213:, a joint railway between the governments of Rwanda and Tanzania. Construction was originally scheduled to begin in October 2018, but has been postponed as the Tanzanian link to the Rwandan border was delayed. The section is budgeted to cost US$ 857 million. A feasibility study for this section has been conducted and demarcation of the corridor is finalized. 303:
for passengers. Rwanda has finalized the demarcation of the corridor for this section. It measures approximately 170 kilometres (106 mi). In May 2023, Uganda and Rwanda agreed to fast-track the section of the Ugandan SGR connecting to Rwanda. Construction of the Ugandan section is expected to
613: 694: 193:. With no previously existing railway network, Rwanda is developing its railway system from scratch. The project is dependent on the construction of the Tanzanian and Ugandan SGR lines to the Rwandan border, which have not been completed as of October 2023. 221:
When the SGR reaches Kigali, the governments of Rwanda and the DR Congo are expected to work out the modalities for the extension of this railway system to DR Congo territory. The planned section from Kigali to the border district of
532: 230:
is about 150 kilometres (93 mi) long. In June 2019, the government of the DR Congo indicated its willingness to participate in a feasibility study for the SGR to extend to Rubavu and the Congolese city of
501: 354:
to power its locomotives. This will allow passenger locomotive speeds of 160 kilometres (99 mi) per hour and cargo locomotive speeds of 120 kilometres (75 mi) per hour. In July 2021,
639: 825: 509: 584: 766: 810: 474: 835: 389: 210: 428: 815: 355: 451: 794: 820: 394: 347: 190: 186: 384: 248: 58: 743: 379: 268: 716: 667: 555: 830: 404: 259:
has committed to extending the SGR to Bugesera International Airport, at a budgeted cost of US$ 85 million.
255:, at the international border with Burundi, is yet to be awarded to a contractor, as of September 2018. The 374: 154: 256: 560: 399: 288: 284: 533:"Distance between Kigali, Nyarugeng, Umujyi Wa Kigali, RWA and Rubavu, Iburengerazuba, RWA" 767:"Rwanda Moves Closer to Adopting Law to Pave Way for SGR, Maritime Transport Developments" 644: 589: 479: 223: 350:. In conformity with its neighbors Uganda and Tanzania, Rwanda will use electricity at 244: 140: 45: 804: 358: 327: 170: 157:(SGR) system, under development, linking the country to the neighboring countries of 272: 166: 181:. The system is expected to link, in the future, to Rwanda's two other neighbors, 326:
in) railway line is intended to ease the transfer of goods between the ports of
209:
This section, measuring 150 kilometres (93 mi), is the Rwandan half of the
112: 84: 361:
confirmed that construction would begin as soon as the Tanzanian SGR reaches
339: 292: 280: 276: 227: 49: 614:"Distance between Masaka, Kigali, Rwanda and Nemba Primary School, Rwanda" 243:
This section, measuring about 60 kilometres (37 mi), stretching from
158: 331: 182: 174: 62: 351: 335: 296: 178: 162: 53: 365:. The cost for the railway system is estimated at US$ 1.3 billion. 362: 300: 252: 66: 452:"Tanzania and Rwanda plan to construct a Standard Gauge Railway" 429:"Rwanda Bypasses Uganda For Its Own Standard Gauge Railway Line" 343: 232: 717:"Uganda, Rwanda Resolve to Expedite Kampala-Kigali SGR Project" 695:"Distance between Kagitumba, Rwanda and Masaka, Kigali, Rwanda" 668:"BIG STORY: East Africa Sets Ambitious Targets for SGR Project" 201:
The railway system would consist of several major sections:
556:"Proposed Isaka-Kigali railway could be extended to Rubavu" 165:. It is intended to ease the transfer of goods between the 744:"Tanzania-Rwanda standard-gauge line to be electrified" 502:"Backward-looking JSR report for 2021/22 fiscal year" 304:
begin in September 2024 and to be completed in 2029.
640:"Rwanda's SGR cargo, passenger terminals confirmed" 111: 103: 98: 90: 80: 75: 38: 30: 25: 20: 271:is built, it will connect to the Rwandan SGR at 795:East African leaders push for quick deal on SGR 8: 475:"Isaka-Kigali SGR works to start in October" 585:"Rwanda-Tanzania SGR To Go To Eastern DRC" 554:Ntirenganya, Emmanuel (12 December 2018). 508:. November 2022. p. 5. Archived from 279:. From there, the line would pass through 416: 450:Kang'ereha, Dorcas (15 January 2018). 299:and terminate at Masaka for cargo and 17: 454:. Nairobi: Construction Review Online 239:Kigali–Bugesera Airport–Nemba Section 7: 826:Government-owned companies of Rwanda 633: 631: 422: 420: 742:Briginshaw, David (12 March 2018). 693:Globefeed.com (19 September 2018). 612:Globefeed.com (19 September 2018). 390:Isaka–Kigali Standard Gauge Railway 211:Isaka–Kigali Standard Gauge Railway 94:Rwanda Transport Development Agency 638:Kabona, Esiara (14 January 2018). 531:Globefeed.com (15 December 2018). 473:Kabona, Esiara (29 January 2018). 356:Rwandan minister of infrastructure 14: 811:Standard gauge railways in Rwanda 583:Emmanuel Onyango (26 June 2019). 427:Mugabo, Peter (15 January 2018). 836:Railway lines under construction 765:Sabiiti, Daniel (27 July 2021). 746:. New York City: Railjournal.com 395:East African Railway Master Plan 348:Democratic Republic of the Congo 191:East African Railway Master Plan 187:Democratic Republic of the Congo 385:Tanzania Standard Gauge Railway 338:in Rwanda and subsequently to 249:Bugesera International Airport 1: 380:Uganda Standard Gauge Railway 312:This 1435 mm (4 ft 269:Uganda Standard Gauge Railway 151:Rwanda Standard Gauge Railway 21:Rwanda Standard Gauge Railway 816:International railway lines 852: 506:Ministry of Infrastructure 431:. Kigali: NewsofRwanda.com 177:, and the Rwandan capital 226:on the northern shore of 107:500 km (310 mi) 263:Kagitumba–Kigali Section 821:Railway lines in Rwanda 375:Standard-gauge railway 155:standard gauge railway 247:, in Kigali, through 217:Kigali–Rubavu Section 205:Rusumo–Kigali Section 257:government of Rwanda 831:Transport in Rwanda 797:As of 26 June 2018. 342:in Burundi, and to 561:New Times (Rwanda) 512:on 27 October 2023 400:Northern Corridor 189:, as part of the 147: 146: 843: 782: 781: 779: 777: 762: 756: 755: 753: 751: 739: 733: 732: 730: 728: 713: 707: 706: 704: 702: 690: 684: 683: 681: 679: 664: 658: 657: 655: 653: 635: 626: 625: 623: 621: 609: 603: 602: 600: 598: 580: 574: 573: 571: 569: 551: 545: 544: 542: 540: 528: 522: 521: 519: 517: 498: 492: 491: 489: 487: 470: 464: 463: 461: 459: 447: 441: 440: 438: 436: 424: 405:Central Corridor 325: 324: 320: 317: 143: 137: 135: 134: 130: 127: 119: 59:Bugesera Airport 18: 851: 850: 846: 845: 844: 842: 841: 840: 801: 800: 791: 786: 785: 775: 773: 764: 763: 759: 749: 747: 741: 740: 736: 726: 724: 715: 714: 710: 700: 698: 697:. Globefeed.com 692: 691: 687: 677: 675: 666: 665: 661: 651: 649: 645:The EastAfrican 637: 636: 629: 619: 617: 616:. Globefeed.com 611: 610: 606: 596: 594: 590:The EastAfrican 582: 581: 577: 567: 565: 553: 552: 548: 538: 536: 535:. Globefeed.com 530: 529: 525: 515: 513: 500: 499: 495: 485: 483: 480:The EastAfrican 472: 471: 467: 457: 455: 449: 448: 444: 434: 432: 426: 425: 418: 413: 371: 322: 318: 315: 313: 310: 199: 139: 132: 128: 125: 123: 122:4 ft  121: 117: 71: 12: 11: 5: 849: 847: 839: 838: 833: 828: 823: 818: 813: 803: 802: 799: 798: 790: 789:External links 787: 784: 783: 757: 734: 708: 685: 659: 627: 604: 575: 546: 523: 493: 465: 442: 415: 414: 412: 409: 408: 407: 402: 397: 392: 387: 382: 377: 370: 367: 309: 306: 265: 264: 241: 240: 219: 218: 207: 206: 198: 195: 145: 144: 141:standard gauge 115: 109: 108: 105: 101: 100: 96: 95: 92: 88: 87: 82: 78: 77: 73: 72: 70: 69: 56: 42: 40: 36: 35: 34:In development 32: 28: 27: 23: 22: 13: 10: 9: 6: 4: 3: 2: 848: 837: 834: 832: 829: 827: 824: 822: 819: 817: 814: 812: 809: 808: 806: 796: 793: 792: 788: 772: 768: 761: 758: 745: 738: 735: 723:. 24 May 2023 722: 718: 712: 709: 696: 689: 686: 674:. 25 May 2023 673: 669: 663: 660: 647: 646: 641: 634: 632: 628: 615: 608: 605: 592: 591: 586: 579: 576: 563: 562: 557: 550: 547: 534: 527: 524: 511: 507: 503: 497: 494: 482: 481: 476: 469: 466: 453: 446: 443: 430: 423: 421: 417: 410: 406: 403: 401: 398: 396: 393: 391: 388: 386: 383: 381: 378: 376: 373: 372: 368: 366: 364: 360: 359:Claver Gatete 357: 353: 349: 345: 341: 337: 333: 329: 328:Dar es Salaam 307: 305: 302: 298: 294: 290: 286: 282: 278: 274: 270: 262: 261: 260: 258: 254: 250: 246: 238: 237: 236: 234: 229: 225: 216: 215: 214: 212: 204: 203: 202: 196: 194: 192: 188: 184: 180: 176: 172: 171:Dar es Salaam 168: 164: 160: 156: 152: 142: 118:1,435 mm 116: 114: 110: 106: 102: 97: 93: 89: 86: 83: 79: 74: 68: 64: 60: 57: 55: 51: 47: 44: 43: 41: 37: 33: 29: 24: 19: 16: 774:. Retrieved 770: 760: 750:19 September 748:. Retrieved 737: 725:. Retrieved 721:ChimpReports 720: 711: 701:19 September 699:. Retrieved 688: 676:. Retrieved 672:ChimpReports 671: 662: 652:19 September 650:. Retrieved 643: 620:19 September 618:. Retrieved 607: 595:. Retrieved 588: 578: 566:. Retrieved 559: 549: 537:. Retrieved 526: 514:. Retrieved 510:the original 505: 496: 486:19 September 484:. Retrieved 478: 468: 458:19 September 456:. Retrieved 445: 435:19 September 433:. Retrieved 311: 273:Mirama Hills 266: 242: 220: 208: 200: 167:Indian Ocean 150: 148: 15: 568:15 December 539:15 December 113:Track gauge 104:Line length 91:Operator(s) 805:Categories 776:27 October 727:27 October 678:27 October 516:27 October 411:References 85:Heavy rail 648:. Nairobi 593:. Nairobi 346:, in the 340:Bujumbura 293:Rwamagana 281:Nyagatare 277:Kagitumba 267:When the 228:Lake Kivu 169:ports of 99:Technical 50:Kagitumba 771:KT PRESS 564:. Kigali 369:See also 308:Overview 197:Location 185:and the 159:Tanzania 136: in 26:Overview 597:27 June 332:Mombasa 321:⁄ 289:Gicumbi 285:Gatsibo 183:Burundi 175:Mombasa 131:⁄ 76:Service 63:Gisenyi 39:Termini 352:25kVAC 336:Kigali 297:Gasabo 245:Masaka 224:Rubavu 179:Kigali 163:Uganda 54:Kigali 46:Rusumo 31:Status 363:Isaka 334:, to 301:Ndera 253:Nemba 153:is a 67:Nemba 778:2023 752:2018 729:2023 703:2018 680:2023 654:2018 622:2018 599:2019 570:2018 541:2018 518:2023 488:2018 460:2018 437:2018 344:Goma 330:and 233:Goma 173:and 161:and 149:The 81:Type 251:to 807:: 769:. 719:. 670:. 642:. 630:^ 587:. 558:. 504:. 477:. 419:^ 295:, 291:, 287:, 283:, 235:. 138:) 65:, 61:, 52:, 48:, 780:. 754:. 731:. 705:. 682:. 656:. 624:. 601:. 572:. 543:. 520:. 490:. 462:. 439:. 323:2 319:1 316:+ 314:8 275:/ 133:2 129:1 126:+ 124:8 120:(

Index

Rusumo
Kagitumba
Kigali
Bugesera Airport
Gisenyi
Nemba
Heavy rail
Track gauge
standard gauge
standard gauge railway
Tanzania
Uganda
Indian Ocean
Dar es Salaam
Mombasa
Kigali
Burundi
Democratic Republic of the Congo
East African Railway Master Plan
Isaka–Kigali Standard Gauge Railway
Rubavu
Lake Kivu
Goma
Masaka
Bugesera International Airport
Nemba
government of Rwanda
Uganda Standard Gauge Railway
Mirama Hills
Kagitumba

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑