1932: 1802: 29: 386:(EDL) on the other. Financial closing was reached in June 2005. The Nam Theun River diversion was begun in March 2006 and then closed in April 2008 following completion of the Nakai Dam wall. Impoundment of the Nakai Reservoir occurred over the 2008 wet season and the reservoir was close to full supply level by the end of 2008. Test hydro power generation began in mid-2009 and the commercial operation date was achieved in April 2010. 42: 2119: 1088: 2082: 1980: 1899: 2021: 1946: 1868: 1074: 1060: 49: 1043:
occurred in the upstream basin, the lifetime would be accordingly reduced and could affect the financial and economic viability of the project. This would especially be the case if sediments remained in the active storage area in the upper part of the reservoir instead of being washed into the dead
520:
The government has multiple roles related to NT2, some of which may be conflicting: It partially owns NTPC and thus has an interest in the financial profitability of the project; it is supposed to monitor compliance with environmental and social safeguards under the concession contract; and it buys
938:
According to a joint progress report issued by the World Bank and the ADB in December 2007, implementation of the downstream program – particularly on implementing livelihood programs – was a challenge. Lessons from the 20 villages where the programs have been piloted in a participatory manner are
846:
payments and replacement land for villagers affected by construction activities have been "inadequate, unfair or non-existent". Poor resettlement planning has led to housing and infrastructure delays. Plans to restore the livelihoods of villagers on the Nakai Plateau and along the Xe Bang Fai have
765:
The World Bank works with the Lao government to improve public financial management practices and increase transparency in order to increase the likelihood that revenues will be used to benefit the poor, including through investment in health and education. The government has agreed with the World
1018:
Construction of the villages and major facilities (new roads, water pumps, toilets, schools, mills, and electricity) was completed by mid-2008. Consultations on house design, location, and construction materials were held and continue to ensure the outcomes reflect the needs of the local people.
709:
According to the government "the Project is an essential part of the country's development framework and the Project's implementation is likely to be the first real possibility for (Laos) to reduce gradually its dependence on Official Development Assistance." In the same vein, the then Managing
1014:
Seventeen villages and their 6,300 inhabitants moved from the area that became the NT2 reservoir on the Nakai Plateau to custom-built villages built in consultation with the resettled communities. NTPC and the Lao Government have committed to doubling the income of resettled villagers, through
742:
Government revenue is estimated at US$ 1.9bn to US$ 2bn in nominal terms over 25 years. It has been estimated that at a 10% discount rate the net present value of the revenues will be six times higher than the net present value from the debt service, if all government equity was funded through
357:
By 2015, it was possible to see the effect of the dam and criticism mounted. A group of non-governmental organisations said: "Ten years after the start of the construction of the Nam Theun 2 Dam in Central Laos, it is clear that this mega project has disastrous impacts on people and their
693:
in both Laos and Thailand. According to MIGA, its guarantee "was key to lowering the project's risk profile, which in turn enabled the government and developers to attract commercial financing at better rates and gave the investor the assurance needed to go ahead with the deal".
506:(40%), Electricity Generating PCL (EGCO) of Thailand (35%), and the Government of Laos (25%). Governments and government-owned enterprises own a majority of NTPC. This arrangement is atypical of an IPP. Normally the power generating company is privately owned. 524:
Some of the owners of NTPC are also contractors engaged in the construction of the dam. For example, EDF International is the lead contractor for the project under a turnkey contract. It has engaged various sub-contractors for specific parts of the project.
743:
concessionary lending. Revenues are expected to increase progressively from approximately US$ 10M in 2009 to US$ 110 to 150M per year at the end of the concession period in 2033. Thereafter the government will receive all revenues accruing to the project.
770:
funds, and then from the government's taxes, royalties, and dividends once the project commences operation. Special administrative units are being established to deal with the effective management and allocation of the funds earned by the project.
335:
According to the government of Laos, "the project is an essential part of the country's development framework and the project's implementation is likely to be the first real possibility for (Laos) to reduce gradually its dependence on
1617: 889:
NTPC promised to stop power production when floods occur on the Xe Bang Fai. However, it is as yet unknown exactly how long this flooding period will last for each year. The length of the period affects the project's profitability.
983:), together nine times larger (4,106 km) than the flooded area, are expected to be better managed through significant resources made available under the project – more than 60 times what the government has spent on its entire 831:
The comprehensive environmental and social measures designed to mitigate potential environmental and social impacts could become a "global model", according to a group of social and environmental experts who advise on the project.
1031:. The report stresses that the pace of the development of the livelihood activities must be accelerated including engaging additional technical assistance to help villagers develop the most effective cropping systems possible. 861:
per MW and five persons resettled per MW) is neither very high nor very low, compared to 48 other large dams analyzed. Using this specific analytical framework, Nam Theun 2 could neither be considered a "good" or a "bad" dam.
762:. Power demand from Thailand is expected to be strong. In December 2007, Thailand and Laos signed an agreement increasing the total power to be supplied by Laos to Thailand from all sources in 2015 from 5,000 MW to 7,000 MW. 947:
There is relatively little information on downstream impacts on the Nam Theun River, where water flows will be significantly reduced. No permanent villages lie along the Nam Theun some 50 km downstream below the dam.
877:
speaks of up to 150,000 people. The impacts have been widely studied and have been discussed with local communities. Negative impacts on the downstream population include the washing away of river bank gardens, changes in
347:
and social impacts, and comprehensive measures have been designed to mitigate these. According to a group of social and environmental experts who advise on the project, these measures could become a global model. Although
495:(BOT) project. It has a concession period of 31 years, of which the operating period is 25 years. At the end of the concession period, the project facilities will be transferred to the government free of charge. 1044:
storage area closer to the dam in the lower part of the reservoir. The establishment of the relatively well-funded Watershed Management Protection Authority is expected to protect forest cover and thus limit
1541: 1232: 1015:
livelihood programs, five years after they have been relocated. This means that people who used to make US$ 410 per household a year in 2005 should make at least US$ 820 per household a year by 2012.
1269: 1420: 857:
According to data in the World Bank publication "Good dams, bad dams", the ratio of area flooded and people resettled per megawatt of installed electricity generating capacity (flooded area of 41
920:. The objective is to help villagers generate money from a variety of different sources to compensate for any changes in fishing catches after the river diversion. Affected communities receive 1106: 324:
in Laos, the world's largest private sector cross-border power project financing, the largest private sector hydroelectric project financing, and one of the largest internationally financed
1621: 2153: 870:
The flow of water in the Xe Bang Fai (XBF), which received the water diverted through NT2, increased significantly, thus affecting the population living downstream of the release point.
1772: 991:
in the protected areas, which the government claims has now been largely brought under control despite growing evidence that villagers are using logging to supplement falling incomes.
1386: 854:, claims that the scientific consensus is that the dam's costs outweigh its benefits and that the dam represents a "complete failure of water governance in Mekong region." 366:
The Nam Theun 2 project was identified in the 1980s and a concession was awarded in 1993. It was subjected to a long anti-dam campaign. The project was frozen after the
409:
Nam Theun 2 is a trans-basin diversion power plant that uses water from the Nam Theun River and releases the water into the Xe Bang Fai River. The project site is in
969: 2143: 815: 2028: 1765: 399: 379: 247: 1273: 824:
Independent Monitoring Agencies, reporting to the government. The Independent Monitoring Agencies were in the process of being assembled in December 2006.
1027:, as documented by various assessments. Experts are helping the resettled villagers to adopt improved practices to increase agricultural and income 980: 670: 1002:
in the area has been drawn up. A Watershed Management Protection Authority (WMPA) has been established with the specific purpose of protecting the
2122: 1758: 635: 1667: 1604: 521:
some of the electricity generated from the project through the state-owned power company EDL and thus has an interest in low electricity prices.
1731: 1432: 1654: 939:
being applied as other villages were included. Micro-credit schemes that are being developed were not yet on a sustainable financial footing.
1555: 1404: 1019:
According to a World Bank report, the health of villagers who have already been resettled has significantly improved due to better water and
897:
in the reservoir. Because the impacts are unknown, monitoring systems are included and a commitment has been made to "adaptive management".
767: 698: 697:
The government's initial equity contribution of US$ 83 million (25%) was largely funded by donors, including a US$ 20 million grant from the
666: 1744: 1781: 1383: 805:. More details can be found in the Environmental and Social Impact assessment, and in the summary provided for the various impacts below. 790: 510: 1140: 1517: 88: 1719: 1468: 960:
content. Monitoring of the villages along the river conducted by NTPC has not yet detected any significant impacts to the fishery.
935:
systems, and access to electricity. The provision of this infrastructure is not the responsibility of NTPC, but of the government.
1572: 1170: 1205: 956:, however, do use this stretch of the river. Fish diversity and abundance is expected to be affected by reduced water flows and 1359: 900:
Livelihood development programs were put in place for the villagers living downstream on the Xe Bang Fai, in districts such as
337: 843: 616: 1006:
of the reservoir and the protected areas in it. WPMA will receive US$ 1M annually from NTPC through the concession period.
1101: 566: 811:
NT2 has a multi-layer environmental and social monitoring and evaluation mechanism consisting of the following elements:
41: 2148: 1244: 639: 1411:, NAM THEUN 2 HYDROELECTRIC PROJECT IN THE LAO PEOPLE'S DEMOCRATIC REPUBLIC, November 2004. Retrieved 5 November 2009. 775: 367: 631: 821:
An International Advisory Group (IAG), advising the World Bank. The IAG normally visits Laos at least once per year.
1740: 779: 325: 1645: 608: 499: 371: 344: 321: 218: 747: 690: 673:(MIGA) of the World Bank Group (US$ 91 million). Specifically, MIGA has provided a US$ 86 million guarantee to 662: 647: 578: 375: 503: 987:
system so far. The flooded areas are not considered critical natural habitat. Formerly there was significant
1093: 2099: 1715: 1492: 582: 574: 492: 320:
as well as supplying the local area with electricity. At the time of signing in 2005, NT2 was the largest
1039:
At current sedimentation rates, the reservoir has a lifetime of more than five centuries. If substantial
754:
despite hydrological variation and consequently variation in power output. Revenues will be partially in
874: 842:, there have been substantial shortcomings in the mitigation of impacts. According to the organization, 558: 286:. Commercial operation of the plant began in April 2010. The scheme diverts water from the Nam Theun, a 2033: 1697: 1296: 847:
yet to be finalized. And the budget for the downstream program in particular is said to be inadequate.
1584: 873:
The exact number of people affected is disputed. While NTPC speaks of 40,000 affected people, the NGO
718:, but as a vehicle through which to make a considerable progress in the effort of poverty reduction." 2007: 1724: 839: 589: 459: 449: 414: 68: 1728: 1436: 711: 445: 2094: 2058: 2053: 2043: 2038: 1963: 1660: 798: 418: 383: 238: 72: 2068: 2063: 1890: 1552: 1401: 2089: 1885: 973: 682: 255: 1814: 1464: 686: 472: 463: 295: 275: 901: 782:
168 out of 179 countries assessed, making it one of the most corrupt countries on the index.
1148: 1111: 665:
provided by the above-mentioned three export credit agencies, the ADB (US$ 50 million), the
570: 546: 539: 538:
Construction costs were initially estimated at US$ 1,250 million plus US$ 331.5 million for
1668:
Doing a Dam Better : The Lao People's Democratic Republic and the Story of Nam Theun 2
28: 2012: 2002: 1906: 1834: 1735: 1701: 1656:
Ten Reasons Why the World Bank Should Not Finance the Nam Theun 2 Power Company in Lao PDR
1559: 1408: 1390: 1300: 1116: 998:
living only in the stretch of the river that will be inundated. A management plan for the
988: 678: 623: 601: 514: 417:
Provinces in central Laos, about 250 kilometers east of Vientiane. It stretches from the
1460:
Dead in the Water; Global Lessons from the World Bank's Model Hydropower Project in Laos
354:
referred to it as a "kinder and gentler dam", the project has also attracted criticism.
2073: 2048: 1997: 1880: 1849: 1809: 1178: 1003: 999: 932: 818:) (POE) reports to the government. The POE normally visits Laos at least once per year. 192: 2137: 2104: 1824: 1819: 1530: 1338: 1313: 1209: 984: 977: 879: 802: 453: 370:, but preparation resumed in 1999. In October 2002 a concession contract between the 310: 233: 1363: 1245:"International Rivers, "Model" Dam Encounters Similar Problems As Previous Projects" 1987: 1968: 1953: 1875: 1859: 1854: 1079: 1028: 1024: 794: 291: 1750: 1690:
Laos:Ministry of Energy and Mines, Department of Energy Promotion and Development
1992: 1839: 1829: 1087: 1065: 913: 905: 766:
Bank to implement a Poverty Reduction Fund that is being initially sourced from
674: 643: 627: 437: 146: 509:
Laos is a People's Democratic Republic (PDR) with a one-party system under the
1911: 1844: 1706: 1542:
World Bank:Nam Theun Moves Forward; Livelihood Activities Require Acceleration
1055: 1020: 925: 921: 422: 410: 329: 1270:"Both ENDS: 10 years after: 'Nam Theun 2 dam' has not delivered its promises" 462:, and a 27 km (17 mi) artificial downstream channel leading to the 103: 90: 1248: 1073: 949: 909: 883: 759: 751: 735: 654: 306: 301: 287: 279: 242: 156: 316:
It is the largest hydroelectric project so far in Laos, exporting power to
1458: 2081: 1979: 1898: 1605:
NTPC key communication facts:Resettlement on Nakai Plateau:Infrastructure
957: 725: 612: 374:(NTPC) and the government of Laos was signed, followed by the signing of 350: 317: 701:
of the World Bank Group, the ADB (US$ 20 million), France, and the EIB.
305:, from a 350 m (1,148 ft) difference in elevation between the 2020: 1045: 1040: 995: 917: 894: 858: 542:. More recently construction costs have been given as US$ 1.3 billion. 705:
Increase in government revenue and contribution to poverty alleviation
1790: 953: 593: 426: 1689: 1200: 1198: 1196: 332:
to funding large-scale infrastructure, after a decade-long hiatus.
1931: 1801: 1710: 1945: 1867: 928: 554: 550: 328:
projects in Southeast Asia. The dam also marked a return by the
283: 76: 1754: 836: 755: 730: 597: 141: 1647:
Update on the Lao PDR Nam Theun 2 (NT2) Hydroelectric Project
750:(PPA) between EGAT and NTPC was designed as to stabilize the 1694: 1457:
Shoemaker, Bruce; Robichaud, William, eds. (November 2019).
1293: 1682: 1228: 1226: 1107:
Energy Industry Liberalization and Privatization (Thailand)
545:
The project base cost is funded through US$ 330 million of
1463:(Paper ed.). Madison: University of Wisconsin Press. 458:
8,000,000 m (280,000,000 cu ft) artificial
968:
Three existing protected areas on the Nakai plateau (the
626:(grouped together in a "lead arrangers group" including 622:
nine international commercial banks providing finance in
378:(PPA) in November 2003 between NTPC on the one hand and, 1585:"Banking on sustainability in Nam Theun 2 - New Mandala" 893:
Water quality is negatively impacted through fouling of
669:(IDA) of the World Bank Group (US$ 50 million), and the 661:
All financing in hard currencies is guaranteed through
916:
to help them generate income beyond that derived from
793:
of the project include downstream impacts, impacts on
994:
Detailed fish surveys showed that there are no fish
714:, said in 2003 "We see Nam Theun 2 not as a project 1920: 1788: 254: 232: 224: 214: 209: 201: 191: 183: 178: 170: 162: 152: 140: 135: 127: 119: 82: 64: 21: 1421:World Bank Monitoring and Evaluation December 2006 1402:Summary Environmental and Social Impact Assessment 653:seven Thai commercial banks providing finance in 382:(EGAT) and the Laotian state-owned power company 16:Dam in Bolikhamsai and Khammouane Provinces, Laos 2154:Buildings and structures in Bolikhamsai province 1023:, regular health check-ups and the provision of 1135: 1133: 1131: 721:The project generates three forms of revenue: 468:130 km (81 mi) long, double-circuit 1766: 1318:Electricity Generating Public Company Limited 816:The Panel of Environmental and Social Experts 502:, which is owned by a consortium composed of 478:70 km (43 mi) long, single-circuit 8: 1650:. The World Bank in Lao P.D.R., October 2006 380:Electricity Generating Authority of Thailand 1711:The Nam Theun 2 Hydroelectric Project (NT2) 482:transmission line to the Lao domestic grid. 442:450 km (170 sq mi) reservoir 1773: 1759: 1751: 432:The main features of the project include: 27: 18: 1666:Ian C. Porter and Jayasankar Shivakumar: 1493:"Dams and Climate Change Kill the Mekong" 943:Downstream impacts on the Nam Theun River 1607:, March 2009. Retrieved 9 November 2009. 1553:Summary of 2004 Environmental Assessment 981:National Biodiversity Conservation Areas 671:Multilateral Investment Guarantee Agency 1127: 866:Downstream impacts in Xe Bang Fai River 48: 406:of capacity for domestic use in Laos. 768:International Development Association 699:International Development Association 667:International Development Association 197:4,039 km (1,559 sq mi) 187:3.53 km (2,860,000 acre⋅ft) 7: 2144:Hydroelectric power stations in Laos 607:three bilateral financing agencies ( 298:, enabling a generation capacity of 1518:World Bank:Good Dams, Bad Dams 2003 1206:"Lao National Committee for Energy" 1048:in the watershed of the reservoir. 1491:Fawthrop, Tom (28 November 2019). 1384:Thailand Ups Demand for Lao Energy 14: 1720:Nam Theun 2 Hydroelectric Project 553:. It is financed through equity, 205:450 km (170 sq mi) 2118: 2117: 2080: 2019: 1978: 1944: 1930: 1897: 1866: 1800: 1339:"Nam Theun 2 Hydropower Project" 1314:"Operating Power Plants Lao PDR" 1175:Nam Theun 2 Power Company (NTPC) 1086: 1072: 1058: 791:Environmental and social impacts 786:Environmental and social impacts 677:of Belgium against the risks of 511:Lao People's Revolutionary Party 47: 40: 924:systems to allow for a second, 774:In 2007 Laos was ranked on the 491:The project is structured as a 421:to the lower Xe Bang Fai River 338:Official Development Assistance 56:Location of Nam Theun 2 in Laos 1782:Dams in the Mekong River Basin 904:. The programs are focused on 617:Export-Import Bank of Thailand 567:multilateral development banks 268:Nam Theun 2 Hydropower Project 1: 1573:Key facts, Downstream Program 1571:Nam Theun 2 Project Company: 1529:Nam Theun 2 Project Company: 1102:Environmental impacts of dams 498:The project was developed by 436:39 m (128 ft) high 250:: 4 × 250 MW Francis turbine 1683:Nam Theun 2 official website 1531:DSIP_080408_PUBLIC_Final.pdf 710:Director of the World Bank, 402:. The project also supplies 398:of electrical energy to the 343:The project has significant 131:December 2010 (Inauguration) 1433:"International Rivers NT 2" 850:Bruce Shoemaker, editor of 776:Corruption Perception Index 534:Project costs and financing 394:NT2 enables Laos to export 368:1997 Asian financial crisis 2170: 1741:Environmental Defense Fund 1294:Nam Theun official website 780:Transparency International 487:Institutional arrangements 362:History and current status 174:436 m (1,430 ft) 2113: 1745:Laos: Nam Theun 2 Project 1303:, accessed on 20 May 2010 1233:World Bank September 2007 809:Monitoring and Evaluation 691:transfer inconvertibility 609:French Development Agency 376:power purchase agreements 372:Nam Theun 2 Power Company 219:Nam Theun 2 Power Company 35: 26: 964:Biodiversity and forests 748:power purchase agreement 738:, i.e., concession fees. 663:political risk insurance 648:Bank of Tokyo-Mitsubishi 632:Crédit Agricole Indosuez 579:European Investment Bank 1171:"Technical Information" 1094:Renewable energy portal 1035:Reservoir sedimentation 557:and guarantees from 26 549:and US$ 920 million of 513:. It is one of the few 256:Installed capacity 166:39 m (128 ft) 120:Construction began 1716:Asian Development Bank 1670:, The World Bank, 2010 1644:The World Bank (2006) 1145:Nam Theun 2 Dam (NTPC) 590:export credit agencies 583:Nordic Investment Bank 575:Asian Development Bank 559:financial institutions 493:build-operate-transfer 104:17.99694°N 104.95278°E 875:Environmental Defense 827:The Lenders' Engineer 142:Type of dam 1725:International Rivers 840:International Rivers 225:Commission date 2149:Interbasin transfer 1695:Electricité du Laos 1661:Probe International 384:Electricite du Laos 193:Catchment area 184:Total capacity 109:17.99694; 104.95278 100: /  2100:Stung Battambang 1 1734:2007-12-30 at the 1700:2015-04-05 at the 1558:2007-04-15 at the 1407:2007-04-15 at the 1389:2008-10-10 at the 1341:. Power Technology 1299:2011-11-26 at the 683:breach of contract 390:Technical features 322:foreign investment 2131: 2130: 1921:On tributaries of 1653:Ryder, G. (2004) 1499:. Yale University 1497:YaleGlobal Online 882:, and impacts on 852:Dead in the Water 835:According to the 758:and partially in 687:civil disturbance 529:Financial aspects 473:transmission line 464:Xe Bang Fai River 296:Xe Bang Fai River 276:hydroelectric dam 264: 263: 202:Surface area 136:Dam and spillways 128:Opening date 2161: 2121: 2120: 2085: 2084: 2024: 2023: 2008:Lam Phra Phloeng 1983: 1982: 1949: 1948: 1935: 1934: 1923:the Mekong River 1902: 1901: 1871: 1870: 1805: 1804: 1775: 1768: 1761: 1752: 1686: 1685: 1633: 1632: 1630: 1629: 1620:. Archived from 1614: 1608: 1602: 1596: 1595: 1593: 1592: 1581: 1575: 1569: 1563: 1550: 1544: 1539: 1533: 1527: 1521: 1515: 1509: 1508: 1506: 1504: 1488: 1482: 1481: 1479: 1477: 1454: 1448: 1447: 1445: 1444: 1435:. Archived from 1429: 1423: 1418: 1412: 1399: 1393: 1381: 1375: 1374: 1372: 1371: 1362:. Archived from 1356: 1350: 1349: 1347: 1346: 1335: 1329: 1328: 1326: 1324: 1310: 1304: 1291: 1285: 1284: 1282: 1281: 1272:. Archived from 1266: 1260: 1259: 1257: 1256: 1247:. Archived from 1241: 1235: 1230: 1221: 1220: 1218: 1217: 1208:. Archived from 1202: 1191: 1190: 1188: 1186: 1177:. Archived from 1167: 1161: 1160: 1158: 1156: 1147:. Archived from 1141:"History of NT2" 1137: 1112:Wildlife of Laos 1096: 1091: 1090: 1082: 1077: 1076: 1068: 1063: 1062: 1061: 801:, and reservoir 640:Société Générale 638:from Australia, 571:World Bank Group 515:communist states 481: 475:to the Thai grid 471: 405: 397: 304: 115: 114: 112: 111: 110: 105: 101: 98: 97: 96: 93: 51: 50: 44: 31: 19: 2169: 2168: 2164: 2163: 2162: 2160: 2159: 2158: 2134: 2133: 2132: 2127: 2109: 2095:Lower Sre Pok 2 2079: 2078: 2018: 2017: 1977: 1976: 1943: 1942: 1929: 1922: 1916: 1896: 1895: 1865: 1864: 1799: 1784: 1779: 1747:, 15 March 2006 1736:Wayback Machine 1702:Wayback Machine 1681: 1680: 1677: 1641: 1639:Further reading 1636: 1627: 1625: 1616: 1615: 1611: 1603: 1599: 1590: 1588: 1583: 1582: 1578: 1570: 1566: 1560:Wayback Machine 1551: 1547: 1540: 1536: 1528: 1524: 1516: 1512: 1502: 1500: 1490: 1489: 1485: 1475: 1473: 1471: 1456: 1455: 1451: 1442: 1440: 1431: 1430: 1426: 1419: 1415: 1409:Wayback Machine 1400: 1396: 1391:Wayback Machine 1382: 1378: 1369: 1367: 1358: 1357: 1353: 1344: 1342: 1337: 1336: 1332: 1322: 1320: 1312: 1311: 1307: 1301:Wayback Machine 1292: 1288: 1279: 1277: 1268: 1267: 1263: 1254: 1252: 1243: 1242: 1238: 1231: 1224: 1215: 1213: 1204: 1203: 1194: 1184: 1182: 1181:on 5 March 2016 1169: 1168: 1164: 1154: 1152: 1151:on 4 March 2016 1139: 1138: 1129: 1125: 1117:Economy of Laos 1092: 1085: 1078: 1071: 1064: 1059: 1057: 1054: 1037: 1012: 1000:Asian elephants 989:illegal logging 970:Nakai-Nam Theun 966: 945: 868: 788: 707: 624:hard currencies 600:of Sweden, and 581:(EIB), and the 536: 531: 489: 479: 469: 460:regulating pond 450:pressure tunnel 403: 395: 392: 364: 299: 246: 108: 106: 102: 99: 94: 91: 89: 87: 86: 60: 59: 58: 57: 54: 53: 52: 17: 12: 11: 5: 2167: 2165: 2157: 2156: 2151: 2146: 2136: 2135: 2129: 2128: 2126: 2125: 2114: 2111: 2110: 2108: 2107: 2102: 2097: 2092: 2090:Lower Se San 2 2087: 2076: 2071: 2066: 2061: 2056: 2051: 2046: 2041: 2036: 2031: 2026: 2015: 2010: 2005: 2000: 1995: 1990: 1985: 1974: 1971: 1966: 1961: 1956: 1951: 1940: 1937: 1926: 1924: 1918: 1917: 1915: 1914: 1909: 1904: 1893: 1888: 1883: 1878: 1873: 1862: 1857: 1852: 1847: 1842: 1837: 1832: 1827: 1822: 1817: 1812: 1807: 1796: 1794: 1786: 1785: 1780: 1778: 1777: 1770: 1763: 1755: 1749: 1748: 1738: 1722: 1713: 1704: 1692: 1687: 1676: 1675:External links 1673: 1672: 1671: 1664: 1651: 1640: 1637: 1635: 1634: 1609: 1597: 1576: 1564: 1545: 1534: 1522: 1510: 1483: 1469: 1449: 1424: 1413: 1394: 1376: 1351: 1330: 1305: 1286: 1261: 1236: 1222: 1192: 1162: 1126: 1124: 1121: 1120: 1119: 1114: 1109: 1104: 1098: 1097: 1083: 1069: 1053: 1050: 1036: 1033: 1011: 1008: 985:national parks 965: 962: 944: 941: 933:drinking water 867: 864: 829: 828: 825: 822: 819: 787: 784: 740: 739: 733: 728: 712:Shengman Zhang 706: 703: 659: 658: 651: 620: 605: 586: 535: 532: 530: 527: 517:in the world. 488: 485: 484: 483: 476: 466: 456: 446:Pressure shaft 443: 440: 391: 388: 363: 360: 358:environment." 262: 261: 258: 252: 251: 245:Pelton turbine 236: 230: 229: 226: 222: 221: 216: 212: 211: 207: 206: 203: 199: 198: 195: 189: 188: 185: 181: 180: 176: 175: 172: 168: 167: 164: 160: 159: 154: 150: 149: 144: 138: 137: 133: 132: 129: 125: 124: 121: 117: 116: 84: 80: 79: 66: 62: 61: 55: 46: 45: 39: 38: 37: 36: 33: 32: 24: 23: 15: 13: 10: 9: 6: 4: 3: 2: 2166: 2155: 2152: 2150: 2147: 2145: 2142: 2141: 2139: 2124: 2116: 2115: 2112: 2106: 2103: 2101: 2098: 2096: 2093: 2091: 2088: 2083: 2077: 2075: 2072: 2070: 2067: 2065: 2062: 2060: 2057: 2055: 2052: 2050: 2047: 2045: 2042: 2040: 2037: 2035: 2034:Buon Tua Srah 2032: 2030: 2027: 2022: 2016: 2014: 2011: 2009: 2006: 2004: 2001: 1999: 1996: 1994: 1991: 1989: 1986: 1981: 1975: 1972: 1970: 1967: 1965: 1964:Theun Hinboun 1962: 1960: 1957: 1955: 1952: 1947: 1941: 1938: 1933: 1928: 1927: 1925: 1919: 1913: 1910: 1908: 1905: 1900: 1894: 1892: 1889: 1887: 1884: 1882: 1879: 1877: 1874: 1869: 1863: 1861: 1858: 1856: 1853: 1851: 1848: 1846: 1843: 1841: 1838: 1836: 1833: 1831: 1828: 1826: 1823: 1821: 1818: 1816: 1813: 1811: 1808: 1803: 1798: 1797: 1795: 1792: 1787: 1783: 1776: 1771: 1769: 1764: 1762: 1757: 1756: 1753: 1746: 1742: 1739: 1737: 1733: 1730: 1726: 1723: 1721: 1717: 1714: 1712: 1708: 1705: 1703: 1699: 1696: 1693: 1691: 1688: 1684: 1679: 1678: 1674: 1669: 1665: 1662: 1658: 1657: 1652: 1649: 1648: 1643: 1642: 1638: 1624:on 2008-04-03 1623: 1619: 1613: 1610: 1606: 1601: 1598: 1586: 1580: 1577: 1574: 1568: 1565: 1561: 1557: 1554: 1549: 1546: 1543: 1538: 1535: 1532: 1526: 1523: 1519: 1514: 1511: 1498: 1494: 1487: 1484: 1472: 1470:9780299317942 1466: 1462: 1461: 1453: 1450: 1439:on 2007-12-30 1438: 1434: 1428: 1425: 1422: 1417: 1414: 1410: 1406: 1403: 1398: 1395: 1392: 1388: 1385: 1380: 1377: 1366:on 2008-04-01 1365: 1361: 1355: 1352: 1340: 1334: 1331: 1319: 1315: 1309: 1306: 1302: 1298: 1295: 1290: 1287: 1276:on 2016-08-11 1275: 1271: 1265: 1262: 1251:on 2007-07-15 1250: 1246: 1240: 1237: 1234: 1229: 1227: 1223: 1212:on 2007-12-17 1211: 1207: 1201: 1199: 1197: 1193: 1180: 1176: 1172: 1166: 1163: 1150: 1146: 1142: 1136: 1134: 1132: 1128: 1122: 1118: 1115: 1113: 1110: 1108: 1105: 1103: 1100: 1099: 1095: 1089: 1084: 1081: 1075: 1070: 1067: 1056: 1051: 1049: 1047: 1042: 1034: 1032: 1030: 1026: 1025:mosquito nets 1022: 1016: 1009: 1007: 1005: 1001: 997: 992: 990: 986: 982: 979: 978:Phou Hin Poun 975: 971: 963: 961: 959: 955: 951: 942: 940: 936: 934: 930: 927: 923: 919: 915: 911: 907: 903: 898: 896: 891: 887: 885: 881: 880:water quality 876: 871: 865: 863: 860: 855: 853: 848: 845: 841: 838: 833: 826: 823: 820: 817: 814: 813: 812: 810: 806: 804: 803:sedimentation 800: 796: 792: 785: 783: 781: 777: 772: 769: 763: 761: 757: 753: 749: 744: 737: 734: 732: 729: 727: 724: 723: 722: 719: 717: 713: 704: 702: 700: 695: 692: 689:, as well as 688: 684: 680: 679:expropriation 676: 672: 668: 664: 656: 652: 649: 645: 641: 637: 633: 629: 625: 621: 618: 614: 610: 606: 603: 599: 595: 591: 587: 584: 580: 576: 572: 568: 564: 563: 562: 560: 556: 552: 548: 543: 541: 540:contingencies 533: 528: 526: 522: 518: 516: 512: 507: 505: 501: 496: 494: 486: 477: 474: 467: 465: 461: 457: 455: 451: 447: 444: 441: 439: 435: 434: 433: 430: 428: 424: 420: 419:Nakai Plateau 416: 412: 407: 401: 389: 387: 385: 381: 377: 373: 369: 361: 359: 355: 353: 352: 346: 345:environmental 341: 339: 333: 331: 327: 323: 319: 314: 312: 311:power station 308: 303: 297: 293: 289: 285: 281: 277: 273: 269: 259: 257: 253: 249: 244: 240: 237: 235: 231: 227: 223: 220: 217: 213: 210:Power Station 208: 204: 200: 196: 194: 190: 186: 182: 177: 173: 169: 165: 161: 158: 155: 151: 148: 145: 143: 139: 134: 130: 126: 122: 118: 113: 85: 81: 78: 74: 70: 67: 63: 43: 34: 30: 25: 20: 1958: 1655: 1646: 1626:. Retrieved 1622:the original 1618:"World Bank" 1612: 1600: 1589:. Retrieved 1587:. 2010-11-15 1579: 1567: 1548: 1537: 1525: 1513: 1501:. Retrieved 1496: 1486: 1474:. Retrieved 1459: 1452: 1441:. Retrieved 1437:the original 1427: 1416: 1397: 1379: 1368:. Retrieved 1364:the original 1354: 1343:. Retrieved 1333: 1321:. Retrieved 1317: 1308: 1289: 1278:. Retrieved 1274:the original 1264: 1253:. Retrieved 1249:the original 1239: 1214:. Retrieved 1210:the original 1183:. Retrieved 1179:the original 1174: 1165: 1153:. Retrieved 1149:the original 1144: 1080:Water portal 1038: 1029:productivity 1017: 1013: 1010:Resettlement 993: 967: 946: 937: 899: 892: 888: 872: 869: 856: 851: 849: 844:compensation 834: 830: 808: 807: 799:resettlement 795:biodiversity 789: 773: 764: 745: 741: 720: 715: 708: 696: 660: 561:, including 544: 537: 523: 519: 508: 497: 490: 431: 408: 393: 365: 356: 349: 342: 334: 315: 292:Mekong River 271: 270:, or simply 267: 265: 2013:Lam Takhong 2003:Ubol Ratana 1959:Nam Theun 2 1907:Stung Treng 1835:Gongguoqiao 1729:Nam Theun 2 1503:26 November 1476:26 November 1323:26 November 1066:Laos portal 974:Hin Nam Nor 914:handicrafts 906:agriculture 675:Fortis Bank 644:Fortis Bank 628:BNP Paribas 604:of Norway), 596:of France, 577:(ADB), the 438:gravity dam 415:Bolikhamxay 241:: 2 × 37.5 215:Operator(s) 147:Gravity dam 107: / 95:104°57′10″E 83:Coordinates 75:Provinces, 69:Bolikhamsai 22:Nam Theun 2 2138:Categories 2049:Plei Krong 2039:Dray Hling 1998:Sirindhorn 1973:Xe Kaman 3 1881:Don Sahong 1850:Dachaoshan 1810:Wunonglong 1707:World Bank 1628:2007-12-31 1591:2016-07-19 1443:2007-12-31 1370:2007-12-31 1360:"MIGA NT2" 1345:2010-07-19 1280:2016-07-19 1255:2007-07-07 1216:2008-01-01 1123:References 1021:sanitation 976:, and the 926:dry season 922:irrigation 910:fish ponds 685:, war and 615:, and the 454:powerhouse 423:confluence 411:Khammouane 330:World Bank 228:April 2010 92:17°59′49″N 73:Khammouane 2105:Stung Sen 2059:Sre Pok 4 2054:Sre Pok 3 2044:Duc Xuyen 2029:Buon Kuop 1825:Dahuaqiao 1820:Huangdeng 1663:, Toronto 1004:watershed 950:Fishermen 884:fisheries 760:Thai baht 752:cash flow 736:royalties 726:dividends 655:Thai baht 425:with the 307:reservoir 294:, to the 288:tributary 282:River in 280:Nam Theun 179:Reservoir 157:Nam Theun 2123:Category 2069:Se San 4 2064:Se San 3 1988:Huai Kum 1969:Houay Ho 1954:Nam Ngum 1939:Xi'er He 1891:Ban Koum 1876:Xayaburi 1860:Jinghong 1855:Nuozhadu 1732:Archived 1698:Archived 1556:Archived 1405:Archived 1387:Archived 1297:Archived 1052:See also 958:sediment 613:PROPARCO 351:Newsweek 318:Thailand 309:and the 260:1,075 MW 234:Turbines 153:Impounds 65:Location 1993:Pak Mun 1886:Pakchom 1840:Xiaowan 1830:Miaowei 1562:, p. 39 1520:, p. 22 1185:6 March 1155:6 March 1046:erosion 1041:logging 996:species 954:hunters 918:fishing 902:Mahaxai 895:biomass 859:hectare 290:of the 278:on the 274:, is a 1912:Sambor 1845:Manwan 1791:Mekong 1467:  972:, the 931:crop, 912:, and 716:per se 650:), and 646:, and 594:Coface 588:three 573:, the 547:equity 480:115 kV 470:500 kV 452:and a 427:Mekong 396:995 MW 300:1,075 171:Length 163:Height 1793:River 731:taxes 569:(the 565:four 555:loans 404:75 MW 2074:Yaly 1815:Lidi 1505:2019 1478:2019 1465:ISBN 1325:2019 1187:2016 1157:2016 952:and 929:rice 746:The 602:GIEK 551:debt 500:NTPC 413:and 400:EGAT 284:Laos 266:The 248:EGAT 123:2005 77:Laos 71:and 1789:On 837:NGO 778:by 756:USD 636:ANZ 598:EKN 504:EDF 340:". 326:IPP 272:NT2 239:EDL 2140:: 1659:. 1495:. 1316:. 1225:^ 1195:^ 1173:. 1143:. 1130:^ 908:, 886:. 797:, 681:, 642:, 634:, 630:, 619:), 611:, 585:), 448:, 429:. 313:. 302:MW 243:MW 2086:: 2025:: 1984:: 1950:: 1936:: 1903:: 1872:: 1806:: 1774:e 1767:t 1760:v 1743:: 1727:: 1718:: 1709:: 1631:. 1594:. 1507:. 1480:. 1446:. 1373:. 1348:. 1327:. 1283:. 1258:. 1219:. 1189:. 1159:. 657:. 592:(

Index


Nam Theun 2 Dam is located in Laos
Bolikhamsai
Khammouane
Laos
17°59′49″N 104°57′10″E / 17.99694°N 104.95278°E / 17.99694; 104.95278
Type of dam
Gravity dam
Nam Theun
Catchment area
Nam Theun 2 Power Company
Turbines
EDL
MW
EGAT
Installed capacity
hydroelectric dam
Nam Theun
Laos
tributary
Mekong River
Xe Bang Fai River
MW
reservoir
power station
Thailand
foreign investment
IPP
World Bank
Official Development Assistance