458:. A total of 10,973 MW of power was added by the government during its tenure, mostly via private sector investments. In terms of public sector projects conducted by provincial governments in view of the 2010 amendment, KPK government led with the addition of 1,670 MW to the national grid. It was followed by Sindh and Punjab governments which contributed 935 MW and 580 MW respectively. Balochistan government didn't inaugurate any public sector power project during its tenure. 41: 3153: 3199: 722: 736: 30: 278:, while contributing to the growth of domestic demand for electricity through large-scale provision of bank loans for the purchase of air-conditioners and home appliances (share of domestic energy consumption had jumped to 46% of the total by 2008), did not add any new capacity to the energy system. In 2012 Pakistan's first wind power installation came online at the 507:
estimates that there is a shortage of 6 gigawatts or about 60% of its total generation. One of the main reasons of the shortage is thought to be the failure of past governments to anticipate growth in need and the delay in implementation of projects to increase power production. In addition there is
450:
The 2010 amendment to Pakistan's Constitution (para. 3), empowered each province to formulate the policy framework for the development of public and private sector power generation. This has led to the formation of dedicated provincial departments and empowered public sector companies specialized in
246:
and issues 70 Memorandum of Understandings (MOUs) and Letters of Intent (LOIs) to Independent Power Producers (IPPs). This 1994 energy policy brought a decisive shift in Pakistan's diverse energy sources. In 1994, out of the total installed capacity of 11000 MW, ~60% of energy was produced from
461:
However, despite the massive addition of power to the national grid, glaring issues existed in the power sector. There was no viable overhaul done to the electricity transport infrastructure which lead to episodes of plant tripping and extended blackouts during the summer months. Furthermore, there
502:
Experts have warned of an impending energy crisis since 2006. Speaking at a Seminar 'Fueling the Future: Meeting Pakistan's Energy Needs in the 21st Century' held in Washington, D.C. in June 2006 then energy adviser to the prime minister of Pakistan Mukhtar Ahmed stated that the country was taking
103:
on imported oil for power generation to 50% by 2030. After much public criticism, the long-term energy security policy was announced in 2013 through the introduction of equal cutting-edge energy transmission network, minimising financial losses across the energy system and aligning the ministries
498:
can last 6–8 hours a day in the cities and many more in the rural areas. According to Mahnaz Parach of Network for Consumer Protection "Children can't do their homework. Housework doesn't get done, as washing machines and other appliances cannot work. When you go home from work, you have no idea
611:
Chamber of Commerce warned the situation would get worse if authorities used force to implement the decision. There was confusion over implementation of the two-day weekend, and many banks and educational institutions remained open. Commenting on the defiant mood of the traders, an editorial in
639:
The prevailing energy crisis in Pakistan is taking away 2 percent (or Rs 380 billion) of the economy, despite the government has spent Rs 1.1 trillion as subsidies on the sector in the last four-year which accounts for 2.5 percent of the total volume of economy.
694:
is pending for a long time to receive PNG from Iran for the needs of both Pakistan and India. However, due to the sharp deterioration in India-Pakistan relations, the pipeline is currently changed to be used only by Iran and Pakistan. Pakistan is also planning the
119:
regulates the energy sources network as well as determining the financial prices of the usage of energy. Government-specific energy-efficiency incentive programs also play a significant role in the overall energy policy of Pakistan. As of 2013 Prime Minister
255:, this mix was reversed from 60:40 to 30:70 in favour of thermal capacity based on imported fuel. Every year, this ratio went down further to 20:80 in winter months as hydropower generation was reduced due to lower water flows in the rivers. 1586: 416:, the programme failed to resolve electricity shortage, which private energy companies failed to maintain and upgrade despite being part of their contract. After much criticism and public demonstration in 2012, the 696: 3360: 3187: 1797: 2319: 322: 577:
Since the early 1990s, the country has observed the highest growth rate in usage of computers that effect the supply of the electricity produced in the system. In a survey published by the
1984: 1825: 2068: 99:. There is also an intense criticism about the unequal distribution of energy, the irresponsible usage of energy sources, and the country's new plan which is aimed to raise country's 3130: 2293: 1596: 1711: 3011: 478:, Pakistan has strengthened energy cooperation with Russia and Central Asian countries and imported electricity from Iran. In early 2024, Pakistan officially approved the 1196: 3180: 1765: 515:, while describing the power situation in Pakistan as "unacceptable," has stated that the US would go to its "absolute limits" to help Pakistan overcome the crisis. 3217: 2469: 2386: 1855: 1956: 3227: 2886: 2621: 258:
Controversially, the energy policy depended less on renewable energy sources and dependence on imported oil increased that created a permanent fault in country's
2208: 2154: 2346: 262:
system. By 1995, only 27 IPPs were able to generate ~6,335 MW of electricity. By 1998, the ratio was stabilised by the policies enforced by Prime Minister
185: 2561: 404:
were banned and the official weekend was extended from one to two days in an attempt to conserve electricity. Under this policy, several attempts were made by
3330: 2544: 175: 116: 3173: 3165: 1564: 531:
and decorative lights have been banned. Power has been cut to government offices by 50% and air conditioners will only be allowed to be switched on after
3432: 1223: 647:
had said that the government realised the enormity of the challenge of energy shortage and was determined to overcome it in the shortest possible time.
2040: 2240: 873: 707: 2626: 1316: 749: 307:
the energy sector by international mega energy corporations. Controversially, this program was aimed to raise dependence on imported oil from the
207:, with the financial funds provided by various countries and international monetary sources. In the 1960s, much of the energy was produced by the 143: 1833: 451:
renewables to foster and execute power projects through public, private and public–private partnership modes using indigenous power resources.
251:
power sources while nearly ~40% was produced from the thermal and nuclear sources. According to the economic statistics provided by economist,
112: 170: 842: 2609: 2186: 490:
Due to rising demand and a failing power infrastructure severe electricity shortages have occurred in Pakistan. This has led to widespread
267: 148: 108: 1022: 462:
was still a wide demand and supply gap during high temperature months which led to periodic, planned load-shedding. Finally, the issue of
3345: 3115: 3074: 2847: 2517: 2457: 1367: 279: 56:, which address the issues of energy production, distribution, and consumption of energy, such as gas mileage and petroleum standards. 3313: 3294: 3277: 3272: 3267: 3203: 3125: 2896: 2859: 2527: 2411: 2263: 1271: 1249: 2122: 91:, 2007), but no comprehensive long-term energy strategies were implemented. Since 1999, many legislative provisions were adopted for 3417: 2948: 2923: 2522: 2339: 2290: 3006: 2881: 475: 779: 3370: 3135: 2943: 2837: 996: 621:
Reacting to the decision to curtail power supply to Karachi, the "City of Lights", leaders of various political parties in the
504: 435:
was appointed Federal Minister, Water and Power of the Pakistan Government in May, 2013. Within two months, he was replaced by
366: 1200: 691: 479: 349:, and to close the market places by 9 pm; such policy enforcement was harshly resisted by the left-wing parties, such as 3422: 3318: 3254: 3140: 2869: 2788: 2423: 754: 160: 1775: 337:
12.5 billion for power production-related projects which remained unused. In his last policy statement, Prime Minister
1934: 1739: 454:
This tenure's energy policy was aimed at aggressively building power generation capacity through early-harvest projects in
3427: 3380: 3222: 3026: 2832: 2820: 2616: 2599: 2554: 2512: 2464: 2363: 1110: 440: 138: 1619: 633:
warned that curtailing the power supply of the city could lead to street battles between protesters and law enforcement.
3375: 3350: 3335: 3289: 3244: 3234: 3156: 2906: 2901: 2842: 2702: 2653: 2584: 2579: 2507: 2487: 2479: 2428: 2332: 703: 622: 96: 2137: 3412: 3031: 2916: 2690: 2675: 2497: 2492: 2215: 2161: 1647: 421: 303:
program which was aimed to the development of the power infrastructure from all energy sources. This policy relied on
220: 1679: 1227: 424:
the energy sector and issued clear directives to regulate the energy corporations to produce the power generations.
3323: 2418: 809: 1341: 3284: 3120: 2740: 2670: 2532: 2502: 511:
The United States has made improving Pakistan's power infrastructure one of its top priorities. US special envoy
409: 304: 1084: 547:
will be decreased by 300 megawatts to allow fairer distribution of power to the remaining parts of the country.
3239: 2985: 2980: 2963: 2958: 354: 79:
were banned and the official weekend was extended from one to two days in an attempt to conserve electricity (
625:
condemned the decision and some of them called it "a conspiracy to create a law and order situation." Former
124:
has announced a determined and aggressive energy policy to meet the energy challenges and energy management.
3299: 3001: 2854: 2757: 2685: 2658: 2549: 636:
Some analysts have predicted that reduction in the banks' workweek to 5 days will result in revenue losses.
75:
Several mandates and proposals have been called over the years to overlook the energy conservation, such as
971: 907: 543:
debt to power producers allowing them to pay fuel suppliers. Power supply to Pakistan's commercial capital
3304: 2953: 2810: 2798: 2663: 2406: 2100: 2017: 1888: 1829: 1462: 584: 417: 350: 235: 133: 1306:
Asian Development Bank, Access to Clean Energy Investment Program: Summary Sector Assessment: Energy, p.2
587:), uses the internet on daily basis; the internet penetration in the country has reached 16% as of 2013. 535:. Street markets have been asked to close early. Commercial centres except drug stores will be closed at 3384: 3365: 3249: 3079: 3046: 3036: 2876: 2773: 2747: 2695: 2594: 2571: 881: 568: 224: 212: 204: 223:
nuclear power station in Karachi. In the 1980s, the dependence on nuclear sources further grew and the
1911: 1515: 1058: 3021: 2975: 2891: 2864: 2827: 2815: 2712: 2636: 2452: 850: 432: 84: 69: 932: 466:
was still attached to the power sector and reached a record high of Rs. 922 billion in March, 2018.
2970: 2911: 2735: 2707: 2355: 2307: 1418: 710:. The 100,000 bpd of Russian oil imported accounts for two-thirds of Pakistan's daily consumption. 413: 405: 385: 378: 259: 239: 92: 80: 65: 3355: 3057: 2783: 2717: 2311: 2301: 1032: 17: 3389: 3340: 3041: 2803: 2793: 2778: 2680: 2604: 1545: 1168: 679: 512: 100: 447:
served as the first energy minister of the country until the end of the government's tenure.
52:
is formulated and determined by the federal, provincial, and local institutional entities in
3053: 3016: 2073: 2045: 1989: 1961: 1860: 1802: 1716: 1684: 1652: 1535: 1527: 675:
offered to finance for conducting the feasibility study to import 1200 MW power from India.
644: 630: 626: 614: 491: 271: 248: 208: 192: 61: 439:
who served in the role until the ministry was abolished in September, 2017. In its place a
3089: 2589: 2445: 2440: 2435: 2297: 2141: 1883: 1516:"Strategic analysis on the construction of new energy corridor China–Pakistan–Iran–Turkey" 1392: 727: 579: 572: 300: 690:
and re-gasified LNG (RLNG) would be pumped through its pipelines up to the border point.
539:
and wedding celebrations will be limited to three hours. The government will pay off its
2095: 369:
held in 2008, the mismanagement and weak policies led to an intense repetitive cycle of
334: 308: 231: 40: 1743: 1118: 29: 3406: 3099: 2537: 2381: 1591: 759: 741: 444: 436: 397: 342: 216: 104:
involved in the energy sector as well as improving the governance of energy sources.
57: 1145: 2376: 2371: 2012: 1624: 1289: 495: 374: 370: 338: 330: 326: 319: 315: 296: 275: 263: 121: 88: 252: 203:
In the 1960s, a large civilian energy input and infrastructure was built by the
1531: 717: 672: 668: 608: 76: 33: 1549: 1342:"PTI claims govt only added 1,670 MW to the power grid - The Express Tribune" 1191: 1189: 3084: 2134: 1027: 735: 548: 528: 401: 389: 346: 1657: 1565:"Pakistan approves work on long-awaited Iran-Pakistan gas pipeline project" 1689: 508:
widespread power theft and lack of investment in the existing power grid.
499:
whether there will be electricity at home. Your whole life is disturbed."
3198: 1620:"Pakistan to impose wedding curfew as power shortages cause civil unrest" 524: 393: 243: 53: 1540: 1393:"[Initiatives] Energy Department, Govt. of the Punjab, Pakistan" 819: 603:
in defiance of the ban. Shops were kept open in other cities also after
215:
power stations. In the 1970s, Pakistan's energy consumption expanded to
663:
town. Pakistan is also actively considering to import electricity from
544: 2324: 3094: 1770: 814: 660: 596: 396:
and possible steps to relieve it. With immediate effect, the gaseous
392:
with energy experts that discussed the causes of the power crisis in
227:
continued engineering and building the nuclear power infrastructure.
1489: 1436: 599:
rejected the government's decision and kept the markets open after
2752: 1514:
Guo, Fei-fei; Huang, Cheng-feng; Wu, Xiao-ling (1 November 2019).
683: 664: 373:
in the country. Responding to a massive demonstration against the
39: 28: 1272:"PML-N's Abid Sher Ali appointed as new state minister for power" 655:
Pakistan is already importing small quantity of electricity from
656: 455: 377:
and the growing power shortages in the country, Prime Minister,
3169: 2328: 1985:"Traders reject Malik's warning, refuse to close shops at 8 pm" 1826:"Pakistan War on Power Deficit to Shut Offices, Ban Neon Signs" 1466: 1226:. Nationalization and Privatization in Pakistan. Archived from 1052: 1050: 527:. The official weekend has been extended from one to two days. 2209:"India, Pakistan may shake hands on electricity, hydrocarbons" 1199:. Prime Minister's Inspection Commission. 2013. Archived from 687: 494:
that have paralysed industry and led to protests and rioting.
329:
to invest in country's energy sector. In 2007, Prime Minister
2241:"India-Pakistan-Iran pipeline remains the most viable option" 965: 963: 961: 959: 957: 955: 953: 2069:"Karachi lights being turned off to overcome energy crisis" 1368:"Sindh contributes 935 MW wind energy in national grid: CM" 1317:"PML-N govt added 10,973 MW electricity to system, NA told" 1023:"We will oppose domination of Indian Ocean: Shaukat Aziz" 706:
in June 2023 to prevent energy price hikes caused by the
60:
requires the proper legislation, international treaties,
1935:"30m internet users in Pakistan, half on mobile: Report" 1146:"Pakistan's PM announces energy policy to tackle crisis" 1740:"Crisis talks as power shortages hit Pakistan industry" 311:
for power generation to be increased by 50.1% by 2013.
1250:"A caretaker minister makes his way into real cabinet" 997:"50 MW wind power project connected to national grid" 1490:"Energy sector circular debt touches record Rs922bn" 1437:"Parts of Punjab, KP hit by massive power breakdown" 1085:"Saudi investment invited in energy, mining sectors" 238:(PPP) launched the country's first ever and largest 219:
sources with the establishment and commissioning of
3108: 3067: 2994: 2936: 2766: 2726: 2644: 2635: 2570: 2478: 2395: 2362: 2155:"Pakistan all set to import electricity from India" 2123:
Economic cost of energy crisis estimated at Rs380bn
1169:"Pakistanis Living on Brink, and Often in the Dark" 686:border from India. India would import the required 595:In the days following the announcement, traders in 412:the energy sector. Devised by the Finance Minister 388:had held a three-day national energy conference in 384:The policy was announced after the Prime Minister, 83:, 2010) and reducing the electricity load used by 901: 899: 559:. The measures will be reviewed on 30 July 2010. 523:Measures are aimed at cutting consumption by 500 107:Studies and policy implementation recommended by 3218:National Aerospace Science & Technology Park 2470:Securities & Exchange Commission of Pakistan 1587:"Pakistan turns off lights to end energy crisis" 697:Turkmenistan–Afghanistan–Pakistan–India pipeline 381:announced the "energy policy" on 22 April 2010. 2187:"Adani mulls exporting electricity to Pakistan" 1290:"Awais Leghari made Minister of Power Division" 1224:"Nationalization and Privatization in Pakistan" 186:Electricity and energy corporations in Pakistan 2135:Disengagement not an option: President Zardari 1914:. Pakistan Telecommunications. 3 December 2008 908:"Ambitious' national energy policy formulated" 3181: 2340: 2013:"Two holidays: confusion over implementation" 1798:"US to help Pakistan tide over energy crisis" 1111:"Traders agree to close markets at 9 pm" 470:Strengthen regional cooperation: 2019–present 64:and incentives to investment, guidelines for 8: 2545:Pakistan and the International Monetary Fund 1766:"Pakistan announces measures to save energy" 474:At the same time as the construction of the 318:held conversation with the officials of the 176:National Electric Power Regulatory Authority 583:, around ~30 million citizens (out of 3188: 3174: 3166: 2641: 2347: 2333: 2325: 2264:"Russian Oil Shipment Arrives in Pakistan" 95:including the seeking energy from various 2096:"Two-day weekend to hurt banks' earnings" 1539: 843:"Shaukat and Jatoi take up energy policy" 2562:Pakistani economic crisis (2022–present) 2308:Video: Power cuts anger Pakistan traders 1957:"Traders defy order of markets' closure" 1884:"Energy conservation strategy announced" 1742:. Reuters. 22 April 2010. Archived from 1712:"Electricity shortfall reaches 6,000 MW" 1680:"Pakistan needs to tackle energy crisis" 167:Energy and power regulatory authorities 144:Private Power & Infrastructure Board 1140: 1138: 1136: 1057:Syed Mohibullah Shah (8 October 2011). 872:Syed Mohibullah Shah (8 October 2011). 804: 802: 800: 770: 750:Effects of global warming on South Asia 618:urged everybody to find middle ground. 44:Development of carbon dioxide emissions 702:Pakistan started importing discounted 503:steps to address the energy shortage. 2320:Energy crisis in Pakistan in Pictures 1912:"Computers and its Usage in Pakistan" 1856:"Gilani vows to reduce load-shedding" 1417:Baloch, Sanaullah (29 January 2018). 810:"Steps taken to tackle energy crisis" 780:"CCI approves National Energy Policy" 678:Pakistan is also exploring to import 171:Water and Power Development Authority 7: 3361:Scientific and technological history 1167:Tavernise, Sabrina (26 April 2010). 551:will not be allowed to operate from 149:Alternative Energy Development Board 72:and other public policy techniques. 607:. Kashif Shabbir, president of the 519:Power sources and electrical energy 128:Energy authorities and institutions 3331:List of inventions and discoveries 3204:Science and technology in Pakistan 2412:Governor of State Bank of Pakistan 2262:Kugelman, Michael (14 June 2023). 1117:. Labour Unity Org. Archived from 25: 3433:Government of Yousaf Raza Gillani 2523:Medium Term Development Framework 1197:"Effects of Power Sector Reforms" 1021:Muralidhar Reddy (8 March 2005). 3197: 3152: 3151: 734: 720: 476:China-Pakistan Economic Corridor 1832:. 22 April 2010. Archived from 1774:. 22 April 2010. Archived from 1595:. 22 April 2010. Archived from 1488:Kiani, Khaleeq (2 March 2018). 906:Bhatti, Sohail (22 July 2013). 818:. 22 April 2010. Archived from 505:Pakistan Electric Power Company 341:further called for banning the 242:program to produce 13,000  18:Pakistan national energy policy 2924:Mobile phone network operators 2291:Video: Pakistan's Power Crisis 1688:. 24 June 2006. Archived from 1656:. 29 July 2006. Archived from 970:Aziz, Sartaj (23 April 2013). 755:Electricity sector in Pakistan 161:Electricity sector in Pakistan 1: 2465:Pakistan Bureau of Statistics 1618:Shah, Saeed (21 April 2010). 1465:. 4 June 2018. Archived from 2429:Finance Minister of Pakistan 1648:"Major energy crisis feared" 1063:The News International, 2011 878:The News International, 2008 643:During June 2012, President 623:Provincial Assembly of Sindh 486:Conservation and consumption 1419:"No energy for Balochistan" 3449: 3116:Central business districts 3075:Central business districts 3068:Central business districts 1532:10.1016/j.egyr.2019.06.007 1089:The Dawn News, areastudies 1059:"Energised, yet powerless" 976:Pakistan Today, April 2013 692:Iran–Pakistan gas pipeline 651:International co-operation 566: 480:Iran–Pakistan gas pipeline 115:(as policy enforcer), the 87:by 25% during peak hours ( 3210: 3149: 2533:National debt of Pakistan 874:"Energized yet powerless" 280:FFCEL Wind Energy Project 157:Industrial energy sector 50:energy policy of Pakistan 3418:Energy policy by country 2458:Federal Board of Revenue 1933:websedk (24 June 2013). 1397:www.energy.punjab.gov.pk 563:Consumption by computers 314:In 2006, Prime Minister 299:announced the long-term 295:In 2005, Prime Minister 230:In 1994, Prime Minister 97:renewable energy sources 3136:Pakistanis by net worth 2887:Cottage and small scale 2779:Entertainment and Media 2758:Pakistan Stock Exchange 2550:Foreign aid to Pakistan 2518:Economic Liberalization 2387:State-owned enterprises 2144:, Geo News, 1 June 2012 2125:, The News, 1 June 2012 1083:APP (7 November 2006). 937:www.pakistanarmy.gov.pk 778:Staff (1 August 2013). 357:and the labour unions. 3314:Information technology 2897:Information technology 2860:Science and technology 2811:Healthcare in Pakistan 2528:Periods of stagflation 2407:State Bank of Pakistan 2160:. 2014. Archived from 2101:The News International 2018:The News International 1889:The News International 1830:Bloomberg Businessweek 1463:"Daily Power Position" 1423:The News International 682:via pipe line through 428:Energy Policy: 2013–18 420:government decided to 361:Energy Policy: 2010–13 351:Pakistan Peoples Party 291:Energy policy: 2008–10 236:Pakistan Peoples Party 134:Government of Pakistan 45: 37: 3423:Energy policy in Asia 3264:Non-renewable energy 3223:Aeronautical industry 3126:International ranking 3080:I. I. Chundrigar Road 2513:Islamic economization 972:"Who is responsible?" 841:Staff (12 May 2007). 591:Variations by regions 569:Computing in Pakistan 323:Ministry of Petroleum 43: 32: 3428:Policies of Pakistan 2882:Books and publishing 2296:22 July 2011 at the 1148:. BBC. 22 April 2010 433:Musadik Masood Malik 182:Energy corporations 3371:Automotive industry 3319:Telecommunications 2356:Economy of Pakistan 2140:2 June 2012 at the 2041:"Traders' defiance" 1563:Islamuddin, Sajid. 1346:The Express Tribune 1276:The Express Tribune 1222:Amin, Mohd. Ramiz. 659:to supply power to 414:Abdul Hafeez Shaikh 274:and Prime Minister 268:military government 260:energy conservation 240:energy conservation 93:energy conservation 66:energy conservation 3413:Energy in Pakistan 3336:List of scientists 3141:Standard of living 3027:Khyber Pakhtunkhwa 2995:Domestic economies 2870:Telecommunications 2312:Al Jazeera English 2302:The New York Times 1746:on 1 February 2013 1173:The New York Times 1121:on 20 October 2013 441:Ministry of Energy 209:hydroelectric dams 139:Ministry of Energy 46: 38: 3400: 3399: 3290:Renewable energy 3245:Defence industry 3235:Antarctic program 3163: 3162: 2937:People and labour 2932: 2931: 2600:National highways 1937:. Express Tribune 1296:. 6 October 2017. 1294:Business Recorder 847:AAJ News Archives 513:Richard Holbrooke 492:rolling blackouts 406:Gilani government 367:general elections 270:led by President 205:Pakistan military 16:(Redirected from 3440: 3351:Military history 3202: 3201: 3190: 3183: 3176: 3167: 3155: 3154: 3131:Provinces by GDP 3017:Gilgit-Baltistan 2654:Renewable energy 2642: 2610:Railway stations 2488:Numbering system 2424:Finance ministry 2349: 2342: 2335: 2326: 2279: 2278: 2276: 2274: 2259: 2253: 2252: 2250: 2248: 2237: 2231: 2230: 2228: 2226: 2220: 2214:. Archived from 2213: 2205: 2199: 2198: 2196: 2194: 2183: 2177: 2176: 2174: 2172: 2166: 2159: 2151: 2145: 2132: 2126: 2120: 2114: 2113: 2111: 2109: 2092: 2086: 2085: 2083: 2081: 2065: 2059: 2058: 2056: 2054: 2037: 2031: 2030: 2028: 2026: 2009: 2003: 2002: 2000: 1998: 1981: 1975: 1974: 1972: 1970: 1953: 1947: 1946: 1944: 1942: 1930: 1924: 1923: 1921: 1919: 1908: 1902: 1901: 1899: 1897: 1880: 1874: 1873: 1871: 1869: 1852: 1846: 1845: 1843: 1841: 1836:on 25 April 2010 1822: 1816: 1815: 1813: 1811: 1794: 1788: 1787: 1785: 1783: 1762: 1756: 1755: 1753: 1751: 1736: 1730: 1729: 1727: 1725: 1708: 1702: 1701: 1699: 1697: 1676: 1670: 1669: 1667: 1665: 1644: 1638: 1637: 1635: 1633: 1615: 1609: 1608: 1606: 1604: 1583: 1577: 1576: 1574: 1572: 1567:. Anadolu Ajansı 1560: 1554: 1553: 1543: 1511: 1505: 1504: 1502: 1500: 1485: 1479: 1478: 1476: 1474: 1459: 1453: 1452: 1450: 1448: 1433: 1427: 1426: 1414: 1408: 1407: 1405: 1403: 1389: 1383: 1382: 1380: 1378: 1364: 1358: 1357: 1355: 1353: 1338: 1332: 1331: 1329: 1327: 1313: 1307: 1304: 1298: 1297: 1286: 1280: 1279: 1268: 1262: 1261: 1259: 1257: 1252:. Thenews.com.pk 1246: 1240: 1239: 1237: 1235: 1219: 1213: 1212: 1210: 1208: 1193: 1184: 1183: 1181: 1179: 1164: 1158: 1157: 1155: 1153: 1142: 1131: 1130: 1128: 1126: 1115:Labour Unity Org 1106: 1100: 1099: 1097: 1095: 1080: 1074: 1073: 1071: 1069: 1054: 1045: 1044: 1042: 1040: 1031:. Archived from 1018: 1012: 1011: 1009: 1007: 993: 987: 986: 984: 982: 967: 948: 947: 945: 943: 929: 923: 922: 920: 918: 903: 894: 893: 891: 889: 880:. Archived from 869: 863: 862: 860: 858: 849:. Archived from 838: 832: 831: 829: 827: 822:on 28 April 2010 806: 795: 794: 792: 790: 775: 744: 739: 738: 730: 725: 724: 723: 645:Asif Ali Zardari 631:Naimatullah Khan 627:Nazim of Karachi 606: 602: 585:180 million 558: 554: 542: 538: 534: 272:Pervez Musharraf 193:Karachi Electric 85:industrial units 21: 3448: 3447: 3443: 3442: 3441: 3439: 3438: 3437: 3403: 3402: 3401: 3396: 3228:Space programme 3206: 3196: 3194: 3164: 3159: 3145: 3104: 3090:Gulberg, Lahore 3063: 2990: 2928: 2917:Medical tourism 2848:Pharmaceuticals 2762: 2728: 2722: 2691:Rice production 2676:Fuel extraction 2646: 2631: 2566: 2498:Nationalization 2493:Five-Year Plans 2474: 2436:Pakistani rupee 2399: 2397: 2391: 2358: 2353: 2314:, 22 April 2010 2304:, 26 April 2010 2298:Wayback Machine 2287: 2282: 2272: 2270: 2261: 2260: 2256: 2246: 2244: 2239: 2238: 2234: 2224: 2222: 2221:on 30 June 2014 2218: 2211: 2207: 2206: 2202: 2192: 2190: 2185: 2184: 2180: 2170: 2168: 2167:on 30 June 2014 2164: 2157: 2153: 2152: 2148: 2142:Wayback Machine 2133: 2129: 2121: 2117: 2107: 2105: 2104:. 25 April 2010 2094: 2093: 2089: 2079: 2077: 2067: 2066: 2062: 2052: 2050: 2049:. 25 April 2010 2039: 2038: 2034: 2024: 2022: 2021:. 24 April 2010 2011: 2010: 2006: 1996: 1994: 1993:. 24 April 2010 1983: 1982: 1978: 1968: 1966: 1965:. 23 April 2010 1955: 1954: 1950: 1940: 1938: 1932: 1931: 1927: 1917: 1915: 1910: 1909: 1905: 1895: 1893: 1892:. 23 April 2010 1882: 1881: 1877: 1867: 1865: 1864:. 23 April 2010 1854: 1853: 1849: 1839: 1837: 1824: 1823: 1819: 1809: 1807: 1806:. 20 April 2010 1796: 1795: 1791: 1781: 1779: 1764: 1763: 1759: 1749: 1747: 1738: 1737: 1733: 1723: 1721: 1720:. 18 April 2010 1710: 1709: 1705: 1695: 1693: 1692:on 25 July 2008 1678: 1677: 1673: 1663: 1661: 1660:on 9 April 2009 1646: 1645: 1641: 1631: 1629: 1617: 1616: 1612: 1602: 1600: 1585: 1584: 1580: 1570: 1568: 1562: 1561: 1557: 1513: 1512: 1508: 1498: 1496: 1487: 1486: 1482: 1472: 1470: 1461: 1460: 1456: 1446: 1444: 1435: 1434: 1430: 1416: 1415: 1411: 1401: 1399: 1391: 1390: 1386: 1376: 1374: 1366: 1365: 1361: 1351: 1349: 1348:. 24 March 2018 1340: 1339: 1335: 1325: 1323: 1315: 1314: 1310: 1305: 1301: 1288: 1287: 1283: 1278:. 22 July 2013. 1270: 1269: 1265: 1255: 1253: 1248: 1247: 1243: 1233: 1231: 1230:on 11 June 2014 1221: 1220: 1216: 1206: 1204: 1203:on 14 July 2014 1195: 1194: 1187: 1177: 1175: 1166: 1165: 1161: 1151: 1149: 1144: 1143: 1134: 1124: 1122: 1108: 1107: 1103: 1093: 1091: 1082: 1081: 1077: 1067: 1065: 1056: 1055: 1048: 1038: 1036: 1035:on 4 March 2006 1020: 1019: 1015: 1005: 1003: 995: 994: 990: 980: 978: 969: 968: 951: 941: 939: 933:"PAKISTAN ARMY" 931: 930: 926: 916: 914: 912:Dawn News, 2013 905: 904: 897: 887: 885: 884:on 16 June 2013 871: 870: 866: 856: 854: 853:on 30 June 2017 840: 839: 835: 825: 823: 808: 807: 798: 788: 786: 777: 776: 772: 768: 740: 733: 728:Pakistan portal 726: 721: 719: 716: 708:economic crisis 653: 604: 600: 593: 580:Express Tribune 575: 573:Green computing 567:Main articles: 565: 556: 552: 540: 536: 532: 521: 488: 472: 430: 363: 355:Communist Party 301:energy security 293: 288: 286:Policy overview 266:. In 2001, the 201: 130: 23: 22: 15: 12: 11: 5: 3446: 3444: 3436: 3435: 3430: 3425: 3420: 3415: 3405: 3404: 3398: 3397: 3395: 3394: 3393: 3392: 3387: 3378: 3373: 3363: 3358: 3353: 3348: 3343: 3338: 3333: 3328: 3327: 3326: 3324:Supercomputing 3321: 3311: 3310: 3309: 3308: 3307: 3302: 3297: 3287: 3285:Nuclear energy 3282: 3281: 3280: 3275: 3270: 3262: 3252: 3247: 3242: 3237: 3232: 3231: 3230: 3225: 3220: 3211: 3208: 3207: 3195: 3193: 3192: 3185: 3178: 3170: 3161: 3160: 3150: 3147: 3146: 3144: 3143: 3138: 3133: 3128: 3123: 3118: 3112: 3110: 3106: 3105: 3103: 3102: 3097: 3092: 3087: 3082: 3077: 3071: 3069: 3065: 3064: 3062: 3061: 3051: 3050: 3049: 3044: 3039: 3029: 3024: 3019: 3014: 3009: 3004: 2998: 2996: 2992: 2991: 2989: 2988: 2983: 2978: 2973: 2968: 2967: 2966: 2956: 2951: 2949:Businesspeople 2946: 2940: 2938: 2934: 2933: 2930: 2929: 2927: 2926: 2921: 2920: 2919: 2909: 2904: 2899: 2894: 2889: 2884: 2879: 2874: 2873: 2872: 2867: 2857: 2852: 2851: 2850: 2845: 2840: 2835: 2825: 2824: 2823: 2818: 2808: 2807: 2806: 2801: 2796: 2791: 2786: 2776: 2770: 2768: 2764: 2763: 2761: 2760: 2755: 2750: 2745: 2744: 2743: 2732: 2730: 2724: 2723: 2721: 2720: 2715: 2710: 2705: 2700: 2699: 2698: 2693: 2688: 2678: 2673: 2668: 2667: 2666: 2661: 2650: 2648: 2639: 2633: 2632: 2630: 2629: 2627:Vehicle plates 2624: 2619: 2614: 2613: 2612: 2602: 2597: 2592: 2587: 2582: 2576: 2574: 2572:Transportation 2568: 2567: 2565: 2564: 2559: 2558: 2557: 2547: 2542: 2541: 2540: 2530: 2525: 2520: 2515: 2510: 2505: 2500: 2495: 2490: 2484: 2482: 2476: 2475: 2473: 2472: 2467: 2462: 2461: 2460: 2450: 2449: 2448: 2443: 2433: 2432: 2431: 2421: 2416: 2415: 2414: 2403: 2401: 2393: 2392: 2390: 2389: 2384: 2379: 2374: 2368: 2366: 2360: 2359: 2354: 2352: 2351: 2344: 2337: 2329: 2323: 2322: 2316: 2315: 2305: 2286: 2285:External links 2283: 2281: 2280: 2268:Foreign Policy 2254: 2232: 2200: 2178: 2146: 2127: 2115: 2087: 2060: 2032: 2004: 1976: 1948: 1925: 1903: 1875: 1847: 1817: 1789: 1757: 1731: 1703: 1671: 1639: 1610: 1599:on 8 June 2011 1578: 1555: 1520:Energy Reports 1506: 1480: 1469:on 5 June 2018 1454: 1428: 1409: 1384: 1372:Pakistan Today 1359: 1333: 1321:Pakistan Today 1308: 1299: 1281: 1263: 1241: 1214: 1185: 1159: 1132: 1101: 1075: 1046: 1013: 988: 949: 924: 895: 864: 833: 796: 784:Pakistan Today 769: 767: 764: 763: 762: 757: 752: 746: 745: 731: 715: 712: 652: 649: 592: 589: 564: 561: 541:$ 1.38 billion 520: 517: 487: 484: 471: 468: 429: 426: 362: 359: 309:Arab countries 292: 289: 287: 284: 232:Benazir Bhutto 200: 197: 196: 195: 190: 189: 188: 180: 179: 178: 173: 165: 164: 163: 155: 154: 153: 152: 151: 146: 129: 126: 113:Water ministry 24: 14: 13: 10: 9: 6: 4: 3: 2: 3445: 3434: 3431: 3429: 3426: 3424: 3421: 3419: 3416: 3414: 3411: 3410: 3408: 3391: 3388: 3386: 3382: 3379: 3377: 3374: 3372: 3369: 3368: 3367: 3364: 3362: 3359: 3357: 3354: 3352: 3349: 3347: 3344: 3342: 3339: 3337: 3334: 3332: 3329: 3325: 3322: 3320: 3317: 3316: 3315: 3312: 3306: 3303: 3301: 3300:Solar energy 3298: 3296: 3293: 3292: 3291: 3288: 3286: 3283: 3279: 3276: 3274: 3271: 3269: 3266: 3265: 3263: 3261: 3260:Energy policy 3258: 3257: 3256: 3253: 3251: 3248: 3246: 3243: 3241: 3238: 3236: 3233: 3229: 3226: 3224: 3221: 3219: 3216: 3215: 3213: 3212: 3209: 3205: 3200: 3191: 3186: 3184: 3179: 3177: 3172: 3171: 3168: 3158: 3148: 3142: 3139: 3137: 3134: 3132: 3129: 3127: 3124: 3122: 3121:Foreign trade 3119: 3117: 3114: 3113: 3111: 3107: 3101: 3100:Serai Quarter 3098: 3096: 3093: 3091: 3088: 3086: 3083: 3081: 3078: 3076: 3073: 3072: 3070: 3066: 3059: 3055: 3052: 3048: 3045: 3043: 3040: 3038: 3035: 3034: 3033: 3030: 3028: 3025: 3023: 3020: 3018: 3015: 3013: 3010: 3008: 3005: 3003: 3000: 2999: 2997: 2993: 2987: 2984: 2982: 2981:Trades unions 2979: 2977: 2974: 2972: 2969: 2965: 2962: 2961: 2960: 2957: 2955: 2952: 2950: 2947: 2945: 2942: 2941: 2939: 2935: 2925: 2922: 2918: 2915: 2914: 2913: 2910: 2908: 2905: 2903: 2900: 2898: 2895: 2893: 2890: 2888: 2885: 2883: 2880: 2878: 2875: 2871: 2868: 2866: 2863: 2862: 2861: 2858: 2856: 2853: 2849: 2846: 2844: 2841: 2839: 2836: 2834: 2831: 2830: 2829: 2828:Manufacturing 2826: 2822: 2819: 2817: 2814: 2813: 2812: 2809: 2805: 2802: 2800: 2797: 2795: 2792: 2790: 2787: 2785: 2782: 2781: 2780: 2777: 2775: 2772: 2771: 2769: 2765: 2759: 2756: 2754: 2751: 2749: 2746: 2742: 2741:List of banks 2739: 2738: 2737: 2734: 2733: 2731: 2725: 2719: 2716: 2714: 2711: 2709: 2706: 2704: 2701: 2697: 2694: 2692: 2689: 2687: 2684: 2683: 2682: 2679: 2677: 2674: 2672: 2671:Nuclear power 2669: 2665: 2662: 2660: 2657: 2656: 2655: 2652: 2651: 2649: 2643: 2640: 2638: 2634: 2628: 2625: 2623: 2620: 2618: 2615: 2611: 2608: 2607: 2606: 2603: 2601: 2598: 2596: 2593: 2591: 2588: 2586: 2583: 2581: 2578: 2577: 2575: 2573: 2569: 2563: 2560: 2556: 2553: 2552: 2551: 2548: 2546: 2543: 2539: 2538:circular debt 2536: 2535: 2534: 2531: 2529: 2526: 2524: 2521: 2519: 2516: 2514: 2511: 2509: 2506: 2504: 2503:Privatization 2501: 2499: 2496: 2494: 2491: 2489: 2486: 2485: 2483: 2481: 2477: 2471: 2468: 2466: 2463: 2459: 2456: 2455: 2454: 2451: 2447: 2444: 2442: 2439: 2438: 2437: 2434: 2430: 2427: 2426: 2425: 2422: 2420: 2417: 2413: 2410: 2409: 2408: 2405: 2404: 2402: 2394: 2388: 2385: 2383: 2382:KSE 100 Index 2380: 2378: 2375: 2373: 2370: 2369: 2367: 2365: 2361: 2357: 2350: 2345: 2343: 2338: 2336: 2331: 2330: 2327: 2321: 2318: 2317: 2313: 2309: 2306: 2303: 2299: 2295: 2292: 2289: 2288: 2284: 2269: 2265: 2258: 2255: 2242: 2236: 2233: 2217: 2210: 2204: 2201: 2188: 2182: 2179: 2163: 2156: 2150: 2147: 2143: 2139: 2136: 2131: 2128: 2124: 2119: 2116: 2103: 2102: 2097: 2091: 2088: 2076: 2075: 2070: 2064: 2061: 2048: 2047: 2042: 2036: 2033: 2020: 2019: 2014: 2008: 2005: 1992: 1991: 1986: 1980: 1977: 1964: 1963: 1958: 1952: 1949: 1936: 1929: 1926: 1913: 1907: 1904: 1891: 1890: 1885: 1879: 1876: 1863: 1862: 1857: 1851: 1848: 1835: 1831: 1827: 1821: 1818: 1805: 1804: 1799: 1793: 1790: 1778:on 3 May 2010 1777: 1773: 1772: 1767: 1761: 1758: 1745: 1741: 1735: 1732: 1719: 1718: 1713: 1707: 1704: 1691: 1687: 1686: 1681: 1675: 1672: 1659: 1655: 1654: 1649: 1643: 1640: 1627: 1626: 1621: 1614: 1611: 1598: 1594: 1593: 1592:Khaleej Times 1588: 1582: 1579: 1566: 1559: 1556: 1551: 1547: 1542: 1537: 1533: 1529: 1525: 1521: 1517: 1510: 1507: 1495: 1491: 1484: 1481: 1468: 1464: 1458: 1455: 1443:. 16 May 2018 1442: 1438: 1432: 1429: 1424: 1420: 1413: 1410: 1398: 1394: 1388: 1385: 1373: 1369: 1363: 1360: 1347: 1343: 1337: 1334: 1322: 1318: 1312: 1309: 1303: 1300: 1295: 1291: 1285: 1282: 1277: 1273: 1267: 1264: 1251: 1245: 1242: 1229: 1225: 1218: 1215: 1202: 1198: 1192: 1190: 1186: 1174: 1170: 1163: 1160: 1147: 1141: 1139: 1137: 1133: 1120: 1116: 1112: 1105: 1102: 1090: 1086: 1079: 1076: 1064: 1060: 1053: 1051: 1047: 1034: 1030: 1029: 1024: 1017: 1014: 1002: 1001:nation.com.pk 998: 992: 989: 977: 973: 966: 964: 962: 960: 958: 956: 954: 950: 938: 934: 928: 925: 913: 909: 902: 900: 896: 883: 879: 875: 868: 865: 852: 848: 844: 837: 834: 821: 817: 816: 811: 805: 803: 801: 797: 785: 781: 774: 771: 765: 761: 760:Energy crisis 758: 756: 753: 751: 748: 747: 743: 742:Energy portal 737: 732: 729: 718: 713: 711: 709: 705: 700: 698: 693: 689: 685: 681: 676: 674: 670: 666: 662: 658: 650: 648: 646: 641: 637: 634: 632: 628: 624: 619: 617: 616: 610: 598: 590: 588: 586: 582: 581: 574: 570: 562: 560: 550: 546: 530: 526: 518: 516: 514: 509: 506: 500: 497: 496:Power outages 493: 485: 483: 481: 477: 469: 467: 465: 464:circular debt 459: 457: 452: 448: 446: 445:Awais Leghari 443:was created. 442: 438: 437:Abid Sher Ali 434: 427: 425: 423: 419: 415: 411: 407: 403: 399: 395: 391: 387: 382: 380: 379:Yousaf Gilani 376: 372: 368: 360: 358: 356: 352: 348: 344: 340: 336: 332: 328: 324: 321: 317: 312: 310: 306: 302: 298: 290: 285: 283: 281: 277: 273: 269: 265: 261: 256: 254: 250: 249:hydroelectric 245: 241: 237: 233: 228: 226: 222: 218: 217:nuclear power 214: 210: 206: 198: 194: 191: 187: 184: 183: 181: 177: 174: 172: 169: 168: 166: 162: 159: 158: 156: 150: 147: 145: 142: 141: 140: 137: 136: 135: 132: 131: 127: 125: 123: 118: 114: 110: 105: 102: 98: 94: 90: 86: 82: 78: 73: 71: 67: 63: 59: 58:Energy policy 55: 51: 42: 35: 31: 27: 19: 3259: 3255:Electricity 3240:Architecture 3002:Azad Kashmir 2986:Unemployment 2964:Child labour 2959:Labour force 2944:Billionaires 2645:Resource and 2377:KSE 30 Index 2372:KMI 30 Index 2271:. Retrieved 2267: 2257: 2245:. Retrieved 2235: 2223:. Retrieved 2216:the original 2203: 2191:. Retrieved 2181: 2169:. Retrieved 2162:the original 2149: 2130: 2118: 2106:. Retrieved 2099: 2090: 2078:. Retrieved 2072: 2063: 2051:. Retrieved 2044: 2035: 2023:. Retrieved 2016: 2007: 1995:. Retrieved 1988: 1979: 1967:. Retrieved 1960: 1951: 1939:. Retrieved 1928: 1916:. Retrieved 1906: 1894:. Retrieved 1887: 1878: 1866:. Retrieved 1859: 1850: 1838:. Retrieved 1834:the original 1820: 1808:. Retrieved 1801: 1792: 1780:. Retrieved 1776:the original 1769: 1760: 1748:. Retrieved 1744:the original 1734: 1722:. Retrieved 1715: 1706: 1694:. Retrieved 1690:the original 1683: 1674: 1662:. Retrieved 1658:the original 1651: 1642: 1630:. Retrieved 1625:The Guardian 1623: 1613: 1601:. Retrieved 1597:the original 1590: 1581: 1569:. Retrieved 1558: 1541:10419/243631 1523: 1519: 1509: 1497:. Retrieved 1493: 1483: 1471:. Retrieved 1467:the original 1457: 1445:. Retrieved 1440: 1431: 1422: 1412: 1400:. Retrieved 1396: 1387: 1375:. Retrieved 1371: 1362: 1350:. Retrieved 1345: 1336: 1324:. Retrieved 1320: 1311: 1302: 1293: 1284: 1275: 1266: 1254:. Retrieved 1244: 1232:. Retrieved 1228:the original 1217: 1205:. Retrieved 1201:the original 1176:. Retrieved 1172: 1162: 1150:. Retrieved 1123:. Retrieved 1119:the original 1114: 1104: 1092:. Retrieved 1088: 1078: 1066:. Retrieved 1062: 1037:. Retrieved 1033:the original 1026: 1016: 1004:. Retrieved 1000: 991: 979:. Retrieved 975: 940:. Retrieved 936: 927: 915:. Retrieved 911: 886:. Retrieved 882:the original 877: 867: 855:. Retrieved 851:the original 846: 836: 824:. Retrieved 820:the original 813: 787:. Retrieved 783: 773: 701: 677: 654: 642: 638: 635: 620: 613: 594: 578: 576: 522: 510: 501: 489: 473: 463: 460: 453: 449: 431: 422:nationalised 383: 375:loadshedding 371:loadshedding 364: 327:Ali Al-Naimi 325:and invited 313: 297:Shaukat Aziz 294: 282:in Jhimpir. 276:Shaukat Aziz 264:Nawaz Sharif 257: 229: 202: 122:Nawaz Sharif 106: 74: 49: 47: 26: 3305:Wind energy 3295:Hydro-power 3007:Balochistan 2855:Real estate 2686:Agriculture 2659:Solar power 2508:Corporation 2398:governance, 1571:23 February 1526:: 828–841. 1256:13 February 1125:18 November 1094:18 November 1068:18 November 1039:18 November 704:Russian oil 398:Neon lights 343:Neon lights 305:privatising 253:Sartaj Aziz 3407:Categories 3346:Metallurgy 3214:Aerospace 3047:Rawalpindi 3037:Faisalabad 2954:Demography 2838:Automotive 2799:Television 2789:Newspapers 2664:Wind power 2647:production 2400:regulation 766:References 673:World Bank 669:Tajikistan 609:Rawalpindi 549:Tube wells 529:Neon signs 365:After the 347:Neon signs 333:allocated 101:dependence 77:neon signs 34:Mangla Dam 3385:motorways 3381:Highways 3366:Transport 3250:Education 3085:Blue Area 3022:Islamabad 2877:Transport 2833:Aerospace 2821:Hospitals 2774:Education 2748:Insurance 2727:Financial 2703:Livestock 2617:Dry ports 2595:Motorways 2441:Banknotes 2396:Currency, 2364:Companies 2247:17 August 2225:17 August 2193:17 August 2171:17 August 1550:2352-4847 1028:The Hindu 981:30 August 917:30 August 888:30 August 857:30 August 789:30 August 525:megawatts 410:privatise 390:Islamabad 62:subsidies 3390:Railways 3376:Aviation 3157:Category 3109:See also 2976:Pensions 2892:Forestry 2865:Internet 2729:services 2713:Forestry 2622:Seaports 2605:Railways 2585:Airports 2580:Airlines 2555:U.S. aid 2453:Taxation 2294:Archived 2138:Archived 2108:25 April 2080:24 April 2053:25 April 2025:24 April 1997:24 April 1969:23 April 1896:23 April 1868:22 April 1840:22 April 1810:24 April 1782:22 April 1750:22 April 1724:23 April 1696:24 April 1664:24 April 1632:23 April 1628:. London 1603:22 April 1178:28 April 1152:22 April 1006:23 April 826:23 April 714:See also 400:and the 394:Pakistan 225:military 70:taxation 54:Pakistan 3058:Karachi 2971:Poverty 2912:Tourism 2907:Tobacco 2902:Textile 2843:Defence 2736:Banking 2708:Fishery 2637:Sectors 2590:Bridges 2480:History 2446:Coinage 2273:15 June 1109:Staff. 942:9 April 545:Karachi 213:thermal 199:History 81:Gillani 3356:Mining 3095:Saddar 3042:Lahore 3032:Punjab 2784:Cinema 2718:Mining 2419:Budget 2243:. 2014 2189:. 2014 1941:3 July 1918:3 July 1771:Forbes 1548:  1499:27 May 1473:5 June 1447:27 May 1402:27 May 1377:27 May 1352:27 May 1326:27 May 1234:3 July 1207:3 July 815:Geo TV 661:Gwadar 597:Lahore 386:Gilani 3341:Media 3054:Sindh 2804:Music 2794:Radio 2767:Other 2753:KIBOR 2219:(PDF) 2212:(PDF) 2165:(PDF) 2158:(PDF) 684:Wagha 665:India 557:11 pm 533:11 am 402:signs 320:Saudi 221:first 117:NEPRA 3383:and 3268:Coal 3012:FATA 2816:AIDS 2681:Food 2275:2023 2249:2014 2227:2014 2195:2014 2173:2014 2110:2010 2082:2010 2074:Dawn 2055:2010 2046:Dawn 2027:2010 1999:2010 1990:Dawn 1971:2010 1962:Dawn 1943:2014 1920:2014 1898:2010 1870:2010 1861:Dawn 1842:2010 1812:2010 1803:Dawn 1784:2010 1752:2010 1726:2010 1717:Dawn 1698:2010 1685:Dawn 1666:2010 1653:Dawn 1634:2010 1605:2010 1573:2024 1546:ISSN 1501:2018 1494:Dawn 1475:2018 1449:2018 1441:Dawn 1404:2018 1379:2018 1354:2018 1328:2018 1258:2014 1236:2014 1209:2014 1180:2010 1154:2010 1127:2013 1096:2013 1070:2013 1041:2013 1008:2018 983:2013 944:2022 919:2013 890:2013 859:2013 828:2010 791:2013 667:and 657:Iran 615:Dawn 605:8 pm 601:8 pm 571:and 553:7 pm 537:8 pm 456:CPEC 339:Aziz 331:Aziz 316:Aziz 247:the 211:and 109:AEDB 89:Aziz 48:The 3278:Oil 3273:Gas 2696:Tea 1536:hdl 1528:doi 688:LNG 680:PNG 555:to 418:PPP 408:to 234:of 3409:: 2310:, 2300:, 2266:. 2098:. 2071:. 2043:. 2015:. 1987:. 1959:. 1886:. 1858:. 1828:. 1800:. 1768:. 1714:. 1682:. 1650:. 1622:. 1589:. 1544:. 1534:. 1522:. 1518:. 1492:. 1439:. 1421:. 1395:. 1370:. 1344:. 1319:. 1292:. 1274:. 1188:^ 1171:. 1135:^ 1113:. 1087:. 1061:. 1049:^ 1025:. 999:. 974:. 952:^ 935:. 910:. 898:^ 876:. 845:. 812:. 799:^ 782:. 699:. 671:. 629:, 482:. 353:, 345:, 335:₨. 244:MW 111:, 68:, 3189:e 3182:t 3175:v 3060:) 3056:( 2348:e 2341:t 2334:v 2277:. 2251:. 2229:. 2197:. 2175:. 2112:. 2084:. 2057:. 2029:. 2001:. 1973:. 1945:. 1922:. 1900:. 1872:. 1844:. 1814:. 1786:. 1754:. 1728:. 1700:. 1668:. 1636:. 1607:. 1575:. 1552:. 1538:: 1530:: 1524:5 1503:. 1477:. 1451:. 1425:. 1406:. 1381:. 1356:. 1330:. 1260:. 1238:. 1211:. 1182:. 1156:. 1129:. 1098:. 1072:. 1043:. 1010:. 985:. 946:. 921:. 892:. 861:. 830:. 793:. 36:. 20:)

Index

Pakistan national energy policy

Mangla Dam

Pakistan
Energy policy
subsidies
energy conservation
taxation
neon signs
Gillani
industrial units
Aziz
energy conservation
renewable energy sources
dependence
AEDB
Water ministry
NEPRA
Nawaz Sharif
Government of Pakistan
Ministry of Energy
Private Power & Infrastructure Board
Alternative Energy Development Board
Electricity sector in Pakistan
Water and Power Development Authority
National Electric Power Regulatory Authority
Electricity and energy corporations in Pakistan
Karachi Electric
Pakistan military