197:
20:
94:. The locomotive at the front operates at full traction power, while the locomotive at the rear operates at half power, the other half powering lighting and air conditioning, etc. This power arrangement is needed to cater with steep 1 in 40 (2.5%, or 25
78:, the term "push-pull" is confusingly used to describe trains top-and-tailed with a locomotive at either end. (True push-pull operation with a locomotive at one end is not seen on Japanese mainline railways.)
116:
Top and tail operation is also used for ballast trains which have to move up and down a line undergoing track maintenance. It is safer to drive these trains from the front when operating in "reverse".
234:
253:
227:
144:
105:
Occasionally a short XPT train operates with only one engine and fewer carriages, in which case the whole train must be turned on a
134:
258:
220:
49:. This is a British term. It is normal for only the leading locomotive to power the train when in top-and-tail mode.
53:
87:
167:
140:
68:
60:
196:
45:
at both ends, for ease of changing direction, especially where the terminal station has no
204:
46:
247:
99:
91:
90:
is a train with a light weight locomotive at either end. It is based on the
British
19:
64:
106:
42:
95:
56:, which has a locomotive at one end and a control cab at the other end.
35:
110:
75:
38:
18:
27:
locomotive is used; any other engines run "dead-in-train".
208:
228:
8:
235:
221:
203:This rail-transport related article is a
125:
7:
193:
191:
23:In a top-and-tailed train, only the
133:Vamos, Samantha R. (Aug 18, 2015).
16:Train with locomotive at both ends
14:
136:Alphabet Trains (Children's book)
195:
71:calls this by a different term.
52:It is properly distinct from a
1:
67:are top-and-tailed, although
207:. You can help Knowledge by
139:. Charlesbridge Publishing.
173:. www.sa-trackandsignal.net
98:) and 1 in 33 (3%, or 30‰)
275:
190:
254:Rail transport operations
86:In New South Wales the
28:
22:
259:Rail transport stubs
29:
216:
215:
69:Pakistan Railways
266:
237:
230:
223:
199:
192:
182:
181:
179:
178:
172:
164:
158:
157:
155:
153:
130:
59:Trains going up
274:
273:
269:
268:
267:
265:
264:
263:
244:
243:
242:
241:
188:
186:
185:
176:
174:
170:
166:
165:
161:
151:
149:
147:
132:
131:
127:
122:
84:
54:push–pull train
17:
12:
11:
5:
272:
270:
262:
261:
256:
246:
245:
240:
239:
232:
225:
217:
214:
213:
200:
184:
183:
159:
145:
124:
123:
121:
118:
83:
80:
47:run-round loop
15:
13:
10:
9:
6:
4:
3:
2:
271:
260:
257:
255:
252:
251:
249:
238:
233:
231:
226:
224:
219:
218:
212:
210:
206:
201:
198:
194:
189:
169:
163:
160:
148:
146:9781607348573
142:
138:
137:
129:
126:
119:
117:
114:
112:
108:
103:
101:
97:
93:
89:
81:
79:
77:
72:
70:
66:
62:
57:
55:
50:
48:
44:
40:
37:
34:
26:
21:
209:expanding it
202:
187:
175:. Retrieved
162:
150:. Retrieved
135:
128:
115:
104:
85:
73:
58:
51:
33:top-and-tail
32:
30:
24:
109:such as at
65:Khyber Pass
43:locomotives
248:Categories
177:2019-12-30
120:References
152:6 October
100:gradients
82:Australia
107:triangle
61:zig zags
63:of the
36:railway
168:"ARTC"
143:
171:(PDF)
111:Dubbo
76:Japan
39:train
25:front
205:stub
154:2017
141:ISBN
41:has
92:HST
88:XPT
74:In
250::
113:.
102:.
31:A
236:e
229:t
222:v
211:.
180:.
156:.
96:‰
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.