279: 373:, the project was intended to improve the health, recreation, and economy of the area. At the time, the Santee Cooper Project was the largest land-clearing project in U.S. history, with over 12,500 workers clearing over 177,000 acres (720 km) of swamp and forestland. 42 miles (68 km) of dams and dikes were constructed, including a 26-mile (42 km), 78-foot (24 m) tall earthen dike. The 36: 712:. The utilities will need to acquire approximately 2.9 miles of new right of way. Parts of the line will run through a number of wetlands, including Simmons Creek and Murray Creek. Residents of surrounding neighborhoods have raised concerns about the line's environmental impacts. It is estimated that it would have cost approximately $ 30 million to bury the line. 144: 1000: 400:
The $ 48.2 million project (55 percent federal loan, 45 percent federal grant) first generated electricity on February 17, 1942. As transmission lines were built, power flowed to customers in Berkeley, Georgetown and Horry counties, and ultimately to electric cooperatives serving customers in 46
285:
A board of directors appointed by the governor and approved by the state Senate governs Santee Cooper. A board member represents each congressional district and each of the three counties where Santee Cooper serves retail customers directly; two board member have previous electric cooperative
313:, a Florida-based electric utility, bid to purchase Santee Cooper but withdrew in April 2021. In June 2021, the South Carolina General Assembly passed Act 90, overhauling the regulation of the utility but maintaining its state-owned status. The bill passed unanimously, making it veto-proof. 340:
The reform will oust all but one of the ten members of the Board of Directors by 2025. It reduces the elected term of a Board Member to four years and places a three-term limit, as well as restrictions on severance packages for exiting members. The board selection process remains the same.
385:
was built to control floodwaters, with 62 gates allowing overflow of excess water. In completing the largest earth-moving project in the nation's history, 42,000,000 cubic yards (32,000,000 m) of earth were moved and 3.1 million cubic yards of concrete were poured.
337:, service territory changes, facility siting and acquisition, purchase power agreements, and competitive procurement of renewable resources. Rates will continue to be set by the Santee Cooper Board of Directors but are subject to increased scrutiny. 1273: 877: 1193: 297:, leaving Santee Cooper with debts of about $ 4.4 billion for the partial construction. For his leadership and vision, Carter is projected to receive over $ 800,000 a year in retirement. Following 1313: 801: 1329: 240:
counties. With a fuel and energy supply that includes coal, nuclear, oil, natural gas, hydroelectric, and other renewable sources, Santee Cooper supplies power to the cities of
704:, South Carolina. The 5.1 mile-long transmission line will be the island's second line and has received the requisite approvals from the relevant state agencies as well as the 1349: 1344: 264:
debated whether to privatize or reform Santee Cooper, ultimately passing a reform bill that overhauled the regulation and oversight of the state-owned utility.
685: 294: 1334: 221:
project that created two lakes and cleared large tracts of land while building hydro-electric dams and power plants. Its headquarters are located in
1339: 322: 228:
As one of the largest power providers in South Carolina, Santee Cooper directly serves more than 165,000 residential and commercial customers in
1221: 752: 705: 1246: 576: 700:
Since 2017, Santee Cooper has partnered with Dominion Energy to construct the Johns Island-Queensboro 115kV Transmission project on
504: 233: 119: 684:
generation. Santee Cooper has 800 MW of renewable energy generation online or under contract. Santee Cooper owns one-third of the
1120: 976: 261: 229: 1144: 709: 289:
In September 2017, then-CEO Lonnie Carter announced his retirement following the decision to abandon construction of two new
57: 53: 100: 1151: 358: 222: 72: 701: 366: 334: 237: 569: 305:
in 2020 was whether to sell Santee Cooper or to reform the utility's management. The sale of the utility is favored by
79: 245: 1274:"Santee Cooper to run transmission lines across miles of marshland, Johns Island neighbors worried about wildlife" 1048: 1024: 924: 249: 729: 677: 497: 86: 777: 278: 1096: 241: 46: 828: 394: 68: 852:
Santee Cooper's Future Back for Debate at the State, NPR State House Week. Feb. 14, 2020. Retrieved from
349:
The Santee Cooper Power and Navigation Project, constructed in 1939, improved navigation on and provided
1301: 641: 214: 17: 467: 393:
Cooper river became fresh, and the formerly-fresh Santee river became saline, disrupting the local
350: 1168: 902: 321:
Act 90 of 2021, effective after January 1, 2022, brings Santee Cooper under the purview of the
326: 302: 178: 1072: 209:, is South Carolina's state-owned electric and water utility that came into being during the 298: 273: 257: 878:"NextEra withdraws offer for Santee Cooper. Embattled utility likely to remain state owned" 309:. He called Santee Cooper a "rogue agency" due to its independence and financial problems. 93: 853: 689: 378: 362: 330: 310: 306: 301:, the predominant issue facing the South Carolina General Assembly from 2018 until the 253: 1323: 374: 370: 802:"Santee Cooper CEO Lonnie Carter announces retirement amid nuclear reactor collapse" 651: 546: 354: 218: 829:"After nuclear fiasco, Santee Cooper chief to get $ 800,000 a year in retirement" 925:"Allowable Ex Parte Briefing by the Office of Regulatory Staff on Santee Cooper" 618: 477: 389:
The project also caused substantial hardship to local landowners. The formerly-
35: 1307: 1194:"Santee Cooper's planned new power line for Charleston sea islands hits a snag" 958: 1222:"Johns Island residents concerned over plans for new transmission power line" 592: 578: 520: 506: 390: 143: 1314:"Question of noise: Couple blame electrical substation for medical issues" 382: 381:, the highest single-lift lock in the world. A 3,400-foot (1,000 m) 210: 1247:"Residents push back on plans for Johns Island transmission power line" 681: 290: 676:
In addition to the plants listed above, Santee Cooper has 28 MW of
277: 963:
Excuse me sir, would you like to buy a kilo of isopropyl bromide?
429: 442: 189: 29: 753:"McMaster signs Santee Cooper bill, pushes for utility sale" 252:. Santee Cooper generates the power distributed by some of 1145:"V.C. Summer Nuclear Station License Renewal Application" 854:
https://www.npr.org/podcasts/406774343/state-house-week
27:
South Carolina's state-owned electric and water utility
747: 745: 743: 286:
experience; and the chairman is appointed at-large.
184: 174: 166: 158: 150: 60:. Unsourced material may be challenged and removed. 1330:Municipal electric utilities of the United States 1169:"John's Island Transmission Line | Santee Cooper" 905:. South Carolina General Assembly. June 22, 2021 205:, also known officially from the 1930s as the 8: 708:. It will traverse 2.2 miles of preexisting 132: 1316:Charleston Post & Courier, May 25, 2013 295:Virgil C. Summer Nuclear Generating Station 142: 131: 120:Learn how and when to remove this message 413: 323:South Carolina Public Service Commission 256:'s electric cooperatives. Following the 721: 692:, which owns the remaining two-thirds. 377:included the hydroelectric station and 207:South Carolina Public Service Authority 137:South Carolina Public Service Authority 18:South Carolina Public Service Authority 1220:Arruda, Paola Tristan (Oct 22, 2020). 333:in the state. This oversight includes 1350:1934 establishments in South Carolina 1268: 1266: 1215: 1213: 1163: 1161: 706:United States Army Corps of Engineers 248:, 30 large industrial customers, and 7: 1345:Energy companies established in 1934 778:"Board of Directors | Santee Cooper" 58:adding citations to reliable sources 1245:Balchunas, Caroline (2020-10-22). 965:. Pierce Chemical. pp. 42–43. 25: 1335:Companies based in South Carolina 827:Cope, Cassie (1 September 2017). 696:Johns Island Transmission Project 1073:"Energy Justice Communities Map" 34: 1340:Berkeley County, South Carolina 262:South Carolina General Assembly 45:needs additional citations for 690:Dominion Energy South Carolina 1: 1152:Nuclear Regulatory Commission 680:generation and 74 MW of wood 223:Moncks Corner, South Carolina 1192:Shafto, Jod (Jan 18, 2022). 335:integrated resource planning 686:V.C. Summer Nuclear Station 1366: 1308:"History of Santee Cooper" 1302:"History of Santee Cooper" 1049:"Electricity Data Browser" 1025:"Electricity Data Browser" 1001:"Electricity Data Browser" 271: 162:Electric and Water Utility 405:Projects and power plants 250:Charleston Air Force Base 141: 1310:Santee Cooper Kids, 2003 1097:"Electric Power Monthly" 959:Gergel, Max Gustave 293:nuclear reactors at the 730:"Santee Cooper History" 365:. With the creation of 317:Post V.C. Summer Reform 882:www.postandcourier.com 395:ecological communities 282: 1077:www.energyjustice.net 593:34.34778°N 82.77444°W 521:33.36917°N 80.11417°W 415:List of Power Plants 281: 215:rural electrification 1173:www.santeecooper.com 1125:www.santeecooper.com 981:www.santeecooper.com 782:www.santeecooper.com 734:www.santeecooper.com 154:Public Power Utility 54:improve this article 1304:Santee Cooper, 2015 598:34.34778; -82.77444 588: /  526:33.36917; -80.11417 516: /  416: 351:hydroelectric power 345:Santee Cooper Lakes 138: 1121:"Renewable Energy" 977:"Renewable Energy" 929:www.dms.psc.sc.gov 439:Annual Generation 414: 283: 856:on Dec. 24, 2020. 806:South Strand News 674: 673: 665: 659: 632: 626: 560: 554: 485: 327:regulatory agency 307:Governor McMaster 303:COVID-19 pandemic 200: 199: 179:Moncks Corner, SC 130: 129: 122: 104: 16:(Redirected from 1357: 1289: 1288: 1286: 1285: 1270: 1261: 1260: 1258: 1257: 1242: 1236: 1235: 1233: 1232: 1217: 1208: 1207: 1205: 1204: 1198:Post and Courier 1189: 1183: 1182: 1180: 1179: 1165: 1156: 1155: 1149: 1141: 1135: 1134: 1132: 1131: 1117: 1111: 1110: 1108: 1107: 1093: 1087: 1086: 1084: 1083: 1069: 1063: 1062: 1060: 1059: 1045: 1039: 1038: 1036: 1035: 1021: 1015: 1014: 1012: 1011: 997: 991: 990: 988: 987: 973: 967: 966: 955: 949: 946: 940: 939: 937: 935: 921: 915: 914: 912: 910: 899: 893: 892: 890: 888: 874: 868: 863: 857: 850: 844: 843: 841: 839: 824: 818: 817: 815: 813: 808:. 28 August 2017 798: 792: 791: 789: 788: 774: 768: 767: 765: 763: 749: 738: 737: 726: 663: 657: 630: 624: 612: 611: 609: 608: 607: 605: 600: 599: 594: 589: 586: 585: 584: 581: 558: 552: 540: 539: 537: 536: 535: 533: 528: 527: 522: 517: 514: 513: 512: 509: 483: 417: 331:public utilities 274:Nukegate scandal 258:Nukegate scandal 196: 193: 191: 146: 139: 125: 118: 114: 111: 105: 103: 62: 38: 30: 21: 1365: 1364: 1360: 1359: 1358: 1356: 1355: 1354: 1320: 1319: 1298: 1293: 1292: 1283: 1281: 1272: 1271: 1264: 1255: 1253: 1244: 1243: 1239: 1230: 1228: 1219: 1218: 1211: 1202: 1200: 1191: 1190: 1186: 1177: 1175: 1167: 1166: 1159: 1147: 1143: 1142: 1138: 1129: 1127: 1119: 1118: 1114: 1105: 1103: 1095: 1094: 1090: 1081: 1079: 1071: 1070: 1066: 1057: 1055: 1047: 1046: 1042: 1033: 1031: 1023: 1022: 1018: 1009: 1007: 999: 998: 994: 985: 983: 975: 974: 970: 957: 956: 952: 947: 943: 933: 931: 923: 922: 918: 908: 906: 901: 900: 896: 886: 884: 876: 875: 871: 864: 860: 851: 847: 837: 835: 826: 825: 821: 811: 809: 800: 799: 795: 786: 784: 776: 775: 771: 761: 759: 751: 750: 741: 728: 727: 723: 718: 698: 603: 601: 597: 595: 591: 590: 587: 582: 579: 577: 575: 574: 531: 529: 525: 523: 519: 518: 515: 510: 507: 505: 503: 502: 452: 412: 407: 379:navigation lock 347: 319: 276: 270: 188: 136: 134: 126: 115: 109: 106: 69:"Santee Cooper" 63: 61: 51: 39: 28: 23: 22: 15: 12: 11: 5: 1363: 1361: 1353: 1352: 1347: 1342: 1337: 1332: 1322: 1321: 1318: 1317: 1311: 1305: 1297: 1296:External links 1294: 1291: 1290: 1262: 1237: 1209: 1184: 1157: 1136: 1112: 1088: 1064: 1040: 1016: 992: 968: 961:(March 1977). 950: 941: 916: 894: 869: 858: 845: 819: 793: 769: 757:www.apnews.com 739: 720: 719: 717: 714: 697: 694: 672: 671: 669: 666: 660: 654: 649: 646: 644: 638: 637: 635: 633: 627: 621: 616: 613: 572: 566: 565: 563: 561: 555: 549: 544: 541: 500: 494: 493: 491: 489: 486: 480: 475: 472: 470: 464: 463: 460: 457: 450: 447: 437: 434: 424: 421: 411: 408: 406: 403: 363:South Carolina 346: 343: 329:that oversees 318: 315: 311:NextEra Energy 269: 266: 254:South Carolina 198: 197: 186: 182: 181: 176: 172: 171: 168: 164: 163: 160: 156: 155: 152: 148: 147: 128: 127: 42: 40: 33: 26: 24: 14: 13: 10: 9: 6: 4: 3: 2: 1362: 1351: 1348: 1346: 1343: 1341: 1338: 1336: 1333: 1331: 1328: 1327: 1325: 1315: 1312: 1309: 1306: 1303: 1300: 1299: 1295: 1279: 1275: 1269: 1267: 1263: 1252: 1248: 1241: 1238: 1227: 1223: 1216: 1214: 1210: 1199: 1195: 1188: 1185: 1174: 1170: 1164: 1162: 1158: 1153: 1146: 1140: 1137: 1126: 1122: 1116: 1113: 1102: 1098: 1092: 1089: 1078: 1074: 1068: 1065: 1054: 1050: 1044: 1041: 1030: 1026: 1020: 1017: 1006: 1002: 996: 993: 982: 978: 972: 969: 964: 960: 954: 951: 945: 942: 930: 926: 920: 917: 904: 898: 895: 883: 879: 873: 870: 867: 862: 859: 855: 849: 846: 834: 830: 823: 820: 807: 803: 797: 794: 783: 779: 773: 770: 758: 754: 748: 746: 744: 740: 735: 731: 725: 722: 715: 713: 711: 707: 703: 695: 693: 691: 687: 683: 679: 670: 667: 661: 655: 653: 650: 647: 645: 643: 640: 639: 636: 634: 628: 622: 620: 617: 614: 610: 573: 571: 568: 567: 564: 562: 556: 550: 548: 545: 542: 538: 501: 499: 496: 495: 492: 490: 487: 481: 479: 476: 473: 471: 469: 466: 465: 461: 458: 456: 448: 446: 444: 438: 435: 433: 431: 425: 422: 419: 418: 409: 404: 402: 398: 396: 392: 387: 384: 380: 376: 375:Pinopolis Dam 372: 371:Lake Moultrie 368: 364: 360: 356: 352: 344: 342: 338: 336: 332: 328: 324: 316: 314: 312: 308: 304: 300: 296: 292: 287: 280: 275: 267: 265: 263: 259: 255: 251: 247: 243: 239: 235: 231: 226: 224: 220: 216: 212: 208: 204: 203:Santee Cooper 195: 192:.santeecooper 187: 183: 180: 177: 173: 169: 165: 161: 157: 153: 149: 145: 140: 133:Santee Cooper 124: 121: 113: 102: 99: 95: 92: 88: 85: 81: 78: 74: 71: –  70: 66: 65:Find sources: 59: 55: 49: 48: 43:This article 41: 37: 32: 31: 19: 1282:. Retrieved 1280:. 2021-05-18 1277: 1254:. Retrieved 1250: 1240: 1229:. Retrieved 1225: 1201:. Retrieved 1197: 1187: 1176:. Retrieved 1172: 1139: 1128:. Retrieved 1124: 1115: 1104:. Retrieved 1100: 1091: 1080:. Retrieved 1076: 1067: 1056:. Retrieved 1052: 1043: 1032:. Retrieved 1028: 1019: 1008:. Retrieved 1004: 995: 984:. Retrieved 980: 971: 962: 953: 944: 932:. Retrieved 928: 919: 907:. Retrieved 897: 885:. Retrieved 881: 872: 865: 861: 848: 836:. Retrieved 832: 822: 810:. Retrieved 805: 796: 785:. Retrieved 781: 772: 760:. Retrieved 756: 733: 724: 710:right of way 702:Johns Island 699: 688:operated by 678:Landfill gas 675: 652:Refined coal 547:Refined coal 455:(Tons/year) 454: 440: 427: 410:Power plants 399: 388: 348: 339: 320: 288: 284: 227: 219:public works 206: 202: 201: 175:Headquarters 151:Company type 116: 107: 97: 90: 83: 76: 64: 52:Please help 47:verification 44: 1278:WCBD News 2 1226:Live 5 News 1101:www.eia.gov 1053:www.eia.gov 1029:www.eia.gov 1005:www.eia.gov 812:3 September 619:Natural gas 596: / 524: / 459:Retirement 367:Lake Marion 299:the failure 110:August 2020 1324:Categories 1284:2022-05-10 1256:2022-05-10 1231:2022-05-10 1203:2022-05-10 1178:2022-05-10 1130:2021-02-24 1106:2022-07-28 1082:2020-10-08 1058:2020-10-08 1034:2020-10-08 1010:2020-10-08 986:2020-10-08 787:2023-02-15 716:References 662:1,582,699 629:2,261,698 602: ( 583:82°46′28″W 580:34°20′52″N 557:8,960,208 530: ( 453:emissions 436:Fuel Type 401:counties. 361:rivers in 272:See also: 268:Management 246:Georgetown 234:Georgetown 213:as both a 80:newspapers 934:5 January 909:5 January 887:5 January 833:The State 762:5 January 511:80°6′51″W 508:33°22′9″N 426:Capacity 423:Location 353:from the 838:5 August 468:Colleton 383:spillway 230:Berkeley 211:New Deal 159:Industry 682:biomass 242:Bamberg 185:Website 167:Founded 94:scholar 1154:(NRC). 903:Act 90 664:(2018) 658:(2019) 656:1,583 648:1,260 642:Winyah 631:(2018) 625:(2019) 623:5,582 615:1,102 604:Rainey 570:Rainey 559:(2018) 553:(2019) 551:8,375 543:2,390 484:(2019) 391:saline 359:Cooper 355:Santee 325:, the 291:AP1000 260:, the 236:, and 96:  89:  82:  75:  67:  1148:(PDF) 948:"Id." 668:2028 532:Cross 498:Cross 478:Solar 420:Name 238:Horry 101:JSTOR 87:books 1251:WCIV 936:2022 911:2022 889:2022 840:2018 814:2017 764:2022 488:N/A 462:Ref 397:. 369:and 357:and 244:and 217:and 194:.com 170:1934 73:news 866:Id. 443:GWh 190:www 56:by 1326:: 1276:. 1265:^ 1249:. 1224:. 1212:^ 1196:. 1171:. 1160:^ 1150:. 1123:. 1099:. 1075:. 1051:. 1027:. 1003:. 979:. 927:. 880:. 831:. 804:. 780:. 755:. 742:^ 732:. 482:4 474:3 449:CO 445:) 432:) 430:MW 232:, 225:. 135:or 1287:. 1259:. 1234:. 1206:. 1181:. 1133:. 1109:. 1085:. 1061:. 1037:. 1013:. 989:. 938:. 913:. 891:. 842:. 816:. 790:. 766:. 736:. 606:) 534:) 451:2 441:( 428:( 123:) 117:( 112:) 108:( 98:· 91:· 84:· 77:· 50:. 20:)

Index

South Carolina Public Service Authority

verification
improve this article
adding citations to reliable sources
"Santee Cooper"
news
newspapers
books
scholar
JSTOR
Learn how and when to remove this message

Moncks Corner, SC
www.santeecooper.com
New Deal
rural electrification
public works
Moncks Corner, South Carolina
Berkeley
Georgetown
Horry
Bamberg
Georgetown
Charleston Air Force Base
South Carolina
Nukegate scandal
South Carolina General Assembly
Nukegate scandal

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.