Knowledge (XXG)

Merthyr Tramroad

Source 📝

42: 265:) between the inside of the flanges). The plates were 3 ft long weighing 56 lb each and were spiked to rough stone blocks about 18 in square. There were frequent passing loops, at Plymouth Ironworks the line ran through a tunnel only 8 ft high beneath the charging area of the blast furnaces. The average gradient from Merthyr to Abercynon was 1 in 145. Near Quakers Yard two timber bridges carried the line over the 329:
1,600 more plates were broken, of which the Dowlais engines were blamed for smashing 1,450. By July the tramroad was reported to be almost impassable, for two days being blocked by a derailed Dowlais locomotive and Anthony Hill of Plymouth unsuccessfully applied to the Trustees for the locomotives to be banned.
305:
In 1829 Stephenson supplied a six-wheeled locomotive with inclined cylinders mounted at the rear for use on the narrower gauge internal lines at Penydarren, it cost £375. In 1832 it was returned to Stephensons for conversion to a four-wheeled locomotive for use on the Merthyr Tramroad and at the same
313:
Another somewhat similar locomotive (but without a geared rack drive) named "Mountaineer" was built in 1833 by the Neath Abbey Co. for the Dowlais Company. As the drawings included a cross section of the Plymouth tunnel and it had a hinged chimney it was presumably intended to be used on the Merthyr
328:
The locomotives had a maximum 3 ton axle load and plate layers were carried on the trains to replace broken plates. On 1 April, 1839, more than 4,000 plates were required to make the tramway good though little more than half that number had been supplied by the three ironworks. By 22 June that year
309:
The Dowlais Company's line linking their works to the Merthyr Tramroad had a maximum gradient of 1 in 16.5 and considered too steep for locomotives to work by adhesion alone. In 1832 the Neath Abbey Ironworks supplied a six-wheeled rack and adhesion locomotive weighing 8 tons named "Perseverance"
241:
In 1823, a Bill was unsuccessfully promoted to extend the line to Cardiff. It was some of the same promoters who obtained the Act for the Taff Vale Railway in 1836. Although the Taff Vale Railway opened to Merthyr in 1841 it was not until 1851 that the standard gauge Dowlais Railway was completed
280:
Initially one horse pulled about five trams, making one return journey a day. Later trains of about 25 trams hauled by 3 horses became normal. The owners of the line did allow other people to use it on payment of a toll but it is not known if anyone did. Regular locomotive working began in 1832.
223:
A Bill for a tramroad from Merthyr to Cardiff was defeated in Parliament in 1799, by opposition from the Glamorganshire Canal proprietors but the upper section of the proposed line was built anyway, compulsory powers were provided for by provisions in the Glamorganshire Canal Act but were not
237:
In 1815, a wooden bridge over the Taff near Quakers Yard collapsed beneath a train carrying iron from Penydarren. The whole train including the horses, the haulier and four other people riding on it fell into the river killing one horse, badly cutting another and injuring two of the people.
289:
The wagons (or trams) were about 7 ft 6 in long by 4 ft 9 in wide at the top, made of wood strapped with iron and carried on cast iron wheels 2 ft 6 in to 2 ft 9 in diameter. They weighed about 15 cwt and carried at least two tons. There were 250 of them by 1830.
242:
allowing through running to its works. Penydarren Ironworks closed in 1859. Plymouth Works did not cease iron production until 1880 but had built a standard gauge line over part of the tramroad in 1871. South of Mount Pleasant the disused tramroad was lifted in about 1890.
306:
time the single flue was replaced by 82 copper fire tubes. It was at this time given the name "Eclipse" and commenced work on the Merthyr Tramroad on 22 June 1832. The chimney must have been hinged to allow it to go through the Plymouth tunnel.
216:(built 1784). Initially the output of these ironworks was carried by packhorse or on carts 25 miles to Cardiff. In 1794, Cyfarthfa works was linked to Cardiff by the Glamorganshire Canal, the other three ironworks were linked to it by tramways. 230:
The Dowlais company already had edge rail lines of narrower gauge from their works to near the head of the canal at Merthyr and these were converted to 4 ft 4 in gauge plateways to connect with this new line allowing through running.
324:
The last record of spare parts being supplied to Dowlais for these locomotives was in 1840-1841. An 1848 inventory of Dowlais plant lists only "Mountaineer" of the above locomotives. No plateway locomotives were listed in 1856.
179:
due to its use by Trevithick's locomotive, built at the ironworks) was a 9.75-mile-long (15.69 km) line that opened in 1802, connecting the private lines belonging to the Dowlais and Penydarren Ironworks with the
317:
The 0-6-0 "Dowlais" built by Neath Abbey in 1836 had the inclined cylinders mounted at the front (unlike the previous locomotives which had rear mounted cylinders) and rack drive for use on the incline to Dowlais.
301:
built at Penydarren in 1804 made several runs after its famous initial run. On one occasion it was successfully tried hauling 25 tons. It weighed about 5 tons and broke many of the cast iron plate rails.
220:
of Cyfarthfa Ironworks held the controlling interest in the canal company and claimed preferential treatment. The upper heavily locked section of the canal suffered from congestion.
269:
where it runs through a gorge in a large loop. After the collapse of one of these bridges beneath a train in 1815 they were both replaced by brick arches.
227:
The engineer was George Overton and construction began in 1800, under the supervision of Richard Hill of the Plymouth Ironworks. It was completed in 1802.
520: 515: 490: 525: 495: 470: 431: 505: 310:
with inclined cylinders and twin chimneys (allowing them to be lowered alongside the boiler to pass through the tunnel at Plymouth).
445: 360: 245:
Only a single surviving photograph of the tramroad has survived, taken in 1862 and showing widening of the Quaker's Yard viaduct.
188:'s experimental locomotive hauled the first train to carry a load (of 10 tons of iron). It was largely superseded when the 500: 510: 321:"Charles Jordan" delivered from Neath Abbey in 1838 was an adhesion only locomotive very similar to "Mountaineer". 213: 181: 184:
at Abercynon, also serving the Plymouth Ironworks along the way. It is famous as the line, on which
209: 298: 205: 185: 234:
In 1804, Trevithick's pioneering steam locomotive made a few experimental runs along this line.
466: 441: 356: 201: 189: 217: 257:
with a gauge of 4 ft 4 in over the flanges of the L-shaped cast-iron plate rails (or
192:
opened in 1841, and sections gradually went out of use over two decades, from about 1851.
405: 314:
Tramroad (unlike a second smaller locomotive built in 1832 which had a fixed chimney).
435: 484: 41: 17: 153: 266: 254: 82: 272:
Later on chairs were introduced into which the plate rails were keyed.
440:. The Buildings of Wales. London: Penguin Books. p. 536. 376: 374: 372: 355:. Cardiff: National Museum of Wales. pp. 6–10. 200:
The four principal ironworks at Merthyr Tydfil were
152: 144: 139: 131: 116: 101: 96: 88: 77: 72: 64: 56: 51: 34: 8: 346: 344: 342: 399: 397: 395: 393: 391: 389: 338: 380: 31: 7: 25: 521:4 ft 2 in gauge railways in Wales 46:The Merthyr Tramroad, around 1910 412:. THE INDUSTRIAL RAILWAY SOCIETY 40: 516:Transport in Rhondda Cynon Taf 175:(sometimes referred to as the 1: 491:Early Welsh railway companies 410:THE INDUSTRIAL RAILWAY RECORD 526:Railway lines opened in 1802 496:Industrial railways in Wales 253:The line was a single-track 148:9.75 mi (15.69 km) 351:Owen-Jones, Stuart (1981). 542: 506:History of Merthyr Tydfil 406:"STEAM ON THE PENYDARREN" 353:The Penydarren Locomotive 39: 259:4 ft 2 in 159:4 ft 4 in 27:Early Welsh railway line 463:Britain's Lost Railways 299:Trevithick's locomotive 92:Wood strapped with iron 461:Minnis, John (2011). 501:Horse-drawn railways 182:Glamorganshire Canal 177:Penydarren Tramroad 60:Penydarren Tramroad 511:Richard Trevithick 186:Richard Trevithick 18:Penydarren Tramway 472:978-0-7112-6162-4 212:(built 1765) and 190:Taff Vale Railway 169: 168: 16:(Redirected from 533: 476: 452: 451: 428: 422: 421: 419: 417: 401: 384: 378: 367: 366: 348: 264: 260: 218:Richard Crawshay 173:Merthyr Tramroad 164: 160: 127: 125: 112: 110: 68:Ceased operation 44: 35:Merthyr Tramroad 32: 21: 541: 540: 536: 535: 534: 532: 531: 530: 481: 480: 479: 473: 460: 456: 455: 448: 430: 429: 425: 415: 413: 403: 402: 387: 379: 370: 363: 350: 349: 340: 335: 296: 287: 278: 262: 258: 251: 198: 162: 158: 123: 121: 108: 106: 47: 28: 23: 22: 15: 12: 11: 5: 539: 537: 529: 528: 523: 518: 513: 508: 503: 498: 493: 483: 482: 478: 477: 471: 465:. Arum Press. 457: 454: 453: 446: 423: 404:Lewis, M.J.T. 385: 368: 361: 337: 336: 334: 331: 295: 292: 286: 283: 277: 274: 250: 247: 208:(built 1763), 204:(built 1759), 197: 194: 167: 166: 156: 150: 149: 146: 142: 141: 137: 136: 133: 129: 128: 118: 114: 113: 103: 99: 98: 94: 93: 90: 86: 85: 79: 75: 74: 70: 69: 66: 62: 61: 58: 54: 53: 49: 48: 45: 37: 36: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 538: 527: 524: 522: 519: 517: 514: 512: 509: 507: 504: 502: 499: 497: 494: 492: 489: 488: 486: 474: 468: 464: 459: 458: 449: 447:0-14-071056-6 443: 439: 438: 433: 427: 424: 411: 407: 400: 398: 396: 394: 392: 390: 386: 383:, p. 33. 382: 377: 375: 373: 369: 364: 362:0-7200-0239-7 358: 354: 347: 345: 343: 339: 332: 330: 326: 322: 319: 315: 311: 307: 303: 300: 293: 291: 285:Rolling Stock 284: 282: 275: 273: 270: 268: 263:1,270 mm 256: 248: 246: 243: 239: 235: 232: 228: 225: 221: 219: 215: 211: 207: 203: 195: 193: 191: 187: 183: 178: 174: 163:1,321 mm 157: 155: 151: 147: 143: 138: 134: 130: 119: 115: 104: 100: 95: 91: 89:Rolling stock 87: 84: 81:Single-track 80: 76: 71: 67: 63: 59: 57:Other name(s) 55: 50: 43: 38: 33: 30: 19: 462: 436: 432:Newman, John 426: 414:. Retrieved 409: 352: 327: 323: 320: 316: 312: 308: 304: 297: 288: 279: 271: 252: 249:Construction 244: 240: 236: 233: 229: 226: 222: 199: 176: 172: 170: 29: 381:Minnis 2011 294:Locomotives 154:Track gauge 145:Line length 485:Categories 416:7 November 333:References 267:River Taff 214:Penydarren 135:After 1851 437:Glamorgan 276:Operation 224:invoked. 210:Cyfarthfa 140:Technical 117:Completed 102:Commenced 434:(1995). 255:plateway 206:Plymouth 83:plateway 52:Overview 202:Dowlais 196:History 122: ( 107: ( 97:History 73:Service 469:  444:  359:  132:Closed 65:Status 467:ISBN 442:ISBN 418:2012 357:ISBN 171:The 124:1802 120:1802 109:1800 105:1800 78:Type 487:: 408:. 388:^ 371:^ 341:^ 475:. 450:. 420:. 365:. 261:( 165:) 161:( 126:) 111:) 20:)

Index

Penydarren Tramway
Black and white photograph of the tram road next to a wall and a row of houses
plateway
Track gauge
Glamorganshire Canal
Richard Trevithick
Taff Vale Railway
Dowlais
Plymouth
Cyfarthfa
Penydarren
Richard Crawshay
plateway
River Taff
Trevithick's locomotive



ISBN
0-7200-0239-7



Minnis 2011





Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.