195:
203:
29:
249:
decided to replace its corporate headquarters, built in the 1930s, with a much more efficient building. After an architectural competition the ZĂĽrich firm Weber/Hofer was chosen to lead the design effort. In the spring of 2006 construction began on the 3,750 m^2 lot. The site houses a parking
250:
garage, a two story building, and the 19-story office tower. Construction was completed in the late summer of 2008, and the building now provides offices for 600 employees of 13 different companies.
437:
417:
442:
432:
79:
326:, which would normally be excessive and require a great deal of active cooling, given that two thirds of the facade is composed of glazing.
422:
427:
412:
72:
218:
energy efficiency building standard. It was built to house the corporate headquarters of the
Austrian utility company
319:
219:
234:
233:
system, and requires no fossil fuel inputs to maintain a comfortable interior climate, resulting in much lower
194:
376:
246:
334:
Beneath the building, 46 geothermal wells, each 150 m deep were drilled prior to construction.
368:
360:
230:
202:
310:
The Power Tower minimizes its external energy consumption via several integrated systems.
229:
In accordance with the
Passive House standard the building has no connection to the local
351:
Wilk, H. (2009-03-01). ""Power Tower" – Aktiv-Hochhaus der
Energie AG Oberösterreich".
406:
380:
215:
28:
364:
323:
372:
94:
81:
214:
is the first high-rise office tower to attempt to meet the strict
201:
193:
318:
The building envelope was specially engineered to allow maximum
223:
397:
184:
176:
171:
163:
155:
150:
142:
134:
126:
118:
110:
71:
63:
55:
47:
42:
21:
353:E & I Elektrotechnik und Informationstechnik
8:
259:Staff relocated to temporary accommodations
18:
283:Excavation of site and geothermal wells
252:
206:Integrated louvers to manage solar gain.
343:
438:Skyscraper office buildings in Austria
188:Weber & Hofer, ZĂĽrich, Switzerland
7:
418:Sustainable buildings and structures
443:Office buildings completed in 2008
14:
433:Buildings and structures in Linz
27:
125:
330:Geothermal Heating and Cooling
1:
198:The Facade of the Power Tower
16:Office Tower in Linz, Austria
299:Occupation of the building
237:than comparable buildings.
459:
314:Advanced Building Envelope
398:Energie AG Oberösterreich
365:10.1007/s00502-009-0625-5
38:
26:
423:Sustainable architecture
235:carbon dioxide emissions
306:Building Energy Systems
172:Design and construction
33:The Power Tower by day.
207:
199:
205:
197:
95:48.29333°N 14.29056°E
428:Environmental design
291:Construction begins
267:Old building gutted
119:Construction started
413:Low-energy building
91: /
43:General information
275:Demolition begins
208:
200:
100:48.29333; 14.29056
322:while minimizing
303:
302:
192:
191:
185:Architecture firm
151:Technical details
450:
385:
384:
348:
253:
231:district heating
106:
105:
103:
102:
101:
96:
92:
89:
88:
87:
84:
31:
19:
458:
457:
453:
452:
451:
449:
448:
447:
403:
402:
394:
389:
388:
350:
349:
345:
340:
332:
316:
308:
243:
111:Current tenants
99:
97:
93:
90:
85:
82:
80:
78:
77:
34:
17:
12:
11:
5:
456:
454:
446:
445:
440:
435:
430:
425:
420:
415:
405:
404:
401:
400:
393:
392:External links
390:
387:
386:
359:(3): 101–104.
342:
341:
339:
336:
331:
328:
315:
312:
307:
304:
301:
300:
297:
296:September 2008
293:
292:
289:
285:
284:
281:
277:
276:
273:
269:
268:
265:
261:
260:
257:
242:
239:
190:
189:
186:
182:
181:
178:
174:
173:
169:
168:
165:
161:
160:
157:
153:
152:
148:
147:
144:
140:
139:
136:
132:
131:
128:
124:
123:
120:
116:
115:
112:
108:
107:
75:
69:
68:
65:
61:
60:
57:
53:
52:
49:
45:
44:
40:
39:
36:
35:
32:
24:
23:
15:
13:
10:
9:
6:
4:
3:
2:
455:
444:
441:
439:
436:
434:
431:
429:
426:
424:
421:
419:
416:
414:
411:
410:
408:
399:
396:
395:
391:
382:
378:
374:
370:
366:
362:
358:
355:(in German).
354:
347:
344:
337:
335:
329:
327:
325:
321:
313:
311:
305:
298:
295:
294:
290:
287:
286:
282:
279:
278:
274:
271:
270:
266:
264:November 2005
263:
262:
258:
255:
254:
251:
248:
240:
238:
236:
232:
227:
225:
221:
217:
216:Passive House
213:
204:
196:
187:
183:
179:
175:
170:
166:
162:
158:
154:
149:
145:
141:
137:
133:
129:
121:
117:
113:
109:
104:
76:
74:
70:
66:
62:
58:
54:
50:
46:
41:
37:
30:
25:
20:
356:
352:
346:
333:
317:
309:
272:January 2006
244:
228:
211:
209:
177:Architect(s)
56:Town or city
51:Office Tower
320:daylighting
256:August 2005
226:, Austria.
212:Power Tower
156:Floor count
135:Inaugurated
98: /
73:Coordinates
22:Power Tower
407:Categories
338:References
324:solar gain
280:March 2006
247:Energie AG
220:Energie AG
167:22,652 m^2
164:Floor area
138:2008-09-08
114:Energie AG
86:14°17′26″E
83:48°17′36″N
381:207015584
373:1613-7620
127:Completed
288:May 2006
245:In 2004
180:Kaufmann
241:History
67:Austria
64:Country
379:
371:
143:Height
377:S2CID
369:ISSN
224:Linz
210:The
146:74 m
130:2008
122:2006
59:Linz
48:Type
361:doi
357:126
222:in
409::
375:.
367:.
159:19
383:.
363::
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.