 930: 928: 924: 921: 920: 914: 911: 909: 905: 901: 898: 897: 891: 888: 886: 882: 879: 878: 872: 869: 867: 863: 860: 859: 855: 852: 849: 848: 845: 839: 837: 835: 831: 827: 826:Bad Säckingen 823: 820:, and on its 819: 815: 811: 793: 791: 789: 785: 781: 777: 773: 765: 761: 757: 754: 750: 746: 743: 740: 736: 733: 732:Bad Griesbach 729: 728:Bad Peterstal 725: 721: 717: 716: 715: 712: 703: 696: 691: 687: 683: 679: 675: 674:Kraichgaubahn 671: 667: 664: 660: 656: 652: 648: 644: 640: 639:Rhine Railway 636: 633: 629: 628:Maxau Railway 625: 624: 623: 620: 618: 614: 610: 606: 602: 598: 597:Wiesentalbahn 594: 585: 583: 581: 573: 570: 566: 563: 562:Weil am Rhein 559: 558:Baden station 555: 552: 549: 546: 543: 542:goods station 539: 536: 533: 530: 526: 525: 524: 517: 513: 509: 505: 501: 500:Rhine Railway 497: 494: 493:Wutachtalbahn 490: 486: 482: 478: 474: 473:Weil am Rhein 470: 467: 463: 459: 458:Höllentalbahn 455: 451: 448: 444: 440: 436: 435:Neckartalbahn 432: 428: 427: 426: 419: 412: 410: 408: 404: 400: 396: 392: 388: 384: 379: 374: 372: 368: 364: 360: 356: 352: 348: 343: 341: 337: 333: 329: 325: 321: 316: 314: 310: 306: 305:Robert Gerwig 297: 295: 293: 289: 285: 281: 277: 273: 269: 265: 260: 256: 252: 247: 245: 240: 216:1,435 mm 209: 207:1,600 mm 202: 195: 191: 189: 185: 181: 177: 173: 169: 165: 161: 157: 153: 149: 145: 141: 133: 127: 123: 121: 115: 113: 109: 104: 100: 96: 92: 88: 84: 80: 72: 65: 60: 58: 56: 52: 48: 44: 43:German Empire 40: 31: 27: 19: 3936:WĂĽrttemberg 3895: 3883:Länderbahnen 3842:Länderbahnen 3757: 3747: 3737: 3728: 3682:in 1862 and 3665: 3643: 3639: 3635: 3631: 3621: 3531:Schaffhausen 3437:Freudenstadt 3350:Ried Railway 3325:Ried Railway 3318:Neckarstadt– 3283:17 July 1875 3260:17 July 1875 3165:26 July 1870 3097:11 June 1868 3005: 2981:15 May 1934 2965:25 May 1933 2859: 2852: 2822:15 July 1887 2660:Schwetzingen 2651:17 July 1873 2644:Schwetzingen 2589:Schwetzingen 2546:Black Forest 2452: 2436:narrow gauge 2427: 2425: 2420:4 June 1915 2321:1 July 1912 2112:Bad DĂĽrrheim 1890:20 May 1890 1874:20 May 1890 1855:20 May 1890 1838:23 May 1887 1800:1 June 1880 1793:Schwetzingen 1783:24 May 1879 1766:NeckargemĂĽnd 1717:15 May 1877 1613:Krauchenwies 1481:Bad Rappenau 1450:Bad Rappenau 1341:Heidingsfeld 1323:2 July 1866 1287:Schaffhausen 1277:1 June 1863 1235:4 July 1861 1216:11 May 1861 1029:1 June 1847 974:1 June 1844 955:1 June 1844 843: 797: 784:Zabergäubahn 783: 769: 752: 730:in 1926 and 724:Renchtalbahn 723: 708: 673: 651:Schwetzingen 642: 631: 621: 613:Schwetzingen 596: 589: 577: 521: 492: 485:Wehratalbahn 484: 457: 439:NeckargemĂĽnd 434: 424: 375: 370: 359:Ludwigshafen 350: 344: 339: 336:Ried Railway 317: 309:Schaffhausen 301: 257:in 1856 and 248: 203: 200: 174:in 1848 and 143: 137: 116: 77: 50: 46: 36: 26: 3911:Mecklenburg 3678:founded in 3653:reparations 3598:K.Bay.Sts.B 3561:Lampertheim 3546:1 June 1897 3465:Sigmaringen 3426:27 May 1882 3406:K.Bay.Sts.B 3294:Pfullendorf 3275:Kreuzlingen 3238:1 June 1874 3193:1 July 1871 3180:Kreuzlingen 3156:Immendingen 3134:Osterburken 3088:Bad Wildbad 2916:RaumĂĽnzach– 2737:1 June 1876 2576:1 June 1869 2540:Dinglingen– 2487:7 June 1862 2438:line, from 2412:–RaumĂĽnzach 2233:1 May 1907 1972:1 May 1895 1961:1 May 1895 1944:1 May 1895 1926:Durmersheim 1917:Blankenloch 1881:Immendingen 1707:Germersheim 1705:Rheinsheim– 1671:Lauchringen 1657:–Rheinsheim 1617:Sigmaringen 1579:Pfullendorf 1561:Saint-Louis 1519:Königshofen 1464:Hochhausen– 1416:–Hochhausen 1333:Osterburken 984:Baden-Baden 936:6 May 1844 917:1 May 1844 840:The network 753:Murgtalbahn 747:The gap in 378:WĂĽrttemberg 373:) in 1866. 184:Baden-Baden 108:Baden-Baden 3951:Categories 3921:Palatinate 3721:References 3680:Heidelberg 3581:Miltenberg 3485:Schramberg 3461:Tuttlingen 3365:Schwaigern 3354:1 May 1880 3253:Winterthur 3251:–Etzwilen– 3184:Romanshorn 3152:Tuttlingen 3028:Heidelberg 3019:Opened on 2971:Tuttlingen 2876:Opened on 2855:B.L.E.A.G. 2844:1 May 1894 2835:Weisenbach 2767:Grötzingen 2724:Appenweier 2702:Schopfheim 2680:Denzlingen 2640:Heidelberg 2598:Eggenstein 2532:8 May 1865 2478:Schopfheim 2465:Opened on 2373:Heidelberg 2253:Weisenbach 2161:Frickingen 2070:Ăśberlingen 2015:Steinsfurt 1982:Ăśberlingen 1978:Stahringen 1934:Roppenheim 1861:Schopfheim 1690:StĂĽhlingen 1675:StĂĽhlingen 1446:Meckesheim 1375:Radolfzell 1245:Meckesheim 1241:Heidelberg 1091:Port line 1054:Schliengen 1039:Schliengen 961:Appenweier 881:Heidelberg 866:Heidelberg 856:Opened on 822:Schopfheim 659:Eggenstein 605:Schopfheim 347:Palatinate 280:Heidelberg 168:Schliengen 152:Heidelberg 103:Strasbourg 66:Foundation 3916:Oldenburg 3535:Jestetten 3500:K.W.St.E. 3489:Schiltach 3478:K.W.St.E. 3454:K.W.St.E. 3441:Schiltach 3382:K.W.St.E. 3309:K.W.St.E. 3298:Aulendorf 3277:–Etzwilen 3242:K.W.St.E. 3225:Pforzheim 3169:K.W.St.E. 3145:K.W.St.E. 3130:Jagstfeld 3123:K.W.St.E. 3112:Villingen 3101:K.W.St.E. 3084:Pforzheim 3077:K.W.St.E. 3056:MĂĽhlacker 3036:Frankfurt 3022:Operator 2903:–Seebrugg 2831:Gernsbach 2812:Ettlingen 2793:Ettlingen 2684:Waldkirch 2602:Karlsruhe 2567:Gernsbach 2496:Karlsruhe 2468:Built by 2400:Königheim 2391:Königheim 2342:Karlsruhe 2273:Offenburg 2108:Villingen 2032:Waldkirch 1951:Karlsruhe 1936:(Alsace)Âą 1921:Karlsruhe 1810:Schiltach 1774:Jagstfeld 1731:MĂĽlhausen 1636:Villingen 1504:Villingen 1485:Jagstfeld 1310:Offenburg 1268:MĂĽhlacker 1264:Pforzheim 1226:Pforzheim 1206:StraĂźburg 1106:Haltingen 1077:Haltingen 997:Offenburg 980:Baden-Oos 946:Offenburg 942:Baden-Oos 927:Baden-Oos 904:Ettlingen 900:Karlsruhe 885:Karlsruhe 808: Hz 788:Leonbronn 755:) in 1928 690:Heilbronn 678:Karlsruhe 663:Karlsruhe 643:Rheinbahn 632:Maxaubahn 512:Karlsruhe 447:Jagstfeld 391:MĂĽhlacker 387:Stuttgart 328:Frankfurt 324:Darmstadt 272:MĂĽhlacker 268:Pforzheim 264:Karlsruhe 253:in 1855, 176:Haltingen 170:in 1847, 166:in 1845, 162:in 1844, 160:Offenburg 158:in 1843, 156:Karlsruhe 3694:See also 3585:Wertheim 3557:Weinheim 3507:Weinheim 3417:Eberbach 3393:Wertheim 3369:Eppingen 3344:Käfertal 3316:Mannheim 3271:Konstanz 3189:Seelinie 3176:Konstanz 3108:Rottweil 3064:Bruchsal 3032:Weinheim 3013:Section 2870:Section 2775:Eppingen 2746:Breisach 2624:Breisach 2585:Mannheim 2459:Section 2300:Hardheim 2296:WalldĂĽrn 2291:Hardheim 2287:WalldĂĽrn 2222:Mannheim 2204:Mannheim 2189:Bruchsal 2139:Mannheim 2019:Eppingen 2001:Amorbach 1997:WalldĂĽrn 1900:WalldĂĽrn 1770:Eberbach 1723:MĂĽllheim 1651:Bruchsal 1594:MeĂźkirch 1542:MeĂźkirch 1538:Stockach 1466:Wertheim 1394:Mannheim 1379:Stockach 1295:Konstanz 1283:Waldshut 1182:Waldshut 1148:Waldshut 1093:Mannheim 862:Mannheim 850:Section 776:KĂĽrnbach 686:Eppingen 647:Mannheim 504:Mannheim 443:Eberbach 399:Bruchsal 383:Bruchsal 355:Mannheim 340:Riedbahn 320:Weinheim 288:WĂĽrzburg 259:Konstanz 255:Waldshut 234: in 148:Mannheim 87:Mannheim 3926:Prussia 3901:Bavaria 3668:Kessler 3644:Griffin 3539:Eglisau 3060:Bretten 2901:Titisee 2882:Oppenau 2771:Bretten 2728:Oppenau 2563:Rastatt 2440:Mosbach 2410:Forbach 2257:Forbach 2143:Rheinau 1930:Rastatt 1896:Seckach 1848:Lörrach 1806:Wolfach 1751:Wolfach 1747:Hausach 1632:Hausach 1329:Mosbach 1314:Hausach 1249:Mosbach 1186:Koblenz 1163:Durlach 923:Rastatt 908:Rastatt 803:⁄ 772:Bretten 742:Titisee 734:in 1933 682:Bretten 516:Rastatt 477:Lörrach 401:route ( 395:Bretten 363:Bavaria 284:Mosbach 244:rebuilt 229:⁄ 61:History 3931:Saxony 3413:Erbach 3320:Biblis 3249:Singen 3182:Hafen– 2750:Colmar 2664:Speyer 2358:Singen 2314:Ketsch 2036:Elzach 1598:Mengen 1429:Engen– 1356:Singen 1291:Singen 617:Speyer 564:, 1913 313:Singen 99:Alsace 3906:Hesse 3896:Baden 3636:Greif 2674:N.N. 2654:N.N. 2518:Maxau 2500:Maxau 2444:Mudau 2175:Basel 1414:Lauda 1360:Engen 1337:Lauda 814:Basel 786:) at 726:) to 601:Basel 351:Pfalz 251:Basel 91:Basel 79:Baden 3642:and 3640:Lion 3634:and 3632:Löwe 3570:1905 3520:1895 3389:Lohr 3229:Calw 2860:The 2542:Lahr 2371:New 2340:New 2326:New 2271:New 2220:New 2202:New 2173:New 1949:New 1202:Kehl 965:Kehl 758:The 737:The 668:The 637:The 626:The 567:New 556:New 540:New 527:New 452:The 429:The 357:and 182:and 180:Kehl 150:and 37:The 774:to 599:) ( 460:), 437:), 89:to 3953:: 3690:. 3663:. 2110:)– 812:, 676:) 645:) 502:, 479:, 236:) 122:. 3805:e 3798:t 3791:v 3638:( 3618:. 3583:– 3559:– 3543:– 3537:– 3533:– 3509:– 3493:– 3487:– 3463:– 3439:– 3415:– 3391:– 3367:– 3342:– 3302:– 3296:– 3280:– 3273:– 3257:– 3227:– 3178:– 3154:– 3138:– 3132:– 3116:– 3110:– 3086:– 3062:– 3058:– 3034:– 3030:– 2989:– 2954:– 2935:– 2884:– 2833:– 2773:– 2769:– 2752:Âą 2748:– 2726:– 2704:– 2682:– 2662:– 2642:– 2628:– 2622:– 2600:– 2595:– 2591:– 2587:– 2565:– 2551:– 2548:) 2544:( 2524:Âą 2520:– 2498:– 2476:– 2442:– 2428:Âą 2398:– 2389:– 2378:– 2363:– 2349:– 2332:– 2312:– 2298:– 2289:– 2278:– 2255:– 2244:– 2230:– 2212:– 2194:– 2180:– 2165:– 2145:– 2141:- 2130:– 2116:– 2098:– 2092:– 2076:Âą 2072:– 2053:– 2034:– 2023:– 2017:– 2003:Âą 1999:– 1980:– 1969:– 1958:– 1932:– 1928:– 1923:– 1919:– 1915:– 1898:– 1863:– 1852:– 1846:– 1827:– 1808:– 1797:– 1791:– 1772:– 1768:– 1749:– 1733:Âą 1729:– 1725:– 1709:Âą 1673:– 1653:– 1634:– 1615:– 1596:– 1577:– 1566:– 1563:Âą 1559:– 1540:– 1521:– 1502:– 1483:– 1448:– 1400:Âą 1396:– 1377:– 1358:– 1339:– 1335:– 1331:– 1312:– 1293:– 1289:– 1285:– 1266:– 1247:– 1243:– 1224:– 1208:Âą 1204:– 1188:Âą 1184:– 1165:– 1146:– 1127:– 1108:– 1097:– 1075:– 1056:– 1037:– 1018:– 999:– 988:– 982:– 963:– 944:– 925:– 906:– 902:– 883:– 864:– 824:– 816:– 805:3 801:2 782:( 762:– 751:( 722:( 684:– 680:– 672:( 661:– 657:– 653:– 649:– 641:( 630:( 615:– 607:– 603:– 595:( 514:– 510:– 506:– 491:( 483:( 475:– 464:– 456:( 445:– 441:– 433:( 397:– 393:– 389:– 369:( 349:( 338:( 326:– 322:- 286:– 282:– 278:( 270:– 266:– 231:2 227:1 224:+ 222:8 218:( 210:( 142:( 49:( 20:)

Index

Grand Duchy of Baden State Railways

Grand Duchy of Baden
German Empire
Deutsche Reichsbahn

Baden
Duchy of Brunswick
Mannheim
Basel
Friedrich List
Alsace
Strasbourg
Baden-Baden
Karl Friedrich Nebenius
Grand Duchy of Baden State Railways

Baden Mainline
Mannheim
Heidelberg
Karlsruhe
Offenburg
Freiburg im Breisgau
Schliengen
Efringen-Kirchen
Haltingen
Kehl
Baden-Baden
Swiss Confederation

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑