22: 167:
Expanding foam is used primarily with vertical shafts where the use of the shaft is no longer desired. It forms a plug 6 feet or more thick. A 4-to-6-inch (100 to 150 mm) pipe through the plug allows for pressure equalization as well as for water drainage, or even as a bat entrance if necessary.
148:
Closure planning, a relative newcomer to mine planning, continues throughout the life of a mine, starting with conceptual closure plans prior to production, periodic updates throughout the life of the mine, and a final decommissioning plan. This is captured more coherently in the Australian Model to
171:
Closure planning has two distinct components. On-site planning is mostly about environmental rehabilitation and returning the landform to a reasonable condition where vegetative recovery is enhanced. Off-mine closure is about loss of livelihood, which is a more complex issue. An element of this is
155:
Most mine shafts are capped, meaning a large concrete plug around 3 feet thick is placed over the shaft to cover it and stop fatal accidents from occurring. Some mines are capped using large metallic grills, this usual occurs on deep level shafts so airflow through the deep tunnels helps prevent
133:
are being completed. It is generally associated with reduced employment levels, which can have a significant negative impact on local economies. It is also the period when the majority of mine reclamation is completed, making the land safe and useful again.
159:
Older mines typically used wood beams, a foot or more thick, under loose rock and dirt as caps. Over time the wood rots and sinkholes can develop. These mines are typically recapped with concrete, steel plates, expanding foam, or a combination of each.
314:
Adler, R., Claassen, M., Godfrey, L. & Turton, A.R. 2007. Water, Mining and Waste: A Historical and Economic Perspective on Conflict Management in South Africa. In The Economics of Peace and Security Journal, Vol. 2, No. 2 (2007), Pp 32 –
163:
Steel plates are used primarily on horizontal shafts, but are used on vertical shafts occasionally. Doors are added if access is needed. Holes are cut into the plate to allow for drainage as well as for a bat entrance.
287: 204: 235: 260: 105: 43: 137:
In South Africa, which is a major mining country, closure planning has not yet been formalized. This has led to a range of
86: 39: 58: 250: 152:
At most mines, progressive reclamation over the life of the mine is used to reduce the reclamation burden at closure.
211: 65: 32: 330: 173: 72: 138: 54: 185: 275: 176:, which in certain cases can exceed the value of the mineral that was mined in the first place. 256: 229: 130: 301: 79: 142: 252:
Water Policy Entrepreneurs: A Research Companion to Water Transitions Around the Globe
324: 21: 126: 122: 15: 276:
http://www.dmp.wa.gov.au/documents/Shed_env_guide_closure.pdf
302:"BHP mine closure devastates West Australian towns" 46:. Unsourced material may be challenged and removed. 172:generating an offset against the high clost of 8: 129:have ceased, and final decommissioning and 106:Learn how and when to remove this message 288:"Mine closure australia - Google Search" 196: 234:: CS1 maint: archived copy as title ( 227: 7: 44:adding citations to reliable sources 141:that have the potential to become 14: 20: 121:is the period of time when the 31:needs additional citations for 1: 125:-extracting activities of a 145:if not adequately managed. 347: 249:Meijerink, Sander (2009). 174:environmental remediation 139:unintended consequences 186:Care and maintenance 40:improve this article 116: 115: 108: 90: 338: 331:Mine reclamation 316: 312: 306: 305: 298: 292: 291: 284: 278: 273: 267: 266: 246: 240: 239: 233: 225: 223: 222: 216: 210:. Archived from 209: 201: 131:mine reclamation 111: 104: 100: 97: 91: 89: 48: 24: 16: 346: 345: 341: 340: 339: 337: 336: 335: 321: 320: 319: 313: 309: 300: 299: 295: 286: 285: 281: 274: 270: 263: 248: 247: 243: 226: 220: 218: 214: 207: 205:"Archived copy" 203: 202: 198: 194: 182: 112: 101: 95: 92: 49: 47: 37: 25: 12: 11: 5: 344: 342: 334: 333: 323: 322: 318: 317: 307: 293: 279: 268: 261: 241: 195: 193: 190: 189: 188: 181: 178: 149:mine closure. 143:sovereign risk 114: 113: 55:"Mine closure" 28: 26: 19: 13: 10: 9: 6: 4: 3: 2: 343: 332: 329: 328: 326: 311: 308: 303: 297: 294: 289: 283: 280: 277: 272: 269: 264: 262:9781849803366 258: 254: 253: 245: 242: 237: 231: 217:on 2012-04-25 213: 206: 200: 197: 191: 187: 184: 183: 179: 177: 175: 169: 165: 161: 157: 153: 150: 146: 144: 140: 135: 132: 128: 124: 120: 110: 107: 99: 96:December 2009 88: 85: 81: 78: 74: 71: 67: 64: 60: 57: –  56: 52: 51:Find sources: 45: 41: 35: 34: 29:This article 27: 23: 18: 17: 310: 296: 282: 271: 251: 244: 219:. Retrieved 212:the original 199: 170: 166: 162: 158: 156:subsidence. 154: 151: 147: 136: 119:Mine closure 118: 117: 102: 93: 83: 76: 69: 62: 50: 38:Please help 33:verification 30: 221:2011-10-13 192:References 66:newspapers 325:Category 230:cite web 180:See also 80:scholar 259:  82:  75:  68:  61:  53:  215:(PDF) 208:(PDF) 87:JSTOR 73:books 257:ISBN 236:link 127:mine 59:news 315:41. 123:ore 42:by 327:: 255:. 232:}} 228:{{ 304:. 290:. 265:. 238:) 224:. 109:) 103:( 98:) 94:( 84:· 77:· 70:· 63:· 36:.

Index


verification
improve this article
adding citations to reliable sources
"Mine closure"
news
newspapers
books
scholar
JSTOR
Learn how and when to remove this message
ore
mine
mine reclamation
unintended consequences
sovereign risk
environmental remediation
Care and maintenance
"Archived copy"
the original
cite web
link
Water Policy Entrepreneurs: A Research Companion to Water Transitions Around the Globe
ISBN
9781849803366
http://www.dmp.wa.gov.au/documents/Shed_env_guide_closure.pdf
"Mine closure australia - Google Search"
"BHP mine closure devastates West Australian towns"
Category
Mine reclamation

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.