213:, a joint railway between the governments of Rwanda and Tanzania. Construction was originally scheduled to begin in October 2018, but has been postponed as the Tanzanian link to the Rwandan border was delayed. The section is budgeted to cost US$ 857 million. A feasibility study for this section has been conducted and demarcation of the corridor is finalized.
303:
for passengers. Rwanda has finalized the demarcation of the corridor for this section. It measures approximately 170 kilometres (106 mi). In May 2023, Uganda and Rwanda agreed to fast-track the section of the
Ugandan SGR connecting to Rwanda. Construction of the Ugandan section is expected to
613:
694:
193:. With no previously existing railway network, Rwanda is developing its railway system from scratch. The project is dependent on the construction of the Tanzanian and Ugandan SGR lines to the Rwandan border, which have not been completed as of October 2023.
221:
When the SGR reaches Kigali, the governments of Rwanda and the DR Congo are expected to work out the modalities for the extension of this railway system to DR Congo territory. The planned section from Kigali to the border district of
532:
230:
is about 150 kilometres (93 mi) long. In June 2019, the government of the DR Congo indicated its willingness to participate in a feasibility study for the SGR to extend to Rubavu and the
Congolese city of
501:
354:
to power its locomotives. This will allow passenger locomotive speeds of 160 kilometres (99 mi) per hour and cargo locomotive speeds of 120 kilometres (75 mi) per hour. In July 2021,
639:
825:
509:
584:
766:
810:
474:
835:
389:
210:
428:
815:
355:
451:
794:
820:
394:
347:
190:
186:
384:
248:
58:
743:
379:
268:
716:
667:
555:
830:
404:
259:
has committed to extending the SGR to
Bugesera International Airport, at a budgeted cost of US$ 85 million.
255:, at the international border with Burundi, is yet to be awarded to a contractor, as of September 2018. The
374:
154:
256:
560:
399:
288:
284:
533:"Distance between Kigali, Nyarugeng, Umujyi Wa Kigali, RWA and Rubavu, Iburengerazuba, RWA"
767:"Rwanda Moves Closer to Adopting Law to Pave Way for SGR, Maritime Transport Developments"
644:
589:
479:
223:
350:. In conformity with its neighbors Uganda and Tanzania, Rwanda will use electricity at
244:
140:
45:
804:
358:
327:
170:
157:(SGR) system, under development, linking the country to the neighboring countries of
272:
166:
181:. The system is expected to link, in the future, to Rwanda's two other neighbors,
326:
in) railway line is intended to ease the transfer of goods between the ports of
209:
This section, measuring 150 kilometres (93 mi), is the
Rwandan half of the
112:
84:
361:
confirmed that construction would begin as soon as the
Tanzanian SGR reaches
339:
292:
280:
276:
227:
49:
614:"Distance between Masaka, Kigali, Rwanda and Nemba Primary School, Rwanda"
243:
This section, measuring about 60 kilometres (37 mi), stretching from
158:
331:
182:
174:
62:
351:
335:
296:
178:
162:
53:
365:. The cost for the railway system is estimated at US$ 1.3 billion.
362:
300:
252:
66:
452:"Tanzania and Rwanda plan to construct a Standard Gauge Railway"
429:"Rwanda Bypasses Uganda For Its Own Standard Gauge Railway Line"
343:
232:
717:"Uganda, Rwanda Resolve to Expedite Kampala-Kigali SGR Project"
695:"Distance between Kagitumba, Rwanda and Masaka, Kigali, Rwanda"
668:"BIG STORY: East Africa Sets Ambitious Targets for SGR Project"
201:
The railway system would consist of several major sections:
556:"Proposed Isaka-Kigali railway could be extended to Rubavu"
165:. It is intended to ease the transfer of goods between the
744:"Tanzania-Rwanda standard-gauge line to be electrified"
502:"Backward-looking JSR report for 2021/22 fiscal year"
304:
begin in
September 2024 and to be completed in 2029.
640:"Rwanda's SGR cargo, passenger terminals confirmed"
111:
103:
98:
90:
80:
75:
38:
30:
25:
20:
271:is built, it will connect to the Rwandan SGR at
795:East African leaders push for quick deal on SGR
8:
475:"Isaka-Kigali SGR works to start in October"
585:"Rwanda-Tanzania SGR To Go To Eastern DRC"
554:Ntirenganya, Emmanuel (12 December 2018).
508:. November 2022. p. 5. Archived from
279:. From there, the line would pass through
416:
450:Kang'ereha, Dorcas (15 January 2018).
299:and terminate at Masaka for cargo and
17:
454:. Nairobi: Construction Review Online
239:Kigali–Bugesera Airport–Nemba Section
7:
826:Government-owned companies of Rwanda
633:
631:
422:
420:
742:Briginshaw, David (12 March 2018).
693:Globefeed.com (19 September 2018).
612:Globefeed.com (19 September 2018).
390:Isaka–Kigali Standard Gauge Railway
211:Isaka–Kigali Standard Gauge Railway
94:Rwanda Transport Development Agency
638:Kabona, Esiara (14 January 2018).
531:Globefeed.com (15 December 2018).
473:Kabona, Esiara (29 January 2018).
356:Rwandan minister of infrastructure
14:
811:Standard gauge railways in Rwanda
583:Emmanuel Onyango (26 June 2019).
427:Mugabo, Peter (15 January 2018).
836:Railway lines under construction
765:Sabiiti, Daniel (27 July 2021).
746:. New York City: Railjournal.com
395:East African Railway Master Plan
348:Democratic Republic of the Congo
191:East African Railway Master Plan
187:Democratic Republic of the Congo
385:Tanzania Standard Gauge Railway
338:in Rwanda and subsequently to
249:Bugesera International Airport
1:
380:Uganda Standard Gauge Railway
312:This 1435 mm (4 ft
269:Uganda Standard Gauge Railway
151:Rwanda Standard Gauge Railway
21:Rwanda Standard Gauge Railway
816:International railway lines
852:
506:Ministry of Infrastructure
431:. Kigali: NewsofRwanda.com
177:, and the Rwandan capital
226:on the northern shore of
107:500 km (310 mi)
263:Kagitumba–Kigali Section
821:Railway lines in Rwanda
375:Standard-gauge railway
155:standard gauge railway
247:, in Kigali, through
217:Kigali–Rubavu Section
205:Rusumo–Kigali Section
257:government of Rwanda
831:Transport in Rwanda
797:As of 26 June 2018.
342:in Burundi, and to
561:New Times (Rwanda)
512:on 27 October 2023
400:Northern Corridor
189:, as part of the
147:
146:
843:
782:
781:
779:
777:
762:
756:
755:
753:
751:
739:
733:
732:
730:
728:
713:
707:
706:
704:
702:
690:
684:
683:
681:
679:
664:
658:
657:
655:
653:
635:
626:
625:
623:
621:
609:
603:
602:
600:
598:
580:
574:
573:
571:
569:
551:
545:
544:
542:
540:
528:
522:
521:
519:
517:
498:
492:
491:
489:
487:
470:
464:
463:
461:
459:
447:
441:
440:
438:
436:
424:
405:Central Corridor
325:
324:
320:
317:
143:
137:
135:
134:
130:
127:
119:
59:Bugesera Airport
18:
851:
850:
846:
845:
844:
842:
841:
840:
801:
800:
791:
786:
785:
775:
773:
764:
763:
759:
749:
747:
741:
740:
736:
726:
724:
715:
714:
710:
700:
698:
697:. Globefeed.com
692:
691:
687:
677:
675:
666:
665:
661:
651:
649:
645:The EastAfrican
637:
636:
629:
619:
617:
616:. Globefeed.com
611:
610:
606:
596:
594:
590:The EastAfrican
582:
581:
577:
567:
565:
553:
552:
548:
538:
536:
535:. Globefeed.com
530:
529:
525:
515:
513:
500:
499:
495:
485:
483:
480:The EastAfrican
472:
471:
467:
457:
455:
449:
448:
444:
434:
432:
426:
425:
418:
413:
371:
322:
318:
315:
313:
310:
199:
139:
132:
128:
125:
123:
122:4 ft
121:
117:
71:
12:
11:
5:
849:
847:
839:
838:
833:
828:
823:
818:
813:
803:
802:
799:
798:
790:
789:External links
787:
784:
783:
757:
734:
708:
685:
659:
627:
604:
575:
546:
523:
493:
465:
442:
415:
414:
412:
409:
408:
407:
402:
397:
392:
387:
382:
377:
370:
367:
309:
306:
265:
264:
241:
240:
219:
218:
207:
206:
198:
195:
145:
144:
141:standard gauge
115:
109:
108:
105:
101:
100:
96:
95:
92:
88:
87:
82:
78:
77:
73:
72:
70:
69:
56:
42:
40:
36:
35:
34:In development
32:
28:
27:
23:
22:
13:
10:
9:
6:
4:
3:
2:
848:
837:
834:
832:
829:
827:
824:
822:
819:
817:
814:
812:
809:
808:
806:
796:
793:
792:
788:
772:
768:
761:
758:
745:
738:
735:
723:. 24 May 2023
722:
718:
712:
709:
696:
689:
686:
674:. 25 May 2023
673:
669:
663:
660:
647:
646:
641:
634:
632:
628:
615:
608:
605:
592:
591:
586:
579:
576:
563:
562:
557:
550:
547:
534:
527:
524:
511:
507:
503:
497:
494:
482:
481:
476:
469:
466:
453:
446:
443:
430:
423:
421:
417:
410:
406:
403:
401:
398:
396:
393:
391:
388:
386:
383:
381:
378:
376:
373:
372:
368:
366:
364:
360:
359:Claver Gatete
357:
353:
349:
345:
341:
337:
333:
329:
328:Dar es Salaam
307:
305:
302:
298:
294:
290:
286:
282:
278:
274:
270:
262:
261:
260:
258:
254:
250:
246:
238:
237:
236:
234:
229:
225:
216:
215:
214:
212:
204:
203:
202:
196:
194:
192:
188:
184:
180:
176:
172:
171:Dar es Salaam
168:
164:
160:
156:
152:
142:
118:1,435 mm
116:
114:
110:
106:
102:
97:
93:
89:
86:
83:
79:
74:
68:
64:
60:
57:
55:
51:
47:
44:
43:
41:
37:
33:
29:
24:
19:
16:
774:. Retrieved
770:
760:
750:19 September
748:. Retrieved
737:
725:. Retrieved
721:ChimpReports
720:
711:
701:19 September
699:. Retrieved
688:
676:. Retrieved
672:ChimpReports
671:
662:
652:19 September
650:. Retrieved
643:
620:19 September
618:. Retrieved
607:
595:. Retrieved
588:
578:
566:. Retrieved
559:
549:
537:. Retrieved
526:
514:. Retrieved
510:the original
505:
496:
486:19 September
484:. Retrieved
478:
468:
458:19 September
456:. Retrieved
445:
435:19 September
433:. Retrieved
311:
273:Mirama Hills
266:
242:
220:
208:
200:
167:Indian Ocean
150:
148:
15:
568:15 December
539:15 December
113:Track gauge
104:Line length
91:Operator(s)
805:Categories
776:27 October
727:27 October
678:27 October
516:27 October
411:References
85:Heavy rail
648:. Nairobi
593:. Nairobi
346:, in the
340:Bujumbura
293:Rwamagana
281:Nyagatare
277:Kagitumba
267:When the
228:Lake Kivu
169:ports of
99:Technical
50:Kagitumba
771:KT PRESS
564:. Kigali
369:See also
308:Overview
197:Location
185:and the
159:Tanzania
136: in
26:Overview
597:27 June
332:Mombasa
321:⁄
289:Gicumbi
285:Gatsibo
183:Burundi
175:Mombasa
131:⁄
76:Service
63:Gisenyi
39:Termini
352:25kVAC
336:Kigali
297:Gasabo
245:Masaka
224:Rubavu
179:Kigali
163:Uganda
54:Kigali
46:Rusumo
31:Status
363:Isaka
334:, to
301:Ndera
253:Nemba
153:is a
67:Nemba
778:2023
752:2018
729:2023
703:2018
680:2023
654:2018
622:2018
599:2019
570:2018
541:2018
518:2023
488:2018
460:2018
437:2018
344:Goma
330:and
233:Goma
173:and
161:and
149:The
81:Type
251:to
807::
769:.
719:.
670:.
642:.
630:^
587:.
558:.
504:.
477:.
419:^
295:,
291:,
287:,
283:,
235:.
138:)
65:,
61:,
52:,
48:,
780:.
754:.
731:.
705:.
682:.
656:.
624:.
601:.
572:.
543:.
520:.
490:.
462:.
439:.
323:2
319:1
316:+
314:8
275:/
133:2
129:1
126:+
124:8
120:(
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.