22:
257:
The company name can be traced back to the 16th century (the name
Maccaferri is a literal translation of ‘he who strikes iron’), when Giovanni (Johannes) "Maccaferri" was registered with the blacksmiths guild. However, to join the guild a person had to be 20 years old. As Johannes was only 14 at the
272:
As a blacksmith, the company of
Raffaele Maccaferri manufactured items such as gates, fences, columns, staircases and railings used in the churches, houses and businesses in the Bologna area. Of the two sons of Raffaele, the eldest, Angelo, guided the commercial growth of the business, whilst Luigi
329:
In 1944, during the Second World War the factory in Zola
Predosa was destroyed by aerial bombardment. The company was restarted in 1946 under the guidance of Gaetano and Guglielmo Maccaferri, sharing the company leadership. In 1951, Maccaferri opened another factory in Bellizzi (Salerno), building
294:
At the turn of the century, Maccaferri obtained exclusive rights to the patent for a new, box shaped gabion, designed by the
Cremona engineer, Edigio Palvis. Due to its regular shape and dimensions, the box gabion proved more successful than sack gabions as used at the closure of the breach at
378:
At the end of 2020, the shares representing the entire share capital of
Officine Maccaferri S.p.A., following the competitive auction launched by the Court of Bologna pursuant to ex art. 163bis of the Italian Bankruptcy Law, were awarded to Stellex Capital Holdings Luxembourg S.a r.l.
345:
technology was useful when the Reno
Mattress was invented soon afterwards; a larger flatter gabion with a smaller mesh size, used for river erosion protection works. Maccaferri's products were used to reconstruct roads and river banks following the devastating
128:
730:
321:
Between the wars, the
General Manager, Alessandro Maccaferri recognised the need to reconfigure and expand the company further, with increasing ventures overseas. In 1926, Maccaferri's gabions were used for
298:
In the early 1900s, Maccaferri began industrialising the technology, and the first branch factories were built in
Grenoble and Naples. Key structures built at this time included protection to the River
371:
Since the 2000s, the company has grown through acquisition and geographical expansion. Growth also included diversification and addition of products to the
Maccaferri portfolio, including construction
725:
715:
269:, recorded the registration of the workshop ("Officina") of a certain Raffaele Maccaferri, head of the Maccaferri family at the time. This was based in Gesso, near Lavino.
654:
720:
513:
735:
318:, the metal craftsmanship was paused, whilst wire production was used for the manufacture of barbed wire, bastions and other mesh products for military purposes.
284:
The company's first major project was in 1893 when
Maccaferri's gabions were used to repair a breach in the weir at Casalecchio di Reno. The
411:) under the laws of the then Kingdom of Italy (now Republic of Italy) on May 25, 1920 and is registered with the Register of Companies of
273:
was the industrial specialist. He expanded the capacity and introduced technology for wire-drawing into the factory. Soon afterwards the "
394:
2006: BMD Texteis Ltda (Brazil based manufacturer of geosynthetic products used in construction, automotive and agriculture industries)
291:
The same Chamber of Commerce in Zola Predosa also records that the company changed its name to "Raffaele Maccaferri and Sons" in 1895.
314:
The company's first sales catalogue was produced in 1906 and in 1907 the company became "Officine Maccaferri & Pisa". During the
620:
105:
368:
Until the early 1990s, the company only supplied products manufactured from the company’s double twist steel wire hexagonal mesh.
333:
The steel wire double twisted steel wire mesh was used in the manufacture of many different products for numerous applications.
43:
658:
295:
Caselecchio di Reno at creating retaining structures and river training works which were becoming increasingly important.
590:
Manuela Escaramaeia, "River and Channel Revetments: A Design Manual" published by Thomas Telford Publications London 1998
86:
610:
58:
238:, soil reinforcement, embankment stabilisation, river and canal hydraulic works, coastal protection, erosion control,
39:
500:
65:
32:
436:
375:(polymeric materials used within the geotechnical industry), rockfall protection and products for tunneling.
72:
347:
138:
636:
341:
was added to the wire to offer a longer design life, especially in more demanding applications. This new
234:. The company specialises in products for the construction industry. Maccaferri's products are used for:
54:
565:
281:
had been in existence for millennia prior to this, but had been constructed from natural materials).
483:
691:
404:
337:
the steel wire with zinc was a standard approach within the wire industry. In the 1950s and 1960s
539:
338:
616:
463:
148:
258:
time, the Bologna Senate granted a dispensation and approved his membership on 28 June 1550.
246:
protection. The company provides technical support to designers, contractors and end-users.
415:. Its current registered office is in via J.F. Kennedy, 10 - 40069, Zola Predosa, Italy.
679:
428:
391:
2006: Linear Composites Ltd (UK based manufacturer of composite polymer ropes and straps)
79:
323:
235:
709:
372:
358:
334:
262:
167:
230:(Maccaferri) is an Italian multinational company, headquartered in Zola Predosa,
315:
21:
249:
Maccaferri has 70 subsidiaries, 30 production facilities and 3,300 employees.
127:
243:
484:"Sustainability and innovation drive engineering company's global vision"
239:
448:
Russia - Slope protection of railway line for Amur gas processing plant
412:
342:
231:
599:
Giornale del genio civile Vol60, Istituto Poligrafico dello stato 1922
458:
362:
354:
326:
protection at the Genale Dam, commissioned by the Somali Government.
285:
278:
274:
300:
266:
173:
731:
Construction and civil engineering companies established in 1879
308:
304:
261:
Over 300 years later, on 3 May 1879, the Chamber of Commerce in
198:
692:"Geomats Reinforce 26m Slopes for Gas Processing Plant Railway"
219:
15:
637:"Reinforcing Megastructure Foundations with Geosynthetics"
612:
La direzione del personale oggi. Incontri e testimonianze
726:
Construction and civil engineering companies of Italy
433:
Botswana - Jwaneng-Debswana Mine, Rockfall protection
288:
were simple sack gabions, filled in-situ with rocks.
716:
Companies based in the Metropolitan City of Bologna
215:
205:
194:
180:
162:
154:
144:
134:
46:. Unsourced material may be challenged and removed.
353:In the ‘70’s, the company opened new factories in
540:"Consorzi dei canali di Reno e Savena in Bologna"
501:Cento anni di Officine Maccaferri SPA 1879-1979
445:Italy - Bologna-Milan High speed railway line
330:upon the sales successes of the prior years.
8:
120:
311:in 1908 for the National Railway Company.
119:
106:Learn how and when to remove this message
475:
721:Companies listed on the Borsa Italiana
736:Italian companies established in 1879
7:
427:India, Sikkim - Construction of new
44:adding citations to reliable sources
277:" was re-invented using wire mesh (
609:Acquaviva, Pier Francesco (2012).
514:"Sette : Eccellenze Italiane"
442:Greece - Egnatia Metsovo Motorway
403:The company was incorporated as a
14:
439:: 103 km Rreshen to Kalimash
387:Key acquisitions have included:
307:in 1906 and alongside the River
126:
20:
615:(in Italian). Giuffrè Editore.
31:needs additional citations for
423:Significant projects include:
361:(Williamsport, Maryland) and,
1:
242:mitigation, debris flows and
752:
544:www.consorzireno-savena.it
348:floods in Florence in 1966
189:(Chief Executive Officer)
125:
437:Albania - Kosovo Highway
655:"Jwaneng-Debswana Mine"
564:Salaborsa, Biblioteca.
228:Officine Maccaferri SpA
365:(Jundiai, São Paulo).
357:(Agincourt, Ontario),
186:Lapo Vivarelli Colonna
570:Biblioteca salaborsa
236:retaining structures
40:improve this article
405:joint stock company
399:Corporate structure
211:~3.300 (As of 2018)
207:Number of employees
122:
409:società per azioni
220:www.maccaferri.com
201:535 million (2018)
696:geosynthetica.com
641:geosynthetica.com
464:Maccaferri gabion
225:
224:
149:Civil Engineering
116:
115:
108:
90:
743:
700:
699:
688:
682:
677:
671:
670:
668:
666:
661:on 6 August 2017
657:. Archived from
651:
645:
644:
633:
627:
626:
606:
600:
597:
591:
588:
582:
581:
579:
577:
561:
555:
554:
552:
550:
536:
530:
529:
527:
525:
510:
504:
498:
492:
491:
480:
383:Key acquisitions
190:
130:
123:
111:
104:
100:
97:
91:
89:
48:
24:
16:
751:
750:
746:
745:
744:
742:
741:
740:
706:
705:
704:
703:
690:
689:
685:
680:Egnatia Metsovo
678:
674:
664:
662:
653:
652:
648:
635:
634:
630:
623:
608:
607:
603:
598:
594:
589:
585:
575:
573:
563:
562:
558:
548:
546:
538:
537:
533:
523:
521:
518:www.corriere.it
512:
511:
507:
499:
495:
482:
481:
477:
472:
455:
429:Pakyong Airport
421:
401:
385:
316:First World War
255:
208:
188:
187:
183:
176:
170:
112:
101:
95:
92:
49:
47:
37:
25:
12:
11:
5:
749:
747:
739:
738:
733:
728:
723:
718:
708:
707:
702:
701:
683:
672:
646:
628:
621:
601:
592:
583:
556:
531:
505:
493:
474:
473:
471:
468:
467:
466:
461:
454:
451:
450:
449:
446:
443:
440:
434:
431:
420:
419:Major projects
417:
400:
397:
396:
395:
392:
384:
381:
254:
251:
223:
222:
217:
213:
212:
209:
206:
203:
202:
196:
192:
191:
184:
181:
178:
177:
172:
166:
164:
160:
159:
156:
152:
151:
146:
142:
141:
136:
132:
131:
114:
113:
28:
26:
19:
13:
10:
9:
6:
4:
3:
2:
748:
737:
734:
732:
729:
727:
724:
722:
719:
717:
714:
713:
711:
697:
693:
687:
684:
681:
676:
673:
660:
656:
650:
647:
642:
638:
632:
629:
624:
622:9788814173219
618:
614:
613:
605:
602:
596:
593:
587:
584:
571:
567:
560:
557:
545:
541:
535:
532:
519:
515:
509:
506:
502:
497:
494:
489:
485:
479:
476:
469:
465:
462:
460:
457:
456:
452:
447:
444:
441:
438:
435:
432:
430:
426:
425:
424:
418:
416:
414:
410:
406:
398:
393:
390:
389:
388:
382:
380:
376:
374:
373:geosynthetics
369:
366:
364:
360:
356:
351:
349:
344:
340:
336:
331:
327:
325:
319:
317:
312:
310:
306:
302:
296:
292:
289:
287:
282:
280:
276:
270:
268:
264:
259:
252:
250:
247:
245:
241:
237:
233:
229:
221:
218:
214:
210:
204:
200:
197:
193:
185:
179:
175:
169:
165:
161:
157:
153:
150:
147:
143:
140:
137:
133:
129:
124:
118:
110:
107:
99:
88:
85:
81:
78:
74:
71:
67:
64:
60:
57: –
56:
52:
51:Find sources:
45:
41:
35:
34:
29:This article
27:
23:
18:
17:
695:
686:
675:
663:. Retrieved
659:the original
649:
640:
631:
611:
604:
595:
586:
574:. Retrieved
572:(in Italian)
569:
559:
547:. Retrieved
543:
534:
522:. Retrieved
520:(in Italian)
517:
508:
496:
487:
478:
422:
408:
402:
386:
377:
370:
367:
352:
332:
328:
320:
313:
297:
293:
290:
283:
271:
263:Zola Predosa
260:
256:
248:
227:
226:
168:Zola Predosa
163:Headquarters
135:Company type
117:
102:
93:
83:
76:
69:
62:
55:"Maccaferri"
50:
38:Please help
33:verification
30:
576:21 November
549:21 November
524:21 November
488:China Daily
339:PVC coating
335:Galvanising
710:Categories
566:"homepage"
470:References
324:embankment
182:Key people
121:Maccaferri
96:April 2021
66:newspapers
503:, 1979 OM
244:avalanche
453:See also
240:rockfall
145:Industry
665:2 March
413:Bologna
343:coating
286:gabions
279:gabions
253:History
232:Bologna
216:Website
195:Revenue
155:Founded
139:Private
80:scholar
619:
459:Gabion
363:Brazil
355:Canada
275:gabion
82:
75:
68:
61:
53:
301:Tiber
267:Italy
174:Italy
87:JSTOR
73:books
667:2016
617:ISBN
578:2018
551:2018
526:2018
309:Arno
305:Rome
158:1879
59:news
359:USA
303:in
42:by
712::
694:.
639:.
568:.
542:.
516:.
486:.
350:.
265:,
171:,
698:.
669:.
643:.
625:.
580:.
553:.
528:.
490:.
407:(
199:€
109:)
103:(
98:)
94:(
84:·
77:·
70:·
63:·
36:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.