316:. If completed, the dam's crest would be 10,844 metres (35,577 ft) long and 22 metres (72 ft) high. Its rated head would be 15.2 metres (50 ft). It would have an installed capacity of 980 MW, and would, on average, generate 4,870 GWh per year. The dam's reservoir, which would extend well beyond the mainstream canal, would have an active storage of 70,000,000 cubic metres (57,000
783:
1171:
1069:
988:
755:
1110:
1035:
957:
769:
43:
281:, received a license to conduct a feasibility study on a dam. The feasibility study was carried out and the company asked permission to build the hydroelectric power station. However, on December 9, 2009, a memorandum of understanding was signed between the Cambodian Government and the Vietnam Industrial and Urban Area Investment Development Corp (
288:
In March 2020, due to ecological concerns, the
Cambodian government halted all hydroelectric developments on the Mekong River until 2030, pushing back the Stung Treng dam project along with its neighbour the
740:
King, P., Bird, J. and Haas, L. 2007. The current status of environmental criteria for hydropower development in the Mekong Region: a literature compilation. Vientiane, Lao PDR, WWF-Living Mekong
Program.
482:
1262:
357:
665:
861:
730:
Halls, A.S. and
Kshatriya, M. 2009. Modeling the Cumulative barrier and passage effects of mainstream hydropower dams on migratory fish populations in the Lower Mekong Basin.
1242:
1237:
381:
consulting with other
Parties about implementation of the Convention, especially in regard to transboundary wetlands, shared water systems, and shared species.
1117:
854:
393:
river basin's highest sediment trapping efficiencies of all the Lower Mekong Basin's proposed mainstream projects, destabilizing downstream channels between
265:. The project is controversial for several reasons, including its possible impact on the fisheries, as well as other ecological and environmental factors.
360:'s Inland Fisheries Research and Development Institute found that the Stung Treng dam would reduce yields of fish and other aquatic animals by 6% to 24%.
511:
1232:
1211:
847:
301:
669:
623:
648:
439:
870:
537:
457:
84:
699:
Strategic
Environmental Impact Assessment for Hydropower on the Mekong Mainstream. Final Report, prepared for the Mekong River Commission
332:, the Save the Mekong campaign and others have raised concerns about the dam's construction. In addition, Cambodia is a member of the
320:), and would inundate an area of 211 square kilometres (81 sq mi). The reservoir would be 50 kilometres (31 mi) long.
352:. A report authorized by the Mekong River Commission and released in January 2010 recommended that the Stung Treng along with the
35:
404:
If built, an estimated 21 villages with 2,059 households and 10,617 people will be displaced with the construction of the dam.
1257:
1252:
1247:
802:
596:
389:) will be essentially wholly impeded. The two proposed dams of the Sambor and the Stung Treng would have the
375:
ensuring the conservation and wise use of wetlands it has designated as
Wetlands of International Importance,
788:
734:
706:
575:
367:, which effectively obliges the Royal Cambodian Government to ‘actively support' the three 'pillars' of the
333:
1188:
515:
1122:
340:
construction on the river's mainstream – i.e. plans for the Stung Treng will be subject to scrutiny by
829:
1096:
600:
490:
329:
285:) to conduct a new feasibility study on the dam. The results of this survey have not been released.
254:
72:
824:
274:
1183:
1147:
1142:
1132:
1127:
1052:
385:
It is expected that fish migration routes (which support the world's largest inland fishery on the
1157:
1152:
979:
1178:
974:
413:
262:
234:
819:
649:"Food and nutrition security vulnerability to mainstream hydropower dam development in Cambodia"
483:"Russia is seeking permission to build a $ 2bn, 960 MW hydropower plant in Stung Treng Province"
461:
903:
368:
697:
378:
including as far as possible the wise use of all wetlands in national environmental planning,
394:
282:
1101:
1091:
1047:
923:
760:
297:
1162:
1137:
1086:
969:
938:
898:
214:
1226:
1193:
913:
908:
224:
1076:
1057:
1042:
964:
948:
943:
774:
250:
153:
566:
512:"Vietnamese investors to launch feasibility study of Stung Treng hydropower plant"
386:
839:
1081:
928:
918:
782:
654:. Inland Fisheries Research and Development Institute. December 2012. p. 6.
364:
313:
143:
814:
1000:
933:
750:
398:
353:
337:
290:
304:
to conduct feasibility studies for the dam at three potential sites in 2022.
99:
86:
768:
440:"Cambodian mega dam's resurrection on the Mekong 'the beginning of the end'"
317:
193:
1170:
1068:
987:
345:
278:
258:
62:
1109:
349:
879:
390:
538:"Cambodia Halts Hydropower Construction on Mekong River Until 2030"
1020:
890:
1034:
956:
696:
565:
341:
843:
668:. The Convention on Wetlands. January 10, 2000. Archived from
401:
and reducing over bank siltation in the
Cambodian floodplain.
137:
514:. Intellasia News Services. 2009-12-10. Archived from
312:
The Stung Treng Dam would be an earth core rock-fill
1263:
Proposed renewable energy power stations in
Cambodia
1009:
877:
233:
223:
213:
208:
200:
188:
183:
175:
167:
159:
149:
136:
131:
123:
115:
78:
68:
58:
24:
622:
261:. It would be located on the mainstream of the
438:Flynn, Gerald; Pry, Nehru (15 September 2022).
358:Ministry of Agriculture, Forestry and Fisheries
855:
356:be delayed for 10 years. A 2012 study by the
179:73,500 m/s (2,600,000 cu ft/s)
8:
862:
848:
840:
433:
431:
429:
300:conglomerate received permission from the
21:
363:The dam site lies within the Stung Treng
328:Multiple independent agencies, including
1243:Hydroelectric power stations in Cambodia
691:
689:
687:
624:"Cambodia 'most exposed' to dams threat"
733:MRC Technical Paper No. 25. Vientiane,
560:
558:
425:
336:, which requires prior notification of
249:is a proposed hydroelectric dam on the
50:Location of Stung Treng Dam in Cambodia
42:
1238:Proposed hydroelectric power stations
666:"The Annotated Ramsar List: Cambodia"
460:. Khmer Property News. Archived from
7:
568:Mainstream Project Profile Summaries
14:
536:Kijewski, Leonie (1 April 2020).
1207:
1206:
1169:
1108:
1067:
1033:
1019:
986:
955:
889:
781:
767:
753:
204:211 km (81 sq mi)
41:
34:
487:Power Engineering International
192:70,000,000 m (57,000
1233:Dams in the Mekong River Basin
871:Dams in the Mekong River Basin
171:10,844 m (35,577 ft)
1:
458:"Russian firm seeks dam deal"
273:In 2007, the Russian company
302:Ministry of Mines and Energy
16:Dam in Stung Treng, Cambodia
830:GPX (secondary coordinates)
621:Baxter, Will (2010-11-03).
444:Mongabay Environmental News
19:Dam in Stung Treng Province
1279:
239:980 MW (max. planned)
100:13.0586500°N 105.9834500°E
1202:
825:GPX (primary coordinates)
800:Map all coordinates using
29:
808:Download coordinates as:
597:"Mekong Mainstream Dams"
219:15.2 m (50 ft)
789:Renewable energy portal
735:Mekong River Commission
707:Mekong River Commission
576:Mekong River Commission
334:Mekong River Commission
235:Installed capacity
105:13.0586500; 105.9834500
176:Spillway capacity
163:22 m (72 ft)
820:GPX (all coordinates)
138:Type of dam
1258:Stung Treng province
601:International Rivers
491:PennWell Corporation
330:International Rivers
255:Stung Treng Province
142:Earth core rockfill
73:Stung Treng Province
629:The Phnom Penh Post
189:Total capacity
96: /
1189:Stung Battambang 1
414:Lower Se San 2 Dam
277:, a subsidiary of
263:Lower Mekong River
1253:Dam controversies
1220:
1219:
1010:On tributaries of
369:Ramsar Convention
296:Despite the ban,
243:
242:
201:Surface area
132:Dam and spillways
124:Opening date
1270:
1248:Dams in Cambodia
1210:
1209:
1174:
1173:
1113:
1112:
1097:Lam Phra Phloeng
1072:
1071:
1038:
1037:
1024:
1023:
1012:the Mekong River
991:
990:
960:
959:
894:
893:
864:
857:
850:
841:
791:
786:
785:
777:
772:
771:
763:
758:
757:
756:
718:
717:
715:
714:
704:
693:
682:
681:
679:
677:
662:
656:
655:
653:
645:
639:
638:
636:
635:
626:
618:
612:
611:
609:
607:
593:
587:
586:
584:
583:
578:. pp. 77–81
573:
562:
553:
552:
550:
548:
533:
527:
526:
524:
523:
508:
502:
501:
499:
498:
479:
473:
472:
470:
469:
454:
448:
447:
435:
111:
110:
108:
107:
106:
101:
97:
94:
93:
92:
89:
45:
44:
38:
22:
1278:
1277:
1273:
1272:
1271:
1269:
1268:
1267:
1223:
1222:
1221:
1216:
1198:
1184:Lower Sre Pok 2
1168:
1167:
1107:
1106:
1066:
1065:
1032:
1031:
1018:
1011:
1005:
985:
984:
954:
953:
888:
873:
868:
838:
837:
836:
835:
834:
795:
794:
787:
780:
773:
766:
761:Cambodia portal
759:
754:
752:
747:
727:
725:Further reading
722:
721:
712:
710:
705:. Vol. 1.
702:
695:
694:
685:
675:
673:
664:
663:
659:
651:
647:
646:
642:
633:
631:
620:
619:
615:
605:
603:
595:
594:
590:
581:
579:
574:. Vol. 2.
571:
564:
563:
556:
546:
544:
535:
534:
530:
521:
519:
510:
509:
505:
496:
494:
481:
480:
476:
467:
465:
456:
455:
451:
437:
436:
427:
422:
410:
326:
310:
298:The Royal Group
271:
247:Stung Treng Dam
229:10 x 98 MW
104:
102:
98:
95:
90:
87:
85:
83:
82:
54:
53:
52:
51:
48:
47:
46:
25:Stung Treng Dam
20:
17:
12:
11:
5:
1276:
1274:
1266:
1265:
1260:
1255:
1250:
1245:
1240:
1235:
1225:
1224:
1218:
1217:
1215:
1214:
1203:
1200:
1199:
1197:
1196:
1191:
1186:
1181:
1179:Lower Se San 2
1176:
1165:
1160:
1155:
1150:
1145:
1140:
1135:
1130:
1125:
1120:
1115:
1104:
1099:
1094:
1089:
1084:
1079:
1074:
1063:
1060:
1055:
1050:
1045:
1040:
1029:
1026:
1015:
1013:
1007:
1006:
1004:
1003:
998:
993:
982:
977:
972:
967:
962:
951:
946:
941:
936:
931:
926:
921:
916:
911:
906:
901:
896:
885:
883:
875:
874:
869:
867:
866:
859:
852:
844:
833:
832:
827:
822:
817:
811:
805:
798:
797:
796:
793:
792:
778:
764:
749:
748:
746:
745:External links
743:
742:
741:
738:
731:
726:
723:
720:
719:
683:
657:
640:
613:
588:
554:
528:
503:
474:
449:
424:
423:
421:
418:
417:
416:
409:
406:
383:
382:
379:
376:
325:
322:
309:
306:
275:Bureyagesstroy
270:
267:
241:
240:
237:
231:
230:
227:
221:
220:
217:
215:Hydraulic head
211:
210:
206:
205:
202:
198:
197:
190:
186:
185:
181:
180:
177:
173:
172:
169:
165:
164:
161:
157:
156:
151:
147:
146:
140:
134:
133:
129:
128:
125:
121:
120:
117:
113:
112:
80:
76:
75:
70:
66:
65:
60:
56:
55:
49:
40:
39:
33:
32:
31:
30:
27:
26:
18:
15:
13:
10:
9:
6:
4:
3:
2:
1275:
1264:
1261:
1259:
1256:
1254:
1251:
1249:
1246:
1244:
1241:
1239:
1236:
1234:
1231:
1230:
1228:
1213:
1205:
1204:
1201:
1195:
1192:
1190:
1187:
1185:
1182:
1180:
1177:
1172:
1166:
1164:
1161:
1159:
1156:
1154:
1151:
1149:
1146:
1144:
1141:
1139:
1136:
1134:
1131:
1129:
1126:
1124:
1123:Buon Tua Srah
1121:
1119:
1116:
1111:
1105:
1103:
1100:
1098:
1095:
1093:
1090:
1088:
1085:
1083:
1080:
1078:
1075:
1070:
1064:
1061:
1059:
1056:
1054:
1053:Theun Hinboun
1051:
1049:
1046:
1044:
1041:
1036:
1030:
1027:
1022:
1017:
1016:
1014:
1008:
1002:
999:
997:
994:
989:
983:
981:
978:
976:
973:
971:
968:
966:
963:
958:
952:
950:
947:
945:
942:
940:
937:
935:
932:
930:
927:
925:
922:
920:
917:
915:
912:
910:
907:
905:
902:
900:
897:
892:
887:
886:
884:
881:
876:
872:
865:
860:
858:
853:
851:
846:
845:
842:
831:
828:
826:
823:
821:
818:
816:
813:
812:
810:
809:
804:
803:OpenStreetMap
801:
790:
784:
779:
776:
770:
765:
762:
751:
744:
739:
736:
732:
729:
728:
724:
708:
701:
700:
692:
690:
688:
684:
672:on 2012-04-05
671:
667:
661:
658:
650:
644:
641:
630:
625:
617:
614:
602:
598:
592:
589:
577:
570:
569:
561:
559:
555:
543:
539:
532:
529:
518:on 2011-07-23
517:
513:
507:
504:
492:
488:
484:
478:
475:
464:on 2011-07-13
463:
459:
453:
450:
445:
441:
434:
432:
430:
426:
419:
415:
412:
411:
407:
405:
402:
400:
396:
392:
388:
380:
377:
374:
373:
372:
370:
366:
361:
359:
355:
351:
347:
343:
339:
335:
331:
323:
321:
319:
315:
307:
305:
303:
299:
294:
292:
286:
284:
280:
276:
268:
266:
264:
260:
256:
252:
248:
238:
236:
232:
228:
226:
222:
218:
216:
212:
209:Power Station
207:
203:
199:
195:
191:
187:
182:
178:
174:
170:
166:
162:
158:
155:
152:
148:
145:
141:
139:
135:
130:
126:
122:
118:
114:
109:
91:105°59′0.42″E
81:
77:
74:
71:
67:
64:
61:
57:
37:
28:
23:
995:
807:
806:
799:
775:Water portal
711:. Retrieved
709:. p. 31
698:
674:. Retrieved
670:the original
660:
643:
632:. Retrieved
628:
616:
604:. Retrieved
591:
580:. Retrieved
567:
545:. Retrieved
541:
531:
520:. Retrieved
516:the original
506:
495:. Retrieved
493:. 2009-12-09
486:
477:
466:. Retrieved
462:the original
452:
443:
403:
384:
362:
327:
311:
295:
287:
272:
251:Mekong River
246:
244:
154:Mekong River
88:13°3′31.14″N
1102:Lam Takhong
1092:Ubol Ratana
1048:Nam Theun 2
996:Stung Treng
924:Gongguoqiao
365:Ramsar Site
314:gravity dam
308:Description
144:gravity dam
103: /
79:Coordinates
1227:Categories
1138:Plei Krong
1128:Dray Hling
1087:Sirindhorn
1062:Xe Kaman 3
970:Don Sahong
939:Dachaoshan
899:Wunonglong
713:2011-02-06
676:22 January
634:2011-01-22
606:22 January
582:2011-02-06
522:2011-01-22
497:2011-01-22
468:2011-01-22
420:References
399:Phnom Penh
354:Sambor Dam
338:hydropower
291:Sambor Dam
127:after 2030
1194:Stung Sen
1148:Sre Pok 4
1143:Sre Pok 3
1133:Duc Xuyen
1118:Buon Kuop
914:Dahuaqiao
909:Huangdeng
387:Tonlé Sap
293:project.
184:Reservoir
1212:Category
1158:Se San 4
1153:Se San 3
1077:Huai Kum
1058:Houay Ho
1043:Nam Ngum
1028:Xi'er He
980:Ban Koum
965:Xayaburi
949:Jinghong
944:Nuozhadu
542:VOA News
408:See also
346:Thailand
279:RusHydro
259:Cambodia
225:Turbines
150:Impounds
119:Proposed
69:Location
63:Cambodia
1082:Pak Mun
975:Pakchom
929:Xiaowan
919:Miaowei
547:8 April
350:Vietnam
318:acre⋅ft
269:History
194:acre⋅ft
59:Country
1001:Sambor
934:Manwan
880:Mekong
395:Kratié
391:Mekong
324:Impact
168:Length
160:Height
116:Status
882:River
703:(PDF)
652:(PDF)
572:(PDF)
283:IDICO
1163:Yaly
904:Lidi
678:2011
608:2011
549:2020
397:and
348:and
342:Laos
245:The
878:On
815:KML
253:in
1229::
686:^
627:.
599:.
557:^
540:.
489:.
485:.
442:.
428:^
371::
344:,
257:,
1175::
1114::
1073::
1039::
1025::
992::
961::
895::
863:e
856:t
849:v
737:.
716:.
680:.
637:.
610:.
585:.
551:.
525:.
500:.
471:.
446:.
196:)
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.