408:
293:
364:. The tunnel is in weak mudstones with considerable ground water. Steel props supported the base of the walls above the lowered invert. Failures of these props and the tunnel's drainage resulted in areas of significant inward cracking of the brickwork. In 1934 a 45 m (148 ft) bulging length was rebuilt to the original profile with a reinforced concrete invert. In 1965 a further 12 m (39 ft) was replaced to improve clearance and to investigate the feasibility of enlarging the old tunnel. The proposal was abandoned as it would have taken at least 9 years and cost twice as much.
37:
327:
346:. However, the sacred grove was felled before tohunga could remove the tapu, and was said to have caused people to die of illnesses that traditional Māori medicine could have cured. The trees were used for railway sleepers. Also, construction polluted a puna wai tapu (holy spring) where tohunga lived.
403:
Towards the end of the construction of the new tunnel, it was feared the old one might collapse. It was shrinking 2-3mm a year when tunnel drainage was working and effective strutting was in place, and 8-10mm per year when it wasn't. The central invert drain had blocked and some steel props were
341:
sites. Local hapū were only alerted to the
Government's plans to construct the railway directly through Tihikārearea when construction workers arrived to begin work on the tunnel, around 1886. They told the workers not to put the track through the sacred ground, and tapu poles were put in the
288:
Although the station closed for goods in 1976, it remained open for
Ministry of Works traffic, during construction of the new tunnel, until 10 November 1980. There was also a station at Porootarao South from about November 1898 till about November 1902.
616:
281:. Work on the Mōkau station to Poro-O-Tarao tunnel section had started in September 1892. It was officially open for traffic on 21 December 1896. Work on the Ohinemoa section (Poro-O-Tarao tunnel to Te Kawakawa, south of
399:
and joints weaken the rock, which is weak anyway. Narrow zones of crushed rock allow water in. The southern approaches to the new tunnel are largely unstable landslide debris, formed of silty clay with rock fragments.
313:
contract time of two years, and also that it be built before the railway reached Te Kuiti (the railhead did not reach the site until 1897) so materials had to be taken over 46 miles (74 km) of
1000:
995:
65:
353:
locomotive crashed and overturned at the station, along with 12 of the train's 46 trucks. Several cattle and sheep were killed, but there were no other casualties.
990:
705:
367:
Thus, when the railway was electrified, a new 6 m (20 ft) diameter, 1,272 m (4,173 ft) tunnel was built to the west. It goes through
404:
buckling. It was so bad, a contingency plan for reopening the old tunnel in the event of it collapsing, was designed. Fortunately it wasn't needed.
306:
407:
568:
985:
492:
467:
309:
awarded a contract to J. J. O'Brien for the Poro-O-Tarao section (including tunnel) in August 1885. The PWD originally required an
292:
698:
277:, though the rails reached Poro-O-Tarao on 1 December 1896 and, from 18 January 1897, a weekly goods train ran through from
320:
later said that if the line had been built to the site first, the tunnel could have been built more cheaply and easily.
270:
118:
980:
882:
841:
691:
338:
185:
266:
valley. It was 9.68 km (6.01 mi) north of
Waimiha and 5.89 km (3.66 mi) south of Mangapehi.
943:
933:
897:
892:
631:
278:
36:
907:
326:
282:
247:
211:
197:
108:
877:
861:
902:
755:
727:
349:
In 1935 the driver and fireman of a northbound goods train were overcome by fumes in the tunnel and the
337:
had been promised the railway would go around Tihikārearea, home to 23 sacred healing trees and other
356:
Poro-O-Tarao was one of the smallest tunnels on the NIMT. As a result, prior to 1920, it had had its
917:
775:
533:
376:
780:
274:
584:
826:
632:"Engineering geological investigations in soft rock terrain, Poro-o-tarao tunnel, New Zealand"
564:
488:
305:
The tunnel to the south of the station was 53 ch (3,500 ft; 1,100 m) long. The
938:
831:
714:
512:
372:
251:
262:
rivers, the NIMT enters Poro-O-Tarao tunnel under Tihikārearea hill, before descending the
912:
851:
429:
259:
513:"Names & Opening & Closing Dates of Railway Stations in New Zealand 1863 to 2010"
959:
846:
334:
317:
974:
836:
396:
361:
263:
856:
650:"Poro-o-tarao tunnel duplication: summary of engineering geological investigations"
636:
Third
Australia-New Zealand conference on Geomechanics: Wellington, May 12–16, 1980
380:
375:
rocks, including landslides; the cause of hummocky ground and many small scarps. A
357:
350:
243:
795:
760:
731:
718:
683:
255:
678:
80:
67:
392:
388:
273:
opened on 1 December 1903, Poro-O-Tarao was the terminus of the line from
805:
770:
765:
368:
202:
617:"Beca Infrastructure Ltd. Repair and Modification of NZ Railway Tunnels"
810:
790:
785:
750:
745:
384:
343:
649:
323:
Work began on the tunnel in 1886 and was complete by 27 August 1890.
411:
Porootarau Tunnel northern portal and station site (to left) in 2018
800:
406:
325:
291:
687:
679:
2016 video of electric freight train leaving the tunnel
254:
of New
Zealand. Between the watersheds of the upper
952:
926:
870:
819:
738:
468:"Te Mana Whatu Ahuru Waitangi Tribunal Report 2018"
158:
146:
138:
130:
125:
114:
104:
96:
59:
51:
46:
23:
563:. Wellington: Tross Publishing. pp. 113–118.
379:at the north portal showed gently-dipping massive
296:Train coming out of Poro-O-Tarao tunnel about 1910
269:For 2 years, from 1 April 1901 until the line to
1001:Railway stations in New Zealand closed in 1976
996:Railway stations in New Zealand opened in 1901
699:
534:"PORO-O-TARAO TUNNEL. KING COUNTRY CHRONICLE"
8:
561:Sweat and Toil: The Building of Ner Zealand
706:
692:
684:
35:
20:
164:
630:Borrie, G. W.; Riddolls, B. W. (1980).
487:(Fourth ed.). Quail Map Co. 1993.
421:
41:Poro-O-Tarao railway station about 1910
330:1886 construction camp at Poro-O-Tarau
485:New Zealand Railway and Tramway Atlas
7:
610:
608:
606:
506:
504:
462:
460:
458:
456:
454:
452:
450:
991:Buildings and structures in Waikato
16:Former train station in New Zealand
585:"THE RUNAWAY TRAIN. WAIKATO TIMES"
520:Rail Heritage Trust of New Zealand
14:
121:443.58 km (275.63 mi)
1:
888:Poro-O-Tarao railway station
285:) started by December 1897.
27:Poro-O-Tarao railway station
1017:
871:Facilities and attractions
100:339 m (1,112 ft)
986:Rail transport in Waikato
883:Mangapehi railway station
842:Mangapohue Natural Bridge
725:
589:paperspast.natlib.govt.nz
538:paperspast.natlib.govt.nz
233:
229:
225:
216:Line open, station closed
210:
196:
190:Line open, station closed
184:
163:
154:
34:
898:Te Kuiti railway station
893:Puketutu railway station
360:lowered to allow larger
81:38.549743°S 175.314288°E
908:Waiteti railway station
615:Ramsay, Graham (1980).
307:Public Works Department
248:North Island Main Trunk
198:North Island Main Trunk
109:North Island Main Trunk
878:Kopaki railway station
862:Waitomo Glowworm Caves
412:
331:
297:
242:(or Porootarao) was a
86:-38.549743; 175.314288
903:Wairere Power Station
756:Maniaiti / Benneydale
559:McLean, John (2020).
430:"Porootarao, Waikato"
410:
329:
295:
315:roadless wilderness.
174:Historical railways
918:Waitomo Caves Hotel
820:Geographic features
301:Poro-O-Tarao Tunnel
77: /
47:General information
413:
342:railway's path by
332:
298:
180:Following station
168:Preceding station
968:
967:
827:Castle Craig Rock
237:
236:
221:
220:
217:
205:
191:
1008:
981:Waitomo District
944:Regional Council
934:District Council
739:Populated places
715:Waitomo District
708:
701:
694:
685:
666:
665:
663:
661:
646:
640:
639:
627:
621:
620:
612:
601:
600:
598:
596:
581:
575:
574:
556:
550:
549:
547:
545:
530:
524:
523:
517:
511:Scoble, Juliet.
508:
499:
498:
481:
475:
474:
472:
464:
445:
444:
442:
440:
426:
252:Waitomo District
215:
201:
189:
165:
92:
91:
89:
88:
87:
82:
78:
75:
74:
73:
70:
39:
21:
1016:
1015:
1011:
1010:
1009:
1007:
1006:
1005:
971:
970:
969:
964:
948:
922:
913:Waiteti Viaduct
866:
852:Rangitoto Range
815:
734:
721:
712:
675:
670:
669:
659:
657:
648:
647:
643:
629:
628:
624:
614:
613:
604:
594:
592:
583:
582:
578:
571:
570:978 18729 70707
558:
557:
553:
543:
541:
532:
531:
527:
515:
510:
509:
502:
495:
483:
482:
478:
470:
466:
465:
448:
438:
436:
428:
427:
423:
418:
303:
214:
200:
188:
85:
83:
79:
76:
71:
68:
66:
64:
63:
42:
30:
29:
28:
17:
12:
11:
5:
1014:
1012:
1004:
1003:
998:
993:
988:
983:
973:
972:
966:
965:
963:
962:
960:Piopio College
956:
954:
950:
949:
947:
946:
941:
936:
930:
928:
924:
923:
921:
920:
915:
910:
905:
900:
895:
890:
885:
880:
874:
872:
868:
867:
865:
864:
859:
854:
849:
847:Marokopa Falls
844:
839:
834:
829:
823:
821:
817:
816:
814:
813:
808:
803:
798:
793:
788:
783:
778:
773:
768:
763:
758:
753:
748:
742:
740:
736:
735:
726:
723:
722:
713:
711:
710:
703:
696:
688:
682:
681:
674:
673:External links
671:
668:
667:
641:
622:
602:
591:. 31 July 1935
576:
569:
551:
540:. 24 June 1933
525:
500:
493:
476:
446:
420:
419:
417:
414:
397:Bedding planes
335:Te Ihingārangi
318:Richard Seddon
302:
299:
235:
234:
231:
230:
227:
226:
223:
222:
219:
218:
209:
206:
195:
192:
182:
181:
178:
175:
172:
169:
161:
160:
156:
155:
152:
151:
148:
144:
143:
140:
136:
135:
132:
128:
127:
123:
122:
116:
112:
111:
106:
102:
101:
98:
94:
93:
61:
57:
56:
53:
49:
48:
44:
43:
40:
32:
31:
26:
25:
24:
15:
13:
10:
9:
6:
4:
3:
2:
1013:
1002:
999:
997:
994:
992:
989:
987:
984:
982:
979:
978:
976:
961:
958:
957:
955:
953:Organisations
951:
945:
942:
940:
937:
935:
932:
931:
929:
925:
919:
916:
914:
911:
909:
906:
904:
901:
899:
896:
894:
891:
889:
886:
884:
881:
879:
876:
875:
873:
869:
863:
860:
858:
855:
853:
850:
848:
845:
843:
840:
838:
837:Lake Harihari
835:
833:
832:Gardner's Gut
830:
828:
825:
824:
822:
818:
812:
809:
807:
804:
802:
799:
797:
794:
792:
789:
787:
784:
782:
779:
777:
774:
772:
769:
767:
764:
762:
759:
757:
754:
752:
749:
747:
744:
743:
741:
737:
733:
729:
724:
720:
716:
709:
704:
702:
697:
695:
690:
689:
686:
680:
677:
676:
672:
655:
651:
645:
642:
637:
633:
626:
623:
618:
611:
609:
607:
603:
590:
586:
580:
577:
572:
566:
562:
555:
552:
539:
535:
529:
526:
521:
514:
507:
505:
501:
496:
494:0 900609 92 3
490:
486:
480:
477:
469:
463:
461:
459:
457:
455:
453:
451:
447:
435:
431:
425:
422:
415:
409:
405:
401:
398:
394:
390:
386:
382:
378:
374:
370:
365:
363:
362:rolling stock
359:
354:
352:
347:
345:
340:
336:
328:
324:
321:
319:
316:
312:
308:
300:
294:
290:
286:
284:
280:
276:
272:
267:
265:
261:
257:
253:
250:line, in the
249:
245:
241:
232:
228:
224:
213:
207:
204:
199:
193:
187:
183:
179:
176:
173:
170:
167:
166:
162:
157:
153:
149:
145:
141:
137:
133:
129:
124:
120:
117:
113:
110:
107:
103:
99:
95:
90:
62:
58:
54:
50:
45:
38:
33:
22:
19:
887:
857:Ruakuri Cave
658:. Retrieved
653:
644:
635:
625:
595:13 September
593:. Retrieved
588:
579:
560:
554:
542:. Retrieved
537:
528:
519:
484:
479:
437:. Retrieved
433:
424:
402:
366:
355:
348:
333:
322:
314:
310:
304:
287:
268:
244:flag station
240:Poro-O-Tarao
239:
238:
134:1 April 1901
18:
719:New Zealand
434:NZ Topo Map
381:interbedded
373:sedimentary
371:Group soft
147:Electrified
142:10 May 1976
84: /
72:175°18′51″E
60:Coordinates
55:New Zealand
975:Categories
927:Government
416:References
311:impossible
271:Taumarunui
119:Wellington
69:38°32′59″S
781:Rangitoto
393:sandstone
389:siltstone
385:claystone
260:Whanganui
186:Mangapehi
150:June 1988
97:Elevation
806:Waikawau
796:Te Kūiti
766:Marokopa
761:Māhoenui
732:Te Kūiti
660:28 March
544:27 March
439:28 March
369:Mahoenui
279:Puketutu
275:Auckland
203:KiwiRail
159:Services
115:Distance
52:Location
811:Waitomo
791:Te Anga
786:Taharoa
751:Awakino
351:Class A
344:tohunga
283:Ōngarue
264:Ōngarue
246:on the
212:Waimiha
208:
194:
177:
171:
126:History
105:Line(s)
776:Piopio
656:. 1975
567:
491:
358:invert
139:Closed
131:Opened
939:Mayor
801:Tiroa
771:Mōkau
516:(PDF)
471:(PDF)
383:weak
377:drive
256:Mōkau
746:Āria
728:Seat
662:2020
638:: 2.
597:2022
565:ISBN
546:2020
489:ISBN
441:2020
391:and
339:tapu
258:and
654:GNS
977::
730::
717:,
652:.
634:.
605:^
587:.
536:.
518:.
503:^
449:^
432:.
395:.
387:,
707:e
700:t
693:v
664:.
619:.
599:.
573:.
548:.
522:.
497:.
473:.
443:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.