metres per second (110 cu ft/s) in the river downstream from the dam. The dam structure is concrete face rockfill using materials from the spillway excavations, with impermeability provided by the concrete face slab. This was an innovative choice for the Nordic environment with its large temperature variations and ice loads in winter. Submersible tiltmeters were installed along two cross-sectional lines on the dam and the south dike to measure slab deflection so that Hydro-QuĂ©bec could confirm that any structural movement was within the acceptable range. Leakage is very low, at around 10–15 litres per second (0.35–0.53 cu ft/s).
28: 35: 292:
A dam and dyke were built to enlarge the existing 213 square kilometres (82 sq mi) Lake-Sainte-Anne reservoir for the use by the Toulnustouc hydroelectric project. RSW of Montreal was selected as the prime consulting engineers. VINCI Construction Grands Projets undertook construction. The
330:
The south dyke is in a valley about 500 metres (1,600 ft) southwest of the main dam, and holds back the reservoir in that area. The dyke is 45 metres (148 ft) high. A tunnel from the end of the south dyke carries water to the hydroelectric plant, which is just below PK55 on the river. The
321:
The dam is 76 metres (249 ft) high, with an effective height of 72.3 metres (237 ft) and length of 570 metres (1,870 ft). A spillway with a capacity of 2,400 cubic metres per second (85,000 cu ft/s) is used to release excess inflow and to maintain a flow of at least 3 cubic
304:
Work started in November 2001, and for the next four years the project employed 425 people on average, peaking at 1,200 workers in the summer of 2003. The average worker was aged over 50. Total cost was over CDN$ 800 million. The reservoir started to fill on 10 February 2005 and reached its maximum
293:
new dam and dyke are about 14 kilometres (8.7 mi) downstream of the former Lac-Sainte-Anne dam, and added 22 square kilometres (8.5 sq mi) to the reservoir. The development was carried out in partnership with the
350:
The discharge channel to the river is 1.2 kilometres (0.75 mi) long, and required excavation of 93,000 cubic metres (3,300,000 cu ft) of overburden and 67,000 cubic metres (2,400,000 cu ft) of rock. A
305:
operating level on 29 April 2005. The plant entered service four months ahead of schedule on 1 July 2005. The Toulnustouc hydroelectric plant was officially inaugurated on 18 August 2005 by Quebec Premier
347:
watershed. It has an installed capacity of 526 MW from two generating units. The hydraulic head is 152 metres (499 ft). The plant produces 2,660 GW/h annually.
682: 27: 89: 298: 69: 656: 280:, Quebec, Canada. It has an installed capacity of 526 MW. The power station is fed by water from a dam and dyke that contain the 355:
covered by 35,000 cubic metres (1,200,000 cu ft) of stone stabilizes the slopes and bottom of the discharge channel.
64: 281: 519: 604: 536: 585: 638: 622: 569: 553: 587:
Rapport d'analyse environnementale, Projet d'aménagement hydroélectrique de la rivière Toulnustouc
223: 344: 340: 273: 167: 259: 246: 450: 448: 269: 140: 396: 394: 392: 390: 377: 375: 373: 371: 369: 367: 310: 236: 203: 676: 502: 213: 157: 306: 277: 352: 423: 421: 412: 104: 91: 400: 478: 454: 381: 294: 229: 77: 73: 490: 427: 152: 535:
Holzhausen, Gary R; Thivierge, Stéphane-Éric (17 May 2005),
268:), is a hydroelectric power generating station managed by 555:
Hydroelectric Generating Stations as at January 1st, 2019
503:
Hydroelectric Generating Stations as at January 1st, 2019
439: 34: 331:
supply tunnel is 9.8 kilometres (6.1 mi) long.
605:"En bref - La centrale de Toulnustouc voit le jour" 466: 235: 222: 212: 202: 194: 189: 181: 173: 163: 151: 146: 136: 128: 120: 83: 60: 50: 593:(in French), Gouvernement du QuĂ©bec, 18 June 2001 413:En bref - La centrale de Toulnustouc voit le jour 401:Toulnustouc hydroelectric power project, VINCI 521:AmĂ©nagement hydroĂ©lectrique de la Toulnustouc 479:AmĂ©nagement hydroĂ©lectrique de la Toulnustouc 455:AmĂ©nagement hydroĂ©lectrique de la Toulnustouc 382:Toulnustouc Dam, Canadian Consulting Engineer 339:The Toulnustouc generating station is on the 8: 18: 574:(in French), Radio-Canada, 18 August 2005 299:Manicouagan Regional County Municipality 658:Toulnustouc hydroelectric power project 363: 683:Hydroelectric power stations in Quebec 537:"Monitoring movements at Toulnustouc" 491:Rapport d’analyse environnementale... 7: 571:La centrale de Toulnustouc inaugurĂ©e 428:La centrale de Toulnustouc inaugurĂ©e 661:, VINCI Construction Grands Projets 14: 33: 26: 467:Holzhausen & Thivierge 2005 627:, Gouvernement du QuĂ©bec, 2019 256:Toulnustouc generating station 1: 643:Canadian Consulting Engineer 611:(in French), 18 August 2005 699: 624:Toulnustouc, Barrage de la 440:Toulnustouc, Barrage de la 185:500 metres (1,600 ft) 245: 21: 524:, Hydro-QuĂ©bec, May 2006 208:152 metres (499 ft) 313:, CEO of Hydro-QuĂ©bec. 265:Centrale de Toulnustouc 224:Installed capacity 177:70 metres (230 ft) 105:49.970493°N 68.158973°W 55:Centrale de Toulnustouc 326:Dyke and supply tunnel 263: 237:Annual generation 42:Location of in Quebec 153:Type of dam 110:49.970493; -68.158973 16:Dam in Quebec, Canada 276:in the territory of 195:Commission date 65:Rivière-aux-Outardes 101: /  218:2 Francis vertical 639:"Toulnustouc Dam" 341:Toulnustouc River 274:Toulnustouc River 252: 251: 168:Toulnustouc River 147:Dam and spillways 129:Opening date 690: 668: 667: 666: 652: 651: 650: 645:, 1 October 2006 634: 633: 632: 618: 617: 616: 600: 599: 598: 592: 581: 580: 579: 565: 564: 563: 549: 548: 547: 531: 530: 529: 506: 500: 494: 488: 482: 476: 470: 464: 458: 452: 443: 437: 431: 425: 416: 410: 404: 398: 385: 379: 297:Council and the 282:Lake-Sainte-Anne 116: 115: 113: 112: 111: 106: 102: 99: 98: 97: 94: 37: 36: 30: 19: 698: 697: 693: 692: 691: 689: 688: 687: 673: 672: 671: 664: 662: 655: 648: 646: 637: 630: 628: 621: 614: 612: 603: 596: 594: 590: 584: 577: 575: 568: 561: 559: 552: 545: 543: 534: 527: 525: 518: 514: 509: 501: 497: 489: 485: 477: 473: 465: 461: 453: 446: 438: 434: 426: 419: 411: 407: 399: 388: 380: 365: 361: 337: 328: 319: 290: 109: 107: 103: 100: 95: 92: 90: 88: 87: 76: 72: 70:Manicouagan RCM 68: 46: 45: 44: 43: 40: 39: 38: 17: 12: 11: 5: 696: 694: 686: 685: 675: 674: 670: 669: 653: 635: 619: 601: 582: 566: 558:, Hydro-QuĂ©bec 550: 532: 515: 513: 510: 508: 507: 495: 483: 471: 459: 444: 432: 417: 405: 386: 362: 360: 357: 336: 333: 327: 324: 318: 315: 311:Thierry Vandal 289: 286: 250: 249: 243: 242: 239: 233: 232: 226: 220: 219: 216: 210: 209: 206: 204:Hydraulic head 200: 199: 198:18 August 2005 196: 192: 191: 187: 186: 183: 179: 178: 175: 171: 170: 165: 161: 160: 155: 149: 148: 144: 143: 138: 134: 133: 130: 126: 125: 122: 118: 117: 85: 81: 80: 62: 58: 57: 52: 48: 47: 41: 32: 31: 25: 24: 23: 22: 15: 13: 10: 9: 6: 4: 3: 2: 695: 684: 681: 680: 678: 660: 659: 654: 644: 640: 636: 626: 625: 620: 610: 606: 602: 589: 588: 583: 573: 572: 567: 557: 556: 551: 542: 538: 533: 523: 522: 517: 516: 511: 504: 499: 496: 492: 487: 484: 481:, p. 12. 480: 475: 472: 468: 463: 460: 457:, p. 11. 456: 451: 449: 445: 441: 436: 433: 429: 424: 422: 418: 414: 409: 406: 402: 397: 395: 393: 391: 387: 383: 378: 376: 374: 372: 370: 368: 364: 358: 356: 354: 348: 346: 342: 334: 332: 325: 323: 316: 314: 312: 308: 302: 300: 296: 287: 285: 283: 279: 275: 271: 267: 266: 261: 257: 248: 244: 240: 238: 234: 231: 227: 225: 221: 217: 215: 211: 207: 205: 201: 197: 193: 190:Power Station 188: 184: 180: 176: 172: 169: 166: 162: 159: 158:Rock-fill dam 156: 154: 150: 145: 142: 139: 135: 131: 127: 123: 119: 114: 86: 82: 79: 75: 71: 66: 63: 59: 56: 53: 51:Official name 49: 29: 20: 663:, retrieved 657: 647:, retrieved 642: 629:, retrieved 623: 613:, retrieved 608: 595:, retrieved 586: 576:, retrieved 570: 560:, retrieved 554: 544:, retrieved 540: 526:, retrieved 520: 498: 493:, p. 2. 486: 474: 462: 435: 408: 349: 338: 329: 320: 307:Jean Charest 303: 291: 270:Hydro-QuĂ©bec 264: 255: 253: 141:Hydro-QuĂ©bec 54: 541:Water Power 353:geomembrane 345:Manicouagan 284:reservoir. 124:Operational 108: / 84:Coordinates 665:2019-09-05 649:2019-09-05 631:2019-09-05 615:2019-09-05 597:2019-09-05 578:2019-09-05 562:2019-09-05 546:2019-09-05 528:2019-09-05 241:2,660 GW/h 96:68°09′32″W 93:49°58′14″N 609:Le Devoir 278:CĂ´te-Nord 677:Category 295:Pessamit 214:Turbines 164:Impounds 137:Owner(s) 61:Location 512:Sources 343:in the 288:Project 272:on the 260:French 182:Length 174:Height 121:Status 78:Canada 74:Quebec 591:(PDF) 359:Notes 335:Plant 247:ESEAF 309:and 254:The 228:526 132:2005 317:Dam 679:: 641:, 607:, 539:, 447:^ 420:^ 389:^ 366:^ 301:. 262:: 230:MW 505:. 469:. 442:. 430:. 415:. 403:. 384:. 258:( 67:,

Index

Toulnustouc generating station is located in Quebec
Rivière-aux-Outardes
Manicouagan RCM
Quebec
Canada
49°58′14″N 68°09′32″W / 49.970493°N 68.158973°W / 49.970493; -68.158973
Hydro-Québec
Type of dam
Rock-fill dam
Toulnustouc River
Hydraulic head
Turbines
Installed capacity
MW
Annual generation
ESEAF
French
Hydro-Québec
Toulnustouc River
CĂ´te-Nord
Lake-Sainte-Anne
Pessamit
Manicouagan Regional County Municipality
Jean Charest
Thierry Vandal
Toulnustouc River
Manicouagan
geomembrane

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑