160:. It is constructed by arranging sets (two or more) of matched blocks in a regular log-cabin style to form a rising square or rectangular frame. The more blocks on each level, the greater the number of support points and therefore the greater the strength of the crib tower. In trench rescue training materials three basic types of box cribbing are the 4-point, 9-point and full crib. The four point type has two timbers on each level thus four points of contact. Three timbers on each layer makes nine points of contact. The full crib type has each layer filled with timbers. Each point of contact carries a maximum load depending on the size and species of the timbers.
36:
207:
237:. Subassemblies that have been disconnected are supported by cribbing until reassembly. In such work, cribbing is often safer than jack stands because it is less likely to tip over. And if the metal parts bite into the wood, this helps to keep sliding from happening. These factors are especially true in field repairs, because most ground is not perfectly level and hard, like a concrete garage floor would be. Even on concrete, cribbing is often preferred.
195:
28:
214:
Cribbing is often performed as part of lifting/lowering operations. Expressions such as "lift an inch, crib an inch" and "pack as you jack" are used to remind operators of the importance of cribbing to secure and protect the load. The use of cribbing also allows for the use of a lifting device with a
140:
Cribbing equipment is normally of three varieties: rectangular blocks, wedges (also called shims), and "step chocks" (large wooden chocks constructed of wood of different lengths). Shims are used to snug up contact between the crib and supported object or change the direction of the crib (tilt). Step
89:
The stability of a crib is affected by a variety of factors: the material used (often a soft wood which gives audible warnings before failure), the number of contact points between the crib and the supported surface, the ratio of the footprint of the crib to its height, and the area of contact made
251:
Cribbing is used when moving buildings in whole, or in part. Cribbing is used to raise the structure and allow the carrying vehicle to be positioned underneath, at which point the structure is then lowered onto the vehicle and the cribbing towers are removed. At the other end of the operation, the
126: in or 140 mm) and 18–24 in (460–610 mm) long. Soft woods, like spruce and pine, are often preferred because they crack slowly and make loud noises before completely failing, whereas stiffer woods may fail explosively and without warning.
185:
crib is a box crib in which pairs of shims are used to change the direction of the rising structure, resulting in a curve. Curving a crib must be done in moderation and is only advisable for structures at sharp angles to the ground.
20:
223:) as the load can be raised to the maximum range of the device, then lowered a short distance onto the cribbing, allowing another platform of cribbing to be built to raise the device and repeat the process.
81:
Some forms of cribbing can be used on movie sets and/or production sites for stabilizing dolly tracks, platforms, and various temporary structures when quick setup times are needed.
226:
Cribbing can be used to secure a load following a building collapse, vehicular accident or other event where the regular stability of a structure or vehicle has been reduced.
149:
Cribbing structures are often categorized by shape. Different shapes of cribbing structures are chosen depending on the area available and the point being cribbed to.
129:
Cribbing may also be made out of plastic, which unlike wood is not susceptible to rot or corrosion from fluids the cribbing may come in contact with (e.g. oil,
70:. Cribbing is often used in conjunction with other stabilization equipment, such as pneumatic or hydraulic shoring. Cribbing is also used in
366:
317:
141:
chocks are often used as a quick solution for stabilizing vehicles on all fours or to quickly increase the height of a crib.
371:
35:
376:
291:
A description of two men lifting a demountable building off a truck and placing it on prepared foundations by hand.
330:
Factors affecting strength and stability of wood cribbing: height, configuration, and horizontal displacement
63:
206:
220:
39:
59:
71:
171:
crib is similar to the box crib, except it resembles a triangular prism instead of rectangular.
313:
245:
361:
230:
134:
55:
198:
A house is supported by box cribs while new foundation is being constructed as part of a
66:. It is commonly used to secure overturned motor vehicles, and debris within collapsed
241:
234:
75:
355:
216:
199:
288:
54:
is a temporary wooden structure used to support heavy objects during construction,
27:
266:
261:
31:
Hardwood railway sleepers used as a box crib, North
Australian Railway, 1975
194:
252:
process is reversed, and the structure is lowered into its new position.
130:
67:
276:
19:
42:, Harpswell, Maine. The only granite cribstone bridge in the world.
205:
193:
34:
26:
18:
98:
Cribbing is usually accomplished with blocks of wood, often 4×4 (
312:. Sudbury, Mass.: Jones and Bartlett Publishers, 2008. 128-129.
332:. Pgh. Pa.: U.S. Dept. of the Interior, Bureau of Mines, 1988.
271:
210:
Cribbing blocks supporting a subassembly during tractor repair
156:
crib is the simplest, most stable and most common method of
74:
as a roof support. Cribbing has largely been replaced by
90:
between the crib and the ground and supported surface.
310:Trench rescue: awareness, operations, technician
345:. Tulsa, Okla.: Penn Well Corp., 2012. 94-95.
8:
328:Barczak, Thomas M., and Carol L. Tasillo.
343:Collapse operations for first responders
229:Cribbing is often used in the repair of
301:
7:
14:
215:limited working range (such as a
178:crib resembles a diamond prism.
112: in or 89 mm) or 6×6 (
78:in modern mining applications.
1:
244:, cribbing is a part of the
16:Temporary support structure
393:
64:urban search and rescue
221:hydraulic rescue tools
219:, lifting air bags or
211:
203:
43:
32:
24:
23:A lightweight box crib
367:Moving and relocation
209:
197:
38:
30:
22:
372:Building engineering
40:Bailey Island Bridge
308:Martinette, C. V..
60:vehicle extrication
341:Connell, John P..
212:
204:
72:sub-surface mining
44:
33:
25:
377:Mining techniques
76:hydraulic shoring
384:
346:
339:
333:
326:
320:
306:
125:
124:
120:
117:
111:
110:
106:
103:
392:
391:
387:
386:
385:
383:
382:
381:
352:
351:
350:
349:
340:
336:
327:
323:
307:
303:
298:
289:Using box cribs
285:
258:
231:heavy equipment
192:
147:
135:hydraulic fluid
122:
118:
115:
113:
108:
104:
101:
99:
96:
87:
17:
12:
11:
5:
390:
388:
380:
379:
374:
369:
364:
354:
353:
348:
347:
334:
321:
300:
299:
297:
294:
293:
292:
284:
283:External links
281:
280:
279:
274:
269:
264:
257:
254:
242:heavy industry
235:farm equipment
191:
188:
146:
143:
95:
92:
86:
83:
15:
13:
10:
9:
6:
4:
3:
2:
389:
378:
375:
373:
370:
368:
365:
363:
360:
359:
357:
344:
338:
335:
331:
325:
322:
319:
315:
311:
305:
302:
295:
290:
287:
286:
282:
278:
275:
273:
270:
268:
265:
263:
260:
259:
255:
253:
249:
247:
243:
238:
236:
232:
227:
224:
222:
218:
208:
201:
200:house lifting
196:
189:
187:
184:
179:
177:
176:parallelogram
172:
170:
166:
161:
159:
155:
150:
144:
142:
138:
136:
132:
127:
93:
91:
84:
82:
79:
77:
73:
69:
65:
61:
57:
53:
49:
41:
37:
29:
21:
342:
337:
329:
324:
309:
304:
250:
239:
228:
225:
213:
183:tilted tower
182:
180:
175:
173:
168:
164:
162:
157:
153:
151:
148:
139:
128:
97:
88:
80:
51:
47:
45:
248:'s trade.
356:Categories
318:0763742066
296:References
56:relocation
267:Crib pier
262:Crib barn
94:Materials
85:Stability
68:buildings
272:Crib dam
256:See also
202:process.
165:triangle
158:cribbing
131:gasoline
52:cribbing
48:box crib
277:Shoring
145:Methods
121:⁄
107:⁄
362:Rescue
316:
246:rigger
314:ISBN
217:jack
190:Uses
62:and
240:In
233:or
167:or
154:box
137:).
50:or
358::
181:A
174:A
169:A'
163:A
152:A
133:,
58:,
46:A
123:2
119:1
116:+
114:5
109:2
105:1
102:+
100:3
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.