323:
194:
189:
346:. Designed by Jones-Stuckey Ltd., the construction was completed on November 14, 2003, after only sixteen months, five months ahead of schedule. The bridge is 113 meters (371 feet) in length, carrying six 3.5 meters (11 feet) wide lanes for vehicle traffic, as well as two 3.5 meter sidewalks. The cable stayed design was chosen for aesthetic reasons, as well as having a smaller potential for
22:
133:
387:, which opened in 1919. By 1998, it was determined that the bridge was deteriorating; thus a replacement was needed. Construction on the new bridge started on February 27, 2002, with the old bridge being demolished on November 25 of the same year, after the
503:
483:
498:
350:
on the river environment. The anchorages for the cables, at 47 tons (104,000 lbs), are noted as being the heaviest single pieces of steel ever to be
39:
488:
478:
105:
150:
86:
58:
365:
193:
43:
411:
493:
65:
143:
388:
72:
427:
359:
32:
347:
54:
435:
Sherman, Mark (2001). "Effective Use of Public
Involvement to Achieve Aesthetic Quality in Bridge Design".
322:
371:
335:
452:
79:
444:
339:
207:
412:
http://enr.ecnext.com/free-scripts/comsite2.pl?page=enr_document&article=netear030120
377:
354:. Total price for the project was US$ 15.6 million with the following funding sources:
343:
472:
456:
392:
384:
21:
351:
165:
152:
383:
Previously, traffic on Lane Avenue was carried by a 3 lane earth filled
132:
197:
448:
321:
504:
Transportation buildings and structures in
Franklin County, Ohio
263:
15:
283:
Jones-Stuckey Ltd., Civil
Engineering Firm, Columbus, Ohio
311:
303:
295:
287:
279:
274:
258:
250:
242:
234:
229:
221:
213:
203:
181:
142:
123:
46:. Unsourced material may be challenged and removed.
8:
120:
484:Cable-stayed bridges in the United States
106:Learn how and when to remove this message
404:
188:
7:
430:. Franklin County Engineer's Office.
44:adding citations to reliable sources
326:Another view of the bridge at night
499:Steel bridges in the United States
14:
372:Franklin County Engineer's Office
192:
187:
131:
20:
31:needs additional citations for
437:Transportation Research Record
366:Federal Highway Administration
259:
1:
360:Ohio Public Works Commission
137:The bridge looking Northeast
520:
428:"Lane Avenue Bridge Story"
489:Bridges in Columbus, Ohio
479:Bridges completed in 2003
348:environmental degradation
316:
268:4 westbound, 2 eastbound,
130:
389:final home football game
342:in the American city of
246:370 ft (113 m)
225:Franklin County Engineer
376:$ 2.4 million from the
370:$ 3.2 million from the
327:
166:40.006500°N 83.02200°W
364:$ 5 million from the
358:$ 5 million from the
325:
494:Road bridges in Ohio
171:40.006500; -83.02200
55:"Lane Avenue Bridge"
40:improve this article
336:cable-stayed bridge
217:Columbus, Ohio, USA
162: /
118:Bridge in Ohio, USA
332:Lane Avenue Bridge
328:
288:Construction start
125:Lane Avenue Bridge
320:
319:
307:November 14, 2003
116:
115:
108:
90:
511:
460:
431:
414:
409:
378:City of Columbus
296:Construction end
261:
196:
191:
190:
177:
176:
174:
173:
172:
167:
163:
160:
159:
158:
155:
135:
121:
111:
104:
100:
97:
91:
89:
48:
24:
16:
519:
518:
514:
513:
512:
510:
509:
508:
469:
468:
467:
449:10.3141/1770-23
434:
426:
423:
421:Further reading
418:
417:
410:
406:
401:
340:Olentangy River
269:
230:Characteristics
208:Olentangy River
186:
170:
168:
164:
161:
156:
153:
151:
149:
148:
138:
126:
119:
112:
101:
95:
92:
49:
47:
37:
25:
12:
11:
5:
517:
515:
507:
506:
501:
496:
491:
486:
481:
471:
470:
466:
465:External links
463:
462:
461:
432:
422:
419:
416:
415:
403:
402:
400:
397:
381:
380:
374:
368:
362:
344:Columbus, Ohio
318:
317:
314:
313:
309:
308:
305:
301:
300:
297:
293:
292:
289:
285:
284:
281:
277:
276:
272:
271:
266:
256:
255:
252:
251:Piers in water
248:
247:
244:
240:
239:
236:
232:
231:
227:
226:
223:
219:
218:
215:
211:
210:
205:
201:
200:
183:
179:
178:
146:
140:
139:
136:
128:
127:
124:
117:
114:
113:
28:
26:
19:
13:
10:
9:
6:
4:
3:
2:
516:
505:
502:
500:
497:
495:
492:
490:
487:
485:
482:
480:
477:
476:
474:
464:
458:
454:
450:
446:
442:
438:
433:
429:
425:
424:
420:
413:
408:
405:
398:
396:
394:
390:
386:
379:
375:
373:
369:
367:
363:
361:
357:
356:
355:
353:
349:
345:
341:
337:
333:
324:
315:
310:
306:
302:
298:
294:
290:
286:
282:
278:
273:
267:
265:
257:
253:
249:
245:
241:
237:
233:
228:
224:
222:Maintained by
220:
216:
212:
209:
206:
202:
199:
195:
184:
180:
175:
147:
145:
141:
134:
129:
122:
110:
107:
99:
88:
85:
81:
78:
74:
71:
67:
64:
60:
57: –
56:
52:
51:Find sources:
45:
41:
35:
34:
29:This article
27:
23:
18:
17:
440:
436:
407:
393:Ohio Stadium
382:
331:
329:
270:2 pedestrian
243:Total length
238:Cable Stayed
102:
93:
83:
76:
69:
62:
50:
38:Please help
33:verification
30:
385:arch bridge
185:Lane Avenue
169: /
144:Coordinates
473:Categories
399:References
395:, nearby.
352:galvanized
157:83°01′19″W
154:40°00′23″N
66:newspapers
457:111216701
443:: 181–7.
338:over the
312:Location
280:Designer
96:May 2013
275:History
204:Crosses
182:Carries
80:scholar
455:
304:Opened
235:Design
214:Locale
82:
75:
68:
61:
53:
453:S2CID
334:is a
264:lanes
87:JSTOR
73:books
441:1770
330:The
299:2003
291:2002
59:news
445:doi
391:at
262:of
260:No.
42:by
475::
451:.
439:.
459:.
447::
254:1
198:1
109:)
103:(
98:)
94:(
84:·
77:·
70:·
63:·
36:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.