124: 422:. In order to precisely place the cement slurry at a required interval on the outside of the casing, a plug is pumped with a displacement fluid behind the cement slurry column, which "bumps" in the casing shoe and prevents further flow of fluid through the shoe. This bump can be seen at surface as a pressure spike at the cement pump. To prevent the cement from flowing back into the inside of the casing, a float collar above the casing shoe acts as a 223: 140: 25: 132: 286:
of axial and hoop stresses), must be sufficient at various depths. Pipe of differing strengths often comprises a long casing string, which typically will have the greatest axial tension and perhaps highest internal burst pressure differentials in the upper parts, and the greatest collapsing loads deeper in the well from external pressure vs lowered internal pressure.
340:
The purpose of surface casing is to isolate freshwater zones so that they are not contaminated during drilling and completion. Surface casing is the most strictly regulated due to these environmental concerns, which can include regulation of casing depth and cement quality. A typical size of surface
285:
Casing design for each size of designed pipes is done by calculating the worst conditions that may be faced during drilling and over the producing life of the well. Mechanical properties such as longitudinal tensile strength, and burst and collapse resistance (calculated considering biaxial effects
277:
must be large enough to accommodate the casing to be placed inside it, allowing room for cement between the outside of that casing and the hole. Also, subsequent bits that will continue drilling obviously must pass through existing casing strings. Thus, each casing string will have a subsequently
590: 370:
In order to reduce cost, a liner may be used which extends just above the shoe (bottom) of the previous casing interval and hung off downhole rather than at the surface. It may typically be 7", although many liners match the diameter of the
366:
that can fracture shallower or deeper formations. Casing placement is selected so that the hydrostatic pressure of the drilling fluid remains at a pressure level that is between formation pore pressures and fracture pressures.
660: 158:. Similar to the bones of a spine protecting the spinal cord, casing is set inside the drilled borehole to protect and support the wellstream. The lower portion (and sometimes the entirety) is typically held in place with 262:
and others, will pick strategic depths at which the hole will need to be cased in order for drilling to reach the desired total depth. This decision is often based on subsurface data such as
333:
The conductor casing serves as a support during drilling operations, to flowback returns during drilling and cementing of the surface casing, and to prevent collapse of the loose
398:. Tubing is easier to remove for maintenance, replacement, or for various types of workover operations. It is significantly lighter than casing and does not require a 309:
Typically, a well contains multiple intervals of casing successively placed within the previous casing run. The following casing intervals are typically used in an
219:
Optimum design of the casing program decreases the well construction costs, enhances the efficiency of operations and also diminishes the environmental impacts.
278:
smaller diameter. The inside diameter of the final casing string (or penultimate one in some instances of a liner completion) must accommodate the
639: 685: 42: 608: 434:
A prolonged, recurrent axial and rotational movement within casing would cause wear to the casing interior, with the probability of
108: 301:. The lower members of the wellhead usually are installed on top of the first casing string after it has been cemented in place. 162:. Deeper strings usually are not cemented all the way to the surface, so the weight of the pipe must be partially supported by a 394:
is therefore installed inside the last casing string and the tubing annulus is usually sealed at the bottom of the tubing by a
89: 550: 46: 61: 714: 68: 35: 298: 75: 263: 435: 206: 151: 57: 655: 511: 273:
With the casing set depths determined, hole sizes and casing sizes must follow. The hole drilled for each
468:
Minimization of dogleg severity and expect real dogleg at least 1.5 times higher than the planned value.
363: 677: 123: 719: 709: 571: 566:
Fontenot, Kyle R.; Strickler, Bob; Warren, T. (2005). "Using Casing to Drill Directional Wells".
337:
near the surface. It can normally vary from sizes such as 18 to 30 in (460 to 760 mm).
184:
Prevents unstable upper formations from caving in and sticking the drill string or forming large
682: 635: 604: 546: 395: 391: 372: 279: 255: 235: 694: 82: 596: 239: 222: 689: 282:
and associated hardware such as packers, gas lift mandrels and subsurface safety valves.
475: 267: 192: 703: 464:
The following are recommendations for preventative measures to minimize casing wear:
419: 290: 274: 243: 163: 575: 399: 387: 359: 238:, is often used without cement inside the final casing string of a well to contain 358:
Intermediate casing may be necessary on longer drilling intervals where necessary
423: 415: 178: 139: 24: 445: 383: 378:
Few wells actually produce through casing, since producing fluids can corrode
658:, "Closed-Loop Systems and Methods for Geothermal Electricity Generation" 414:
slurry through the inside of the casing and out into the annulus through the
402:
to run in and out of hole; smaller "service rigs" are used for this purpose.
270:, and is balanced against the cost objectives and desired drilling strategy. 259: 173:
Casing that is cemented in place aids the drilling process in several ways:
131: 226:
Casing arranged on a rack at a drilling rig in preparation for installation
205:
Seals off high pressure zones from the surface, minimizing potential for a
310: 294: 199: 167: 155: 484:
Select proper mud type and add lubricants to minimize wear and friction.
426:
and prevents fluid from flowing up through the shoe from the annulus.
600: 411: 185: 159: 215:
Provides a smooth internal bore for installing production equipment.
154:
that is assembled and inserted into a recently drilled section of a
438:, production loss, and other hazardous and costly complications. 379: 231: 221: 138: 130: 122: 490:
Usage of thick wall casing in the anticipated wear section area.
334: 191:
Provides a strong upper foundation to allow use of high-density
632:
Petroleum Engineering Handbook, Volume II: Drilling Engineering
589:
Wagner, R. R.; Warling, D. J.; Halal, A. S. (January 1, 1996).
212:
Prevents fluid loss into or contamination of production zones.
18: 634:. Society of Petroleum Engineers. 2007. pp. 287–288. 202:
or fluids, in the drilled formations from one another.
441:
The following conditions contribute to casing wear:
242:and convey them to the surface from an underground 49:. Unsourced material may be challenged and removed. 198:Isolates various zones, which may have different 390:and the larger diameter can make flow unstable. 143:premium gas tight connections on a casing string 471:Usage of casing friendly tool joint materials. 8: 109:Learn how and when to remove this message 410:Cementing is performed by circulating a 503: 362:weight to prevent blowouts may cause a 683:Schlumberger Oilfield Glossary: Casing 297:, which later will be topped with the 7: 626: 624: 622: 620: 536: 534: 532: 254:In the planning stages of a well, a 47:adding citations to reliable sources 595:. Society of Petroleum Engineers. 493:Usage of software to reduce risks. 14: 289:Casing strings are supported by 23: 487:Usage of drill pipe protectors. 34:needs additional citations for 545:. springer. pp. 185–243. 323:Intermediate casing (optional) 127:Casing Diameters of a Borehole 1: 543:Oil Well Drilling Engineering 474:Minimize rotor speed and use 16:Pipe inserted into a borehole 195:to continue drilling deeper. 736: 656:US patent 2012174581A1 592:Minimum Cost Casing Design 258:, usually with input from 177:Prevents contamination of 382:or form deposits such as 266:pressures and strengths, 541:Rabia, Hussain (1986). 512:"How Does Casing Work?" 355:inches (340 mm). 227: 144: 136: 128: 58:"Casing" borehole 695:How Does Casing Work? 418:at the bottom of the 230:A slightly different 225: 142: 134: 126: 460:Well path and dogleg 364:hydrostatic pressure 293:that are set in the 150:is a large diameter 43:improve this article 715:Drilling technology 688:2012-07-16 at the 457:Tool joint coating 228: 145: 137: 129: 641:978-1-55563-114-7 451:Mud and additives 392:Production tubing 373:production tubing 326:Production casing 280:production tubing 256:drilling engineer 240:production fluids 236:production tubing 119: 118: 111: 93: 727: 665: 664: 663: 659: 652: 646: 645: 628: 615: 614: 601:10.2118/36448-MS 586: 580: 579: 563: 557: 556: 538: 527: 526: 524: 522: 508: 354: 353: 349: 346: 329:Production liner 317:Conductor casing 114: 107: 103: 100: 94: 92: 51: 27: 19: 735: 734: 730: 729: 728: 726: 725: 724: 700: 699: 690:Wayback Machine 674: 669: 668: 661: 654: 653: 649: 642: 630: 629: 618: 611: 588: 587: 583: 568:Oilfield Review 565: 564: 560: 553: 540: 539: 530: 520: 518: 516:www.rigzone.com 510: 509: 505: 500: 432: 408: 351: 347: 344: 342: 307: 252: 234:string, called 115: 104: 98: 95: 52: 50: 40: 28: 17: 12: 11: 5: 733: 731: 723: 722: 717: 712: 702: 701: 698: 697: 692: 680: 673: 672:External links 670: 667: 666: 647: 640: 616: 609: 581: 558: 551: 528: 502: 501: 499: 496: 495: 494: 491: 488: 485: 482: 479: 476:downhole motor 472: 469: 462: 461: 458: 455: 452: 449: 431: 428: 407: 404: 388:paraffin waxes 331: 330: 327: 324: 321: 320:Surface casing 318: 306: 303: 299:Christmas tree 291:casing hangers 268:well integrity 251: 248: 217: 216: 213: 210: 203: 196: 193:drilling fluid 189: 182: 135:Casing Diagram 117: 116: 31: 29: 22: 15: 13: 10: 9: 6: 4: 3: 2: 732: 721: 718: 716: 713: 711: 708: 707: 705: 696: 693: 691: 687: 684: 681: 679: 676: 675: 671: 657: 651: 648: 643: 637: 633: 627: 625: 623: 621: 617: 612: 610:9781555634230 606: 602: 598: 594: 593: 585: 582: 577: 573: 569: 562: 559: 554: 548: 544: 537: 535: 533: 529: 517: 513: 507: 504: 497: 492: 489: 486: 483: 481:Increase ROP. 480: 477: 473: 470: 467: 466: 465: 459: 456: 453: 450: 447: 444: 443: 442: 439: 437: 429: 427: 425: 421: 420:casing string 417: 413: 405: 403: 401: 397: 393: 389: 385: 381: 376: 374: 368: 365: 361: 356: 338: 336: 328: 325: 322: 319: 316: 315: 314: 313:or gas well: 312: 304: 302: 300: 296: 292: 287: 283: 281: 276: 275:casing string 271: 269: 265: 261: 257: 249: 247: 245: 241: 237: 233: 224: 220: 214: 211: 208: 204: 201: 197: 194: 190: 187: 183: 180: 176: 175: 174: 171: 169: 165: 164:casing hanger 161: 157: 153: 149: 141: 133: 125: 121: 113: 110: 102: 91: 88: 84: 81: 77: 74: 70: 67: 63: 60: –  59: 55: 54:Find sources: 48: 44: 38: 37: 32:This article 30: 26: 21: 20: 650: 631: 591: 584: 567: 561: 542: 519:. Retrieved 515: 506: 463: 440: 433: 409: 400:drilling rig 377: 369: 360:drilling mud 357: 339: 332: 308: 288: 284: 272: 253: 229: 218: 172: 147: 146: 120: 105: 99:January 2017 96: 86: 79: 72: 65: 53: 41:Please help 36:verification 33: 454:RPM and ROP 430:Casing Wear 424:check valve 416:casing shoe 384:asphaltenes 181:well zones. 179:fresh water 704:Categories 552:0860106616 498:References 446:Drill pipe 341:casing is 260:geologists 69:newspapers 720:Boreholes 710:Oil wells 406:Cementing 305:Intervals 264:formation 244:reservoir 200:pressures 686:Archived 678:Cementer 576:16241819 436:blowouts 295:wellhead 168:wellhead 156:borehole 521:July 5, 350:⁄ 207:blowout 186:caverns 166:in the 83:scholar 662:  638:  607:  574:  549:  448:weight 412:cement 396:packer 250:Design 160:cement 148:Casing 85:  78:  71:  64:  56:  572:S2CID 380:steel 232:metal 90:JSTOR 76:books 636:ISBN 605:ISBN 547:ISBN 523:2018 335:soil 152:pipe 62:news 597:doi 386:or 311:oil 170:. 45:by 706:: 619:^ 603:. 570:. 531:^ 514:. 375:. 343:13 246:. 644:. 613:. 599:: 578:. 555:. 525:. 478:. 352:8 348:3 345:+ 209:. 188:. 112:) 106:( 101:) 97:( 87:· 80:· 73:· 66:· 39:.

Index


verification
improve this article
adding citations to reliable sources
"Casing" borehole
news
newspapers
books
scholar
JSTOR
Learn how and when to remove this message



pipe
borehole
cement
casing hanger
wellhead
fresh water
caverns
drilling fluid
pressures
blowout

metal
production tubing
production fluids
reservoir
drilling engineer