million cost was revealed in the May 2024 state budget, for water main upgrades, toilet blocks, and landscaping around the bridge. All major components of the bridges were in place by early August 2024, including all sixteen bridge modules and all pylons. The bridges are on track to open by the end
376:
approved the bridge in September 2022, with the south-eastern end of the bridge occupying McCallum Park, which is owned by the Town of Victoria Park. The bridge was approved by a Development Assessment Panel in December 2022. The
717: 743: 876: 850: 486: 824: 1034: 513: 929: 538: 1119: 1087: 1007: 797: 564: 334: – which are between 17 and 94 metres (56 and 308 ft) long – will incorporate lights that will allow the display of messages and images. 346:'s narrow footpath. Approximately 1,400 cyclists and 1,900 pedestrians use the Causeway per day. The bridge was announced on 26 August 2020, with an estimated cost of $ 50 436: 661: 1061: 294: 30: 1139: 1129: 771: 360:
Expressions of interest for the construction contract opened in February 2021. Two proponents were shortlisted in April 2021, and a consortium of
1124: 286:, which is the road linking East Perth with Victoria Park. Construction began in March 2023 and is expected to be complete by the end of 2024. 599: 463: 48: 1154: 1149: 692: 982: 956: 271: 122: 638:
Morrison, Scott; Mcgowan, Mark, (MLA, WA); Saffioti, Rita, (MLA, WA); Hammond, Andrew; Liberal Party of Australia (2020-09-20),
410: 353:
The bridge is jointly funded by the state and federal governments under the Perth City Deal, with the construction managed by
1144: 275: 91: 267: 112: 382: 354: 144: 41: 1035:"Fremantle Traffic Bridge blows out by $ 150m while $ 84m will be tipped into Causeway Bridge 'activation' works" 903: 487:"First Look: McGowan Government to unveil plans for $ 50 million pedestrian and cycle bridge across Swan River" 877:"WA State planners approve new $ 100 million Causeway Pedestrian and Cyclist Bridge in Town of Victoria Park" 851:"Town of Victoria Park gives approval for $ 100m Swan River cycle bridge over McCallum Park to be submitted" 368:
Australia was named preferred proponent in March 2022, with the total estimated cost at the time being $ 100
164: 373: 1134: 539:"McGowan Government to unveil plans for $ 50 million pedestrian and cycle bridge across Swan River" 259: 179: 306:
and have a 6-metre-wide (20 ft) segregated path. The bridges are S-shaped, representing the
718:"Joint media statement – Expressions of interest now open to build iconic new Causeway Bridge" 655: 595: 437:"New $ 100m causeway bridge to become WA's latest 'digital canvas' to promote state tourism" 279: 744:"Joint media statement – Proponents shortlisted for iconic new Swan River Causeway Bridge" 314:
mythology. There are three pylons in total. Two pylons are shaped to resemble Aboriginal
825:"$ 55m Swan River cycle bridge over McCallum park awaits Town of Victoria Park approval" 514:"New pedestrian bridge to be built connecting Victoria Park to CBD via Heirrison Island" 378: 385:, by November 2023. In the same month, riverine construction began. An additional $ 80 1113: 315: 1062:"Perth's CBD one-kilometre long causeway on track for completion by the end of 2024" 594:, Australian Government - Department of Infrastructure & Regional Development, 343: 303: 283: 154: 134: 35:
The south-eastern bridge, between Heirisson Island and Victoria Park, July 2024
365: 331: 208: 357:. The Perth City Deal had been preempted by the previous Federal government. 63: 50: 319: 298:
The north-western bridge, between Heirisson Island and East Perth, July 2024
669: 639: 616: 129: 302:
The two bridges are approximately 90 metres (300 ft) downstream of
311: 381:
in March 2023. Fabrication of the bridges' components was underway in
361: 204: 930:"Joint media statement – Construction starts on new gateway to city" 693:"Expressions of Interest begin for new WA Causeway Bridge project" 307: 293: 263: 101: 1088:"Joint Media Statement – Causeway bridges crossing now in place" 1008:"New cycling and pedestrian gateway to Perth CBD coming to life" 957:"Major works begin on $ 100m new Causeway bridges project in WA" 772:"Civmec consortium in line for $ 55m Causeway bridge contract" 798:"Joint media statement – Major boost for the Perth City Deal" 342:
A dedicated pedestrian and cycling bridge was needed due to
983:"Construction Begins On New Pedestrian And Cycling Bridges" 668:
Cormann, Mathias; Liberal Party of Australia (2020-09-20),
565:"New Swan River bridge to be built as part of WA Recovery" 464:"Design for new pedestrian bridge digital canvas released" 671:
City Deal to create 10,000 jobs and transform Perth CBD
641:
City Deal to create 10,000 jobs and transform Perth CBD
372:
million. The contract was awarded in April 2022. The
243: 235: 223: 215: 198: 193: 185: 175: 170: 160: 150: 140: 128: 118: 108: 97: 87: 79: 40: 21: 1060: 902: 770: 485: 435: 904:"2024 end date for $ 100 million Causeway bridge" 1120:Pedestrian bridges in Perth, Western Australia 613:Referred in text as Iconic Swan River Bridge 282:. The two bridges are slightly downstream of 8: 660:: CS1 maint: multiple names: authors list ( 18: 411:"Causeway Pedestrian and Cyclist Bridges" 399: 256:Causeway Pedestrian and Cyclist Bridges 23:Causeway Pedestrian and Cyclist Bridges 901:Budihardjo, Nadia (20 December 2022). 849:Rifici, Victoria (29 September 2022). 653: 405: 403: 318:and one pylon is shaped to resemble a 875:Rifici, Victoria (20 December 2022). 823:Rifici, Victoria (8 September 2022). 590:Department of Infrastructure (2020), 7: 618:Major boost for the Perth City Deal 512:McNeill, Heather (26 August 2020). 16:Bridges in Perth, Western Australia 981:Melanko, Ashleigh (3 March 2023). 769:McKinnon, Stuart (17 March 2022). 691:Gameng, Monica (3 February 2021). 14: 1140:Cable-stayed bridges in Australia 1130:Victoria Park, Western Australia 955:Gameng, Monica (11 March 2023). 29: 1033:Zimmerman, Josh (22 May 2024). 1059:Ford, Olivia (4 August 2024). 615:Morrison, Scott (2022-03-17), 1: 1125:East Perth, Western Australia 484:Law, Peter (26 August 2020). 266:, Western Australia, linking 415:Main Roads Western Australia 383:Henderson, Western Australia 355:Main Roads Western Australia 145:Main Roads Western Australia 1155:Bridges over the Swan River 1171: 1150:Bridges under construction 248: 28: 961:Felix Vendor Marketplace 697:Felix Vendor Marketplace 83:Pedestrians and cyclists 299: 262:under construction in 1145:Bridge light displays 374:Town of Victoria Park 364:, Seymour Whyte, and 297: 207:, Seymour Whyte, and 189:6 m (20 ft) 379:first sod was turned 260:cable-stayed bridges 1067:The West Australian 1039:The West Australian 777:The West Australian 492:The West Australian 442:The West Australian 104:, Western Australia 60: /  300: 216:Construction start 64:31.965°S 115.884°E 1014:. 2 November 2023 724:. 29 January 2021 601:978-1-925843-69-9 252: 251: 224:Construction cost 1162: 1104: 1103: 1101: 1099: 1092:Media Statements 1084: 1078: 1077: 1075: 1073: 1064: 1056: 1050: 1049: 1047: 1045: 1030: 1024: 1023: 1021: 1019: 1012:Media Statements 1004: 998: 997: 995: 993: 978: 972: 971: 969: 967: 952: 946: 945: 943: 941: 934:Media Statements 926: 920: 919: 917: 915: 906: 898: 892: 891: 889: 887: 872: 866: 865: 863: 861: 846: 840: 839: 837: 835: 820: 814: 813: 811: 809: 802:Media Statements 794: 788: 787: 785: 783: 774: 766: 760: 759: 757: 755: 748:Media Statements 740: 734: 733: 731: 729: 722:Media Statements 714: 708: 707: 705: 703: 688: 682: 681: 680: 678: 665: 659: 651: 650: 648: 635: 629: 628: 627: 625: 611: 605: 604: 587: 581: 580: 578: 576: 571:. 26 August 2020 569:Media Statements 561: 555: 554: 552: 550: 545:. 26 August 2020 535: 529: 528: 526: 524: 509: 503: 502: 500: 498: 489: 481: 475: 474: 472: 470: 460: 454: 453: 451: 449: 439: 432: 426: 425: 423: 421: 407: 388: 371: 349: 326:Lighting display 280:Heirisson Island 230: 201: 75: 74: 72: 71: 70: 69:-31.965; 115.884 65: 61: 58: 57: 56: 53: 33: 19: 1170: 1169: 1165: 1164: 1163: 1161: 1160: 1159: 1110: 1109: 1108: 1107: 1097: 1095: 1094:. 4 August 2024 1086: 1085: 1081: 1071: 1069: 1058: 1057: 1053: 1043: 1041: 1032: 1031: 1027: 1017: 1015: 1006: 1005: 1001: 991: 989: 980: 979: 975: 965: 963: 954: 953: 949: 939: 937: 928: 927: 923: 913: 911: 900: 899: 895: 885: 883: 874: 873: 869: 859: 857: 848: 847: 843: 833: 831: 822: 821: 817: 807: 805: 804:. 17 March 2022 796: 795: 791: 781: 779: 768: 767: 763: 753: 751: 750:. 28 April 2021 742: 741: 737: 727: 725: 716: 715: 711: 701: 699: 690: 689: 685: 676: 674: 667: 652: 646: 644: 637: 636: 632: 623: 621: 614: 612: 608: 602: 592:Perth City Deal 589: 588: 584: 574: 572: 563: 562: 558: 548: 546: 537: 536: 532: 522: 520: 511: 510: 506: 496: 494: 483: 482: 478: 468: 466: 462: 461: 457: 447: 445: 444:. 10 March 2024 434: 433: 429: 419: 417: 409: 408: 401: 396: 386: 369: 347: 340: 328: 292: 228: 199: 171:Characteristics 161:Next downstream 68: 66: 62: 59: 54: 51: 49: 47: 46: 36: 24: 17: 12: 11: 5: 1168: 1166: 1158: 1157: 1152: 1147: 1142: 1137: 1132: 1127: 1122: 1112: 1111: 1106: 1105: 1079: 1051: 1025: 999: 973: 947: 936:. 1 March 2023 921: 893: 867: 841: 815: 789: 761: 735: 709: 683: 630: 606: 600: 582: 556: 530: 504: 476: 455: 427: 398: 397: 395: 392: 339: 336: 327: 324: 316:digging sticks 291: 288: 258:are a pair of 250: 249: 246: 245: 241: 240: 237: 233: 232: 225: 221: 220: 217: 213: 212: 202: 200:Constructed by 196: 195: 191: 190: 187: 183: 182: 177: 173: 172: 168: 167: 165:Narrows Bridge 162: 158: 157: 152: 148: 147: 142: 138: 137: 132: 126: 125: 120: 116: 115: 110: 106: 105: 99: 95: 94: 89: 85: 84: 81: 77: 76: 44: 38: 37: 34: 26: 25: 22: 15: 13: 10: 9: 6: 4: 3: 2: 1167: 1156: 1153: 1151: 1148: 1146: 1143: 1141: 1138: 1136: 1133: 1131: 1128: 1126: 1123: 1121: 1118: 1117: 1115: 1093: 1089: 1083: 1080: 1068: 1063: 1055: 1052: 1040: 1036: 1029: 1026: 1013: 1009: 1003: 1000: 988: 984: 977: 974: 962: 958: 951: 948: 935: 931: 925: 922: 910: 909:Business News 905: 897: 894: 882: 878: 871: 868: 856: 852: 845: 842: 830: 826: 819: 816: 803: 799: 793: 790: 778: 773: 765: 762: 749: 745: 739: 736: 723: 719: 713: 710: 698: 694: 687: 684: 673: 672: 663: 657: 643: 642: 634: 631: 620: 619: 610: 607: 603: 597: 593: 586: 583: 570: 566: 560: 557: 544: 540: 534: 531: 519: 515: 508: 505: 493: 488: 480: 477: 465: 459: 456: 443: 438: 431: 428: 416: 412: 406: 404: 400: 393: 391: 384: 380: 375: 367: 363: 358: 356: 351: 345: 337: 335: 333: 330:The bridge's 325: 323: 321: 317: 313: 309: 305: 296: 289: 287: 285: 281: 277: 273: 272:Victoria Park 269: 265: 261: 257: 247: 242: 238: 234: 226: 222: 218: 214: 210: 206: 203: 197: 192: 188: 184: 181: 178: 174: 169: 166: 163: 159: 156: 153: 151:Next upstream 149: 146: 143: 139: 136: 133: 131: 127: 124: 123:Victoria Park 121: 117: 114: 111: 107: 103: 100: 96: 93: 90: 86: 82: 78: 73: 45: 43: 39: 32: 27: 20: 1096:. Retrieved 1091: 1082: 1070:. Retrieved 1066: 1054: 1042:. Retrieved 1038: 1028: 1016:. Retrieved 1011: 1002: 990:. Retrieved 986: 976: 964:. Retrieved 960: 950: 938:. Retrieved 933: 924: 912:. Retrieved 908: 896: 884:. Retrieved 880: 870: 858:. Retrieved 854: 844: 832:. Retrieved 828: 818: 806:. Retrieved 801: 792: 780:. Retrieved 776: 764: 752:. Retrieved 747: 738: 726:. Retrieved 721: 712: 700:. Retrieved 696: 686: 675:, retrieved 670: 645:, retrieved 640: 633: 622:, retrieved 617: 609: 591: 585: 573:. Retrieved 568: 559: 547:. Retrieved 542: 533: 521:. Retrieved 517: 507: 495:. Retrieved 491: 479: 469:17 September 467:. Retrieved 458: 446:. Retrieved 441: 430: 418:. Retrieved 414: 359: 352: 344:the Causeway 341: 329: 304:The Causeway 301: 284:The Causeway 255: 253: 180:Cable-stayed 155:The Causeway 135:The Causeway 1135:Perth Water 666:see also - 332:stay cables 274:across the 67: / 55:115°53′02″E 42:Coordinates 1114:Categories 394:References 276:Swan River 268:East Perth 219:March 2023 113:East Perth 92:Swan River 52:31°57′54″S 390:of 2024. 350:million. 320:boomerang 211:Australia 130:Named for 1098:5 August 1072:5 August 987:So Perth 881:PerthNow 855:PerthNow 829:PerthNow 677:5 August 656:citation 647:5 August 624:5 August 543:PerthNow 244:Location 1044:14 July 1018:14 July 992:14 July 966:14 July 940:14 July 914:14 July 886:14 July 860:14 July 834:14 July 808:14 July 782:14 July 754:14 July 728:14 July 702:14 July 575:14 July 549:14 July 523:14 July 518:WAtoday 497:14 July 448:14 July 420:14 July 338:History 312:Noongar 236:Opening 231:million 194:History 88:Crosses 80:Carries 598:  387:  370:  362:Civmec 348:  290:Design 229:  205:Civmec 176:Design 109:Begins 98:Locale 310:from 308:Wagyl 270:with 264:Perth 227:$ 100 186:Width 141:Owner 102:Perth 1100:2024 1074:2024 1046:2024 1020:2024 994:2024 968:2024 942:2024 916:2024 888:2024 862:2024 836:2024 810:2024 784:2024 756:2024 730:2024 704:2024 679:2024 662:link 649:2024 626:2024 596:ISBN 577:2024 551:2024 525:2024 499:2024 471:2024 450:2024 422:2024 278:via 254:The 239:2024 119:Ends 366:WSP 209:WSP 1116:: 1090:. 1065:. 1037:. 1010:. 985:. 959:. 932:. 907:. 879:. 853:. 827:. 800:. 775:. 746:. 720:. 695:. 658:}} 654:{{ 567:. 541:. 516:. 490:. 440:. 413:. 402:^ 322:. 1102:. 1076:. 1048:. 1022:. 996:. 970:. 944:. 918:. 890:. 864:. 838:. 812:. 786:. 758:. 732:. 706:. 664:) 579:. 553:. 527:. 501:. 473:. 452:. 424:.

Index

An under-construction cable-stayed bridge across a river with two towers, July 2024
Coordinates
31°57′54″S 115°53′02″E / 31.965°S 115.884°E / -31.965; 115.884
Swan River
Perth
East Perth
Victoria Park
Named for
The Causeway
Main Roads Western Australia
The Causeway
Narrows Bridge
Cable-stayed
Civmec
WSP
cable-stayed bridges
Perth
East Perth
Victoria Park
Swan River
Heirisson Island
The Causeway
Under-construction cable-stayed bridge across a river with one tower
The Causeway
Wagyl
Noongar
digging sticks
boomerang
stay cables
the Causeway

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.