310:
26:
296:
273:
was completed in 1997. 230-kilometre (140 mi) JAGAL II from Baruth to Rückersdorf was constructed in 1999. The section from the border to
Mallnow has a diameter of 1,400 millimetres (55 in) while rest of the pipeline has a diameter of 1,400 millimetres (55 in). It has a capacity of
268:
and 11-kilometre (6.8 mi) long connection from Lebus to
Mallnow compressor station was built. This section was completed in 1996. The 97-kilometre (60 mi) second section of JAGAL from Mallnow to
225:. The pipeline is used for the Russian natural gas import and it is owned and operated by Gascade Gastransport GmbH. It runs from the Polish–German border at
397:
392:
375:
234:
114:
222:
87:
25:
246:
242:
104:
230:
348:
301:
386:
328:
315:
270:
134:
100:
61:
252:
Construction of the JAGAL pipeline started in 1995, when a double duct between
291:
257:
309:
65:
51:
261:
238:
118:
323:
253:
226:
83:
265:
204:
193:
185:
177:
169:
164:
156:
148:
140:
130:
125:
110:
94:
79:
71:
57:
47:
42:
18:
249:-operated long-distance gas pipeline No. 302.
354:. PLEcon Pipeline Engineering Consulting GmbH
8:
24:
237:. In Rückersdorf JAGAL is connected with
241:pipeline carrying gas further west. In
340:
349:"Bernau measuring and control station"
15:
181:24 billion cubic meters per year
7:
284: m) of natural gas per year.
14:
398:Natural gas pipelines in Germany
308:
294:
274:840 billion cubic feet (24
393:1999 establishments in Germany
194:
1:
221:) is a German section of the
245:JAGAL is connected with the
219:Jamal-Gas-Anbindungsleitung
414:
189:1,200 mm (47 in)
173:338 km (210 mi)
144:Gascade Gastransport GmbH
35:
23:
376:JAGAL (Gascade website)
197:of compressor stations
223:Yamal-Europe pipeline
165:Technical information
88:Yamal-Europe pipeline
30:Yamal-Europe pipeline
149:Construction started
205:Compressor stations
126:General information
247:Verbundnetz Gas AG
212:
211:
178:Maximum discharge
105:Bernau bei Berlin
72:General direction
37:Location of JAGAL
405:
363:
362:
360:
359:
353:
345:
318:
313:
312:
304:
299:
298:
297:
280:
279:
231:Frankfurt (Oder)
196:
28:
16:
413:
412:
408:
407:
406:
404:
403:
402:
383:
382:
372:
367:
366:
357:
355:
351:
347:
346:
342:
337:
314:
307:
300:
295:
293:
290:
277:
275:
264:was laid under
103:
99:
64:
38:
31:
12:
11:
5:
411:
409:
401:
400:
395:
385:
384:
379:
378:
371:
370:External links
368:
365:
364:
339:
338:
336:
333:
332:
331:
326:
320:
319:
305:
302:Germany portal
289:
286:
210:
209:
206:
202:
201:
198:
191:
190:
187:
183:
182:
179:
175:
174:
171:
167:
166:
162:
161:
158:
154:
153:
150:
146:
145:
142:
138:
137:
132:
128:
127:
123:
122:
117:(connected to
112:
108:
107:
96:
95:Passes through
92:
91:
86:(connected to
81:
77:
76:
73:
69:
68:
59:
55:
54:
49:
45:
44:
40:
39:
36:
33:
32:
29:
21:
20:
13:
10:
9:
6:
4:
3:
2:
410:
399:
396:
394:
391:
390:
388:
381:
377:
374:
373:
369:
350:
344:
341:
334:
330:
329:OPAL pipeline
327:
325:
322:
321:
317:
316:Energy portal
311:
306:
303:
292:
287:
285:
283:
272:
267:
263:
259:
255:
250:
248:
244:
240:
236:
232:
228:
224:
220:
216:
207:
203:
199:
192:
188:
184:
180:
176:
172:
168:
163:
159:
155:
151:
147:
143:
139:
136:
133:
129:
124:
120:
116:
113:
109:
106:
102:
97:
93:
89:
85:
82:
78:
74:
70:
67:
63:
60:
56:
53:
50:
46:
41:
34:
27:
22:
17:
380:
356:. Retrieved
343:
281:
251:
218:
214:
213:
157:Commissioned
271:Baruth/Mark
235:Rückersdorf
135:natural gas
115:Rückersdorf
101:Baruth/Mark
75:north–south
62:Brandenburg
387:Categories
358:2010-07-16
335:References
121:pipeline)
66:Thuringia
288:See also
186:Diameter
141:Operator
43:Location
258:Górzyca
208:Mallnow
98:Mallnow
52:Germany
48:Country
262:Poland
243:Bernau
239:STEGAL
170:Length
119:STEGAL
352:(PDF)
324:MEGAL
254:Lebus
229:near
227:Lebus
215:JAGAL
84:Lebus
58:State
19:JAGAL
266:Oder
256:and
160:1999
152:1995
131:Type
80:From
260:in
233:to
195:No.
389::
278:10
111:To
361:.
282:^
276:×
217:(
200:1
90:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.