33:
343:
398:
263:(Bridge 179), 3 km (1.9 mi) south of Te Kuiti and 2.5 km (1.6 mi) north of the station site, was opened in 1889. It is the most northerly of the major viaducts on the NIMT. At its highest, the railway is 35 m (115 ft) above the road to Mangaokewa Scenic Reserve and the Waiteti Stream, a tributary of the Mangaokewa Stream, which flows into the
814:
810:
806:
331:
of 32.4 m (106 ft), totalling 130 metres (425 feet), supported on three lattice piers held in mass concrete abutments and foundations. The wrought iron parts were made in a foundry set up by
Anderson in Te Kuiti, then riveted on site. The track and footway were on a rolled iron transom.
822:
818:
802:
798:
367:
put an end to the work, which didn't resume until 1926. The concrete piers were then completed, but rather than the rocking piers, the central spans were strengthened with iron from either end and the end spans replaced with 53 ft (16 m)
857:
740:
852:
50:
751:
768:
359:
locos. So a strengthening scheme proposed to halve each span by adding supports. A concrete pier was to be added at each end, with steel
273:
walk track runs through the
Mangaokewa valley, near the viaduct. The nearby 200 ha (490 acres) Mangaokewa Scenic Reserve is mainly
32:
847:
342:
175:
382:
Further strengthening and maintenance was done between 1950 and 1959, 1970 and 1979 in 1983, when the viaduct was painted with red
867:
566:
397:
301:
43:
862:
541:
379:
was used to rivet the 19.5 ton girders. A detailed account of the work was given in the
Railways Magazine in 1927.
827:
464:
439:
689:
419:
86:
321:
317:
327:
Waiteti
Viaduct was completed in 1888, tested for loading in March and opened in May 1889. It used four
309:
187:
842:
336:
215:
369:
119:
660:
363:
supporting the central spans. The concrete piers had reached about 60 ft (18 m) , when
278:
714:
634:
608:
516:
313:
289:
360:
355:
By 1913 trains and locomotives had increased in weight and the viaducts restricted use of
288:
The 154 acres (62 ha) for the
Waiteti section of the railway was acquired under the
373:
328:
264:
836:
583:
491:
234:
346:
Waiteti Stream and
Mangaokewa Gorge and Scenic Reserve from Waiteti Viaduct in 2018
312:, from 1887 to 1889. As the NIMT was extended south, the same firm later built the
305:
133:
123:
364:
356:
383:
274:
65:
52:
387:
376:
270:
386:
primer and in 2017–2018, which included walkway repairs, strengthening of
542:"Waikato Biodiversity Forum : Community Group Feature: Project Manu"
282:
104:
567:"RAILWAYS AND HAPU /IWI OF THE TE ROHE POTAE INQUIRY DISTRICT 1880–2008"
690:"Strengthening of Waiteti Viaduct. — (W. E. Puddy, A. M. Inst. C. E.)"
391:
769:"New life for 129-year-old old rail bridge on NZ's main trunk line"
396:
341:
858:
Heritage New
Zealand Category 1 historic places in Waikato
797:
Sir George Grey
Special Collections, Auckland Libraries –
615:. Vol. XX, no. 6266. 29 November 1888. p. 2
420:"North Island Main Trunk – Over 100 Years of Engineering"
248:
230:
222:
213:
201:
193:
181:
171:
166:
155:
147:
139:
129:
115:
110:
100:
92:
81:
42:
23:
741:"Extending the life of a historic railway bridge"
401:Waiteti Viaduct, Te Kuiti, in 1917. ATLIB 284366
584:"North Island Main Trunk (NIMT) Historic Area"
372:. They arrived in parts at Te Kuiti, where an
8:
661:"PUBLIC WORKS STATEMENT. NEW ZEALAND TIMES"
20:
411:
335:It was given Category 1 listing by the
216:Heritage New Zealand – Category 1
684:
682:
465:"Survey Number: SN3615 Run C Photo 1"
292:in 1888, apparently without payment.
229:
221:
212:
7:
486:
484:
482:
480:
478:
434:
432:
715:"RAILWAY WORKS. NEW ZEALAND HERALD"
828:New Zealand Railways Magazine 1927
14:
337:New Zealand Historic Places Trust
31:
304:, Waiteti Viaduct was built by
853:Railway bridges in New Zealand
546:www.waikatobiodiversity.org.nz
156:
1:
310:J. & A. Anderson & Co
188:J. & A. Anderson & Co
884:
143:128.6 metres (422 ft)
848:Rail transport in Waikato
719:paperspast.natlib.govt.nz
665:paperspast.natlib.govt.nz
639:paperspast.natlib.govt.nz
521:www.walkingaccess.govt.nz
253:
244:
240:
209:
30:
351:Maintenance and upgrades
66:38.360509°S 175.188137°E
868:Viaducts in New Zealand
302:Public Works Department
296:Design and construction
176:Public Works Department
151:35 metres (115 ft)
87:North Island Main Trunk
37:Waiteti Viaduct in 2015
402:
347:
71:-38.360509; 175.188137
517:"Te Kuiti to Pureora"
400:
345:
172:Engineering design by
819:1954 passenger train
694:nzetc.victoria.ac.nz
394:and water blasting.
85:Single track of the
757:on 3 February 2019.
588:www.heritage.org.nz
496:www.heritage.org.nz
62: /
863:Bridges in Waikato
775:. 11 November 2018
721:. 4 September 1914
635:"GREY RIVER ARGUS"
609:"Latest telegrams"
471:. 9 February 1973.
403:
348:
231:Reference no.
194:Construction start
613:Thames Advertiser
492:"Waiteti Viaduct"
440:"Waiteti Viaduct"
425:. Kiwirail. 2010.
390:, replacement of
377:air plant machine
257:
256:
875:
823:1954 mixed train
785:
784:
782:
780:
765:
759:
758:
756:
750:. Archived from
745:
737:
731:
730:
728:
726:
711:
705:
704:
702:
700:
686:
677:
676:
674:
672:
657:
651:
650:
648:
646:
631:
625:
624:
622:
620:
605:
599:
598:
596:
594:
580:
574:
573:
572:. November 2008.
571:
563:
557:
556:
554:
552:
538:
532:
531:
529:
527:
513:
507:
506:
504:
502:
488:
473:
472:
461:
455:
454:
452:
450:
436:
427:
426:
424:
416:
322:Manganui-o-te-ao
300:Designed by the
290:Public Works Act
226:15 February 1990
202:Construction end
184:
158:
77:
76:
74:
73:
72:
67:
63:
60:
59:
58:
55:
35:
21:
883:
882:
878:
877:
876:
874:
873:
872:
833:
832:
794:
789:
788:
778:
776:
767:
766:
762:
754:
743:
739:
738:
734:
724:
722:
713:
712:
708:
698:
696:
688:
687:
680:
670:
668:
659:
658:
654:
644:
642:
633:
632:
628:
618:
616:
607:
606:
602:
592:
590:
582:
581:
577:
569:
565:
564:
560:
550:
548:
540:
539:
535:
525:
523:
515:
514:
510:
500:
498:
490:
489:
476:
463:
462:
458:
448:
446:
438:
437:
430:
422:
418:
417:
413:
408:
353:
329:lattice girders
298:
261:Waiteti Viaduct
218:
182:
111:Characteristics
70:
68:
64:
61:
56:
53:
51:
49:
48:
38:
26:
25:Waiteti viaduct
19:
12:
11:
5:
881:
879:
871:
870:
865:
860:
855:
850:
845:
835:
834:
831:
830:
825:
793:
792:External links
790:
787:
786:
760:
732:
706:
678:
667:. 26 July 1890
652:
641:. 6 March 1889
626:
600:
575:
558:
533:
508:
474:
456:
428:
410:
409:
407:
404:
374:Ingersoll-Rand
352:
349:
297:
294:
255:
254:
251:
250:
246:
245:
242:
241:
238:
237:
232:
228:
227:
224:
220:
219:
214:
211:
210:
207:
206:
203:
199:
198:
195:
191:
190:
185:
183:Constructed by
179:
178:
173:
169:
168:
164:
163:
160:
153:
152:
149:
145:
144:
141:
137:
136:
131:
127:
126:
117:
113:
112:
108:
107:
102:
98:
97:
96:Waiteti Stream
94:
90:
89:
83:
79:
78:
46:
40:
39:
36:
28:
27:
24:
17:
13:
10:
9:
6:
4:
3:
2:
880:
869:
866:
864:
861:
859:
856:
854:
851:
849:
846:
844:
841:
840:
838:
829:
826:
824:
820:
816:
812:
808:
804:
800:
796:
795:
791:
774:
770:
764:
761:
753:
749:
742:
736:
733:
720:
716:
710:
707:
695:
691:
685:
683:
679:
666:
662:
656:
653:
640:
636:
630:
627:
614:
610:
604:
601:
589:
585:
579:
576:
568:
562:
559:
547:
543:
537:
534:
522:
518:
512:
509:
497:
493:
487:
485:
483:
481:
479:
475:
470:
466:
460:
457:
445:
441:
435:
433:
429:
421:
415:
412:
405:
399:
395:
393:
389:
385:
380:
378:
375:
371:
370:plate girders
366:
362:
361:rocking piers
358:
350:
344:
340:
338:
333:
330:
325:
323:
319:
318:Mangaturuturu
315:
311:
307:
303:
295:
293:
291:
286:
284:
280:
276:
272:
268:
266:
262:
252:
247:
243:
239:
236:
233:
225:
217:
208:
204:
200:
196:
192:
189:
186:
180:
177:
174:
170:
165:
161:
154:
150:
146:
142:
138:
135:
132:
128:
125:
121:
118:
114:
109:
106:
103:
99:
95:
91:
88:
84:
80:
75:
47:
45:
41:
34:
29:
22:
16:
777:. Retrieved
772:
763:
752:the original
747:
735:
723:. Retrieved
718:
709:
697:. Retrieved
693:
669:. Retrieved
664:
655:
643:. Retrieved
638:
629:
617:. Retrieved
612:
603:
591:. Retrieved
587:
578:
561:
549:. Retrieved
545:
536:
524:. Retrieved
520:
511:
499:. Retrieved
495:
468:
459:
447:. Retrieved
443:
414:
381:
354:
334:
326:
306:Christchurch
299:
287:
281:forest with
269:
260:
258:
205:10 July 1889
140:Total length
134:Wrought iron
120:Plate girder
15:
444:NZ Topo Map
124:Pratt truss
69: /
57:175°11′17″E
44:Coordinates
837:Categories
815:1902 track
779:31 January
725:5 February
699:31 January
671:1 February
645:1 February
619:1 February
593:1 February
551:1 February
526:31 January
501:31 January
449:31 January
406:References
324:viaducts.
223:Designated
54:38°21′38″S
469:Retrolens
388:kingposts
339:in 1990.
271:Te Araroa
843:Te Kūiti
314:Makatote
285:groves.
275:podocarp
249:Location
159:of spans
130:Material
105:KiwiRail
392:corbels
357:Class X
167:History
93:Crosses
82:Carries
803:c.1890
320:, and
308:firm,
148:Height
116:Design
18:Bridge
773:Stuff
755:(PDF)
744:(PDF)
570:(PDF)
423:(PDF)
283:nīkau
265:Waipā
101:Owner
811:1902
807:1898
799:1889
781:2019
748:OPUS
727:2019
701:2019
673:2019
647:2019
621:2019
595:2019
553:2019
528:2019
503:2019
451:2019
384:lead
279:tawa
259:The
235:4175
197:1888
122:and
365:war
157:No.
839::
821:,
817:,
813:,
809:,
805:,
801:,
771:.
746:.
717:.
692:.
681:^
663:.
637:.
611:.
586:.
544:.
519:.
494:.
477:^
467:.
442:.
431:^
316:,
267:.
783:.
729:.
703:.
675:.
649:.
623:.
597:.
555:.
530:.
505:.
453:.
277:/
162:4
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.