Construction is expected to start in October 2018 at an estimated total cost of US$ 2.5 billion. The Isaka–Rusumo section, measuring approximately 371 kilometres (231 mi) of relatively flat terrain in Tanzania, will cost a total of US$ 942 million. The more mountainous Rusumo–Kigali section in
697: 302:
reported that both countries had agreed to change the railway design to accommodate electric locomotives which are faster than the original diesel-powered equipment. In April 2018, the same newspaper further reported that the
228:
of Rwanda. From here the line would continue westward, through Rwanda, to end at Kigali, the capital and largest city of the country. The total length of the railway line is estimated at about 571 kilometres (355 mi).
812: 323:, approximately 20.5 kilometres (13 mi), by road, east of Kigali city center, on which the passenger terminal of the SGR will be built. The cargo terminal will be built in 291:
The construction is expected to be financed jointly by the governments of Tanzania and Rwanda. As of January 2018, the feasibility studies for this project have been concluded.
611: 275:
when completed. After offloading at the existing internal container depot (ICD) at Isaka, the goods would be loaded on this standard gauge railway line for transport to
668: 856: 470: 861: 295:
Rwanda, measuring approximately 150 kilometres (93 mi), will cost a total of US$ 847 million. Burundi has put its standard gauge railway project on hold.
831: 749: 836: 554: 582: 809: 441: 841: 531: 846: 851: 418: 280: 268: 158: 272: 336: 413: 408: 641:"Distance between Rwanda Post Office, Iposita, KN 4 Street, Kigali, Kigali City, Rwanda and Ndera, Kigali City, Rwanda" 391: 394:
pledged to lend US$ 200 million towards the establishment of the "Central Tanzania Standard Gauge Railway Line".
328: 370:
was awarded a second contract worth US$ 1.92 billion to construct the line between Morogoro and Makutupora. The
504: 225: 271:. Goods would either travel to Isaka from Dar es Salaam on the existing narrow-gauge railway line, or on the 720: 153: 783: 446: 403: 371: 499: 209: 316: 346:
newspaper reported that the budgeted cost for the Rwanda section had increased to US$ 1.3 billion.
725: 343: 216:, in Tanzania. The line would travel in a general northwesterly direction to the border town of 161: 327:, another neighborhood, approximately 17 kilometres (11 mi), by road, south-east of the 213: 816: 754: 673: 616: 587: 559: 475: 299: 221: 324: 217: 145: 698:"Distance between Kigali, Kigali City, Rwanda and Masaka, Kigali, Kigali City, Rwanda" 825: 355: 252: 442:"Magufuli: Construction of Isaka-Kigali standard gauge railway to start this year" 117: 251:
in) railway line is intended to ease the transfer of goods between the port of
779:"Nairobi-based bank to lend Tanzania $ 400 million for SGR railway, gas plant" 532:"Rwanda, Tanzania Agree to Construct Isaka-Kigali Standard Gauge Railway Line" 375: 304: 76: 256: 363: 201: 181: 49: 260: 508: 387: 379: 367: 359: 332: 276: 189: 185: 58: 54: 778: 383: 320: 205: 177: 45: 612:"Tanzania turns to World Bank to fund its modern railway project" 264: 810:
Rwanda Bypasses Uganda For Its Own Standard Gauge Railway Line
366:
section is under construction. In September 2017, a firm from
583:"Rwanda, Tanzania agree on electric SGR, opt for open tender" 471:"Building of Isaka-Kigali railway to start in December 2018" 374:
has advertised for designing and building services for the
750:"Regional bank to help Tanzania fund SGR, gas plant" 500:"Rwanda, Tanzania agree on SGR from Isaka to Kigali" 307:
had expressed its willingness to fund this project.
669:"Rwanda's SGR cargo, passenger terminals confirmed" 152: 116: 108: 103: 95: 90: 82: 72: 67: 38: 30: 25: 20: 748:Erick Kabendera, and Allan Olingo (16 July 2018). 721:"Rwanda to spend $ 1.3 billion on railway project" 362:is being built in sections. The Dar es Salaam to 390:sections of the railway line. In July 2018, the 176:is a planned railway line linking the town of 8: 555:"Isaka-Kigali SGR works to start in October" 255:and the city of Kigali, and subsequently to 273:Dar es Salaam–Mwanza Standard Gauge Railway 335:. Rwanda has plans to extend the SGR to 430: 857:Government-owned companies of Tanzania 662: 660: 658: 17: 719:Karuhanga, James (12 December 2018). 469:Onyango, Emmanuel (29 October 2018). 436: 434: 7: 862:Government-owned companies of Rwanda 200:The railway line would start at the 832:Standard gauge railways in Tanzania 174:Isaka–Kigali Standard Gauge Railway 21:Isaka–Kigali Standard Gauge Railway 667:Kabona, Esiara (14 January 2018). 553:Kabona, Esiara (29 January 2018). 14: 837:Standard gauge railways in Rwanda 696:Globefeed.com (30 January 2018). 639:Globefeed.com (19 January 2018). 86:Tanzania–Rwanda Railway Authority 777:Mwaipaja, Benny (11 July 2018). 450:. Dar es Salaam. 15 January 2018 419:East African Railway Master Plan 354:The standard gauge railway from 281:East African Railway Master Plan 269:Democratic Republic of the Congo 610:Olingo, Allan (29 April 2019). 581:Olingo, Allan (18 March 2018). 337:Bugesera International Airport 1: 530:Aine, Kim (14 January 2018). 414:Rwanda Standard Gauge Railway 409:Uganda Standard Gauge Railway 237:This 1435 mm (4 ft 279:. The line is part of wider 842:International railway lines 534:. Kampala: Chimpreports.com 878: 498:Xinhua (15 January 2018). 392:Trade and Development Bank 847:Railway lines in Tanzania 329:central business district 112:571 km (355 mi) 505:The Independent (Uganda) 852:Railway lines in Rwanda 815:7 February 2020 at the 784:The Citizen (Tanzania) 447:The Citizen (Tanzania) 404:Standard-gauge railway 372:government of Tanzania 342:In December 2018, the 202:inland container depot 315:In January 2018, the 210:Kahama Rural District 317:government of Rwanda 319:allocated space in 726:New Times (Rwanda) 170: 169: 166: 162:overhead catenary 869: 797: 796: 794: 792: 774: 768: 767: 765: 763: 745: 739: 738: 736: 734: 716: 710: 709: 707: 705: 693: 687: 686: 684: 682: 664: 653: 652: 650: 648: 636: 630: 629: 627: 625: 607: 601: 600: 598: 596: 578: 572: 571: 569: 567: 550: 544: 543: 541: 539: 527: 521: 520: 518: 516: 495: 489: 488: 486: 484: 466: 460: 459: 457: 455: 438: 250: 249: 245: 242: 226:Eastern Province 214:Shinyanga Region 164: 148: 142: 140: 139: 135: 132: 124: 18: 877: 876: 872: 871: 870: 868: 867: 866: 822: 821: 817:Wayback Machine 806: 801: 800: 790: 788: 787:. Dar es Salaam 776: 775: 771: 761: 759: 755:The EastAfrican 747: 746: 742: 732: 730: 718: 717: 713: 703: 701: 700:. Globefeed.com 695: 694: 690: 680: 678: 674:The EastAfrican 666: 665: 656: 646: 644: 643:. Globefeed.com 638: 637: 633: 623: 621: 617:The EastAfrican 609: 608: 604: 594: 592: 588:The EastAfrican 580: 579: 575: 565: 563: 560:The EastAfrican 552: 551: 547: 537: 535: 529: 528: 524: 514: 512: 497: 496: 492: 482: 480: 476:The EastAfrican 468: 467: 463: 453: 451: 440: 439: 432: 427: 400: 352: 313: 300:The EastAfrican 298:In March 2018, 289: 247: 243: 240: 238: 235: 222:Kirehe District 198: 184:to the city of 154:Electrification 144: 137: 133: 130: 128: 127:4 ft  126: 122: 99:2022 (Expected) 63: 12: 11: 5: 875: 873: 865: 864: 859: 854: 849: 844: 839: 834: 824: 823: 820: 819: 805: 804:External links 802: 799: 798: 769: 740: 711: 688: 654: 631: 602: 573: 545: 522: 490: 461: 429: 428: 426: 423: 422: 421: 416: 411: 406: 399: 396: 351: 348: 312: 309: 288: 285: 234: 231: 218:Rusumo, Rwanda 197: 194: 168: 167: 159:25 kV 50 Hz AC 156: 150: 149: 146:standard gauge 120: 114: 113: 110: 106: 105: 101: 100: 97: 93: 92: 88: 87: 84: 80: 79: 74: 70: 69: 65: 64: 62: 61: 52: 42: 40: 36: 35: 32: 28: 27: 23: 22: 13: 10: 9: 6: 4: 3: 2: 874: 863: 860: 858: 855: 853: 850: 848: 845: 843: 840: 838: 835: 833: 830: 829: 827: 818: 814: 811: 808: 807: 803: 786: 785: 780: 773: 770: 757: 756: 751: 744: 741: 728: 727: 722: 715: 712: 699: 692: 689: 676: 675: 670: 663: 661: 659: 655: 642: 635: 632: 619: 618: 613: 606: 603: 590: 589: 584: 577: 574: 562: 561: 556: 549: 546: 533: 526: 523: 511: 510: 506: 501: 494: 491: 478: 477: 472: 465: 462: 449: 448: 443: 437: 435: 431: 424: 420: 417: 415: 412: 410: 407: 405: 402: 401: 397: 395: 393: 389: 385: 381: 377: 373: 369: 365: 361: 357: 356:Dar es Salaam 349: 347: 345: 340: 338: 334: 330: 326: 322: 318: 310: 308: 306: 301: 296: 292: 286: 284: 282: 278: 274: 270: 266: 262: 258: 254: 253:Dar es Salaam 232: 230: 227: 223: 219: 215: 211: 207: 203: 195: 193: 191: 187: 183: 179: 175: 163: 160: 157: 155: 151: 147: 123:1,435 mm 121: 119: 115: 111: 107: 102: 98: 94: 89: 85: 81: 78: 75: 71: 66: 60: 56: 53: 51: 47: 44: 43: 41: 37: 33: 29: 24: 19: 16: 789:. Retrieved 782: 772: 760:. Retrieved 753: 743: 731:. Retrieved 724: 714: 702:. Retrieved 691: 679:. Retrieved 672: 645:. Retrieved 634: 622:. Retrieved 615: 605: 593:. Retrieved 586: 576: 564:. Retrieved 558: 548: 536:. Retrieved 525: 513:. Retrieved 503: 493: 481:. Retrieved 474: 464: 452:. Retrieved 445: 353: 341: 314: 297: 293: 290: 287:Construction 236: 199: 173: 171: 15: 733:13 December 350:In Tanzania 333:Kigali City 118:Track gauge 109:Line length 83:Operator(s) 826:Categories 704:30 January 681:19 January 647:19 January 566:29 January 538:19 January 515:19 January 483:29 October 454:19 January 425:References 376:Makutupora 305:World Bank 77:Heavy rail 758:. Nairobi 677:. Nairobi 620:. Nairobi 591:. Nairobi 479:. Nairobi 344:New Times 311:In Rwanda 257:Bujumbura 208:, in the 204:(ICD) at 165:(planned) 104:Technical 813:Archived 729:. Kigali 624:29 April 595:24 March 507:Quoting 398:See also 364:Morogoro 233:Overview 196:Location 182:Tanzania 141: in 50:Tanzania 26:Overview 791:16 July 762:16 July 267:in the 263:and to 261:Burundi 246:⁄ 224:in the 136:⁄ 91:History 68:Service 39:Termini 34:Planned 509:Xinhua 388:Mwanza 380:Tabora 368:Turkey 360:Mwanza 325:Masaka 277:Kigali 190:Rwanda 186:Kigali 96:Opened 59:Rwanda 55:Kigali 31:Status 384:Isaka 321:Ndera 220:, in 206:Isaka 178:Isaka 46:Isaka 793:2018 764:2018 735:2018 706:2018 683:2018 649:2018 626:2018 597:2018 568:2018 540:2018 517:2018 485:2018 456:2018 265:Goma 172:The 73:Type 358:to 331:of 259:in 212:of 188:in 180:in 828:: 781:. 752:. 723:. 671:. 657:^ 614:. 585:. 557:. 502:. 473:. 444:. 433:^ 339:. 283:. 192:. 143:) 57:, 48:, 795:. 766:. 737:. 708:. 685:. 651:. 628:. 599:. 570:. 542:. 519:. 487:. 458:. 386:- 382:- 378:- 248:2 244:1 241:+ 239:8 138:2 134:1 131:+ 129:8 125:(

Index

Isaka
Tanzania
Kigali
Rwanda
Heavy rail
Track gauge
standard gauge
Electrification
25 kV 50 Hz AC
overhead catenary
Isaka
Tanzania
Kigali
Rwanda
inland container depot
Isaka
Kahama Rural District
Shinyanga Region
Rusumo, Rwanda
Kirehe District
Eastern Province
Dar es Salaam
Bujumbura
Burundi
Goma
Democratic Republic of the Congo
Dar es Salaam–Mwanza Standard Gauge Railway
Kigali
East African Railway Master Plan
The EastAfrican

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.