153:
24:
195:. South Road crosses north–south over both Cross Road and the diagonal railway via a large bridge built in the early 1980s. This was done in an attempt to cater for the ever increasing amount of traffic which went through the intersection and was constantly congested during peak hour times.
207:
The grade separation at
Emerson Crossing is by a 3-span bridge. The centre span is 40 metres (130 ft), with a 31.2 metres (102 ft) span each end. The abutments and embankments were constructed using the
199:
is located in the north eastern corner of the crossing. The station and crossing are both named after
Emerson Street, a small dead end road just north of the intersection along South Road, in the suburb of
220:
341:
268:
107:
41:
88:
336:
122:
60:
45:
152:
201:
67:
232:
74:
34:
236:
56:
240:
196:
303:
184:
180:
176:
157:
264:
81:
209:
316:
192:
330:
224:
213:
160:
proceeds through the level crossing in 2011. The South Road
Overpass is overhead.
228:
23:
137:
124:
188:
216:. It was commenced in January 1984 and was completed in 13 months.
212:
system and completed in 1983. The main bridge work was awarded to
151:
17:
298:"Highway Engineering in Australia". February–March 1985.
175:) are the informal names given to the intersection of
263:. UBD (A Division of Universal Press Pty Ltd). 2003.
48:. Unsourced material may be challenged and removed.
287:, Reinforced Earth Company Australia, August 1985
227:facilities. It was officially opened jointly by
8:
261:2003 Adelaide Street Directory, 41st Edition
243:Minister of Transport) on 14 March 1985.
108:Learn how and when to remove this message
252:
312:
301:
221:Highways Department of South Australia
7:
46:adding citations to reliable sources
14:
219:The overpass was designed by the
156:Looking west on Cross Road as a
22:
285:Project information sheet No. 4
33:needs additional citations for
1:
342:Road junctions in Australia
358:
233:Premier of South Australia
138:34.967278°S 138.572944°E
197:Emerson railway station
311:Cite journal requires
161:
143:-34.967278; 138.572944
337:Transport in Adelaide
155:
185:Seaford railway line
167:, also known as the
42:improve this article
169:South Road Overpass
134: /
223:. It incorporates
162:
158:3000 class railcar
57:"Emerson Crossing"
118:
117:
110:
92:
349:
321:
320:
314:
309:
307:
299:
295:
289:
288:
281:
275:
274:
257:
210:reinforced earth
165:Emerson Crossing
149:
148:
146:
145:
144:
139:
135:
132:
131:
130:
127:
113:
106:
102:
99:
93:
91:
50:
26:
18:
357:
356:
352:
351:
350:
348:
347:
346:
327:
326:
325:
324:
310:
300:
297:
296:
292:
283:
282:
278:
271:
259:
258:
254:
249:
193:South Australia
142:
140:
136:
133:
128:
125:
123:
121:
120:
114:
103:
97:
94:
51:
49:
39:
27:
12:
11:
5:
355:
353:
345:
344:
339:
329:
328:
323:
322:
313:|journal=
290:
276:
269:
251:
250:
248:
245:
116:
115:
30:
28:
21:
13:
10:
9:
6:
4:
3:
2:
354:
343:
340:
338:
335:
334:
332:
318:
305:
294:
291:
286:
280:
277:
272:
270:0-7319-1441-4
266:
262:
256:
253:
246:
244:
242:
238:
234:
230:
226:
222:
217:
215:
211:
205:
203:
198:
194:
190:
186:
182:
178:
174:
170:
166:
159:
154:
150:
147:
129:138°34′22.6″E
112:
109:
101:
98:November 2008
90:
87:
83:
80:
76:
73:
69:
66:
62:
59: –
58:
54:
53:Find sources:
47:
43:
37:
36:
31:This article
29:
25:
20:
19:
16:
304:cite journal
293:
284:
279:
260:
255:
237:Peter Morris
225:Texas U-turn
218:
214:Baulderstone
206:
202:Black Forest
173:the Overpass
172:
168:
164:
163:
119:
104:
95:
85:
78:
71:
64:
52:
40:Please help
35:verification
32:
15:
229:John Bannon
171:(or simply
141: /
126:34°58′2.2″S
331:Categories
247:References
181:Cross Road
177:South Road
68:newspapers
189:Adelaide
183:and the
241:Federal
82:scholar
267:
235:) and
84:
77:
70:
63:
55:
239:(the
231:(the
89:JSTOR
75:books
317:help
265:ISBN
61:news
187:in
44:by
333::
308::
306:}}
302:{{
204:.
191:,
179:,
319:)
315:(
273:.
111:)
105:(
100:)
96:(
86:·
79:·
72:·
65:·
38:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.