37:
301:, January 1939 to 5 May 1977. The station was clearly visible on a 1983 aerial photo. Electrification came in 1988, which allowed for more powerful locomotives, reducing the need for the passing point on the long gradient.
709:
297:
was extended, the total cost for both being £19,000. The loop probably opened on 9 December 1939, or possibly 3 December 1939 and closed on 31 March 1987, or, alternatively, as
293:
Sources vary as to opening and closing dates. On 5 October 1938 a new crossing loop was estimated to cost £8,600. The work was done at the same time the loop at
704:
65:
444:
714:
579:
699:
428:
604:
305:
275:
283:
118:
36:
694:
679:
675:
561:
267:
215:
185:
395:
263:
255:
201:
108:
311:
Waiteti translates to water dripping from the ground. The station was in the valley of the
Waiteti Stream.
294:
298:
274:
for 7 mi (11 km), including curves of 8 ch (160 m) to 20 ch (400 m)
287:
488:
338:
369:
646:
424:
470:
515:
319:
621:
688:
271:
251:
308:
had signed a contract on 9 March 1887 and which opened just over 2 years later.
259:
279:
536:
304:
The loop was on the section of line from Te Kuiti to
Puketutu, for which the
80:
67:
516:"Names & Opening & Closing Dates of Railway Stations in New Zealand"
206:
445:"RAILWAYS STATEMENT (BY THE MINISTER OF RAILWAYS, HON. D. G. SULLIVAN)"
396:"Strengthening of Waiteti Viaduct. — (W. E. Puddy, A. M. Inst. C. E.)"
262:, built in 1939 to relieve congestion along a single track
370:"MAIN TRUNK LINE, EVENING POST, VOLUME CXXVIII, ISSUE 142"
562:"Survey Number: SN8213 Run Number: B Photo Number: 7"
605:"Te Mana Whatu Ahuru Waitangi Tribunal Report 2018"
158:
146:
138:
130:
125:
114:
104:
96:
59:
51:
46:
23:
710:Railway stations in New Zealand opened in 1939
278:. It was 470.07 km (292.09 mi) from
8:
290:. The loop could hold 100 4-wheeled wagons.
41:1980 aerial view of Waiteti railway station
35:
20:
164:
423:(Fourth ed.). Quail Map Co. 1993.
330:
421:New Zealand Railway and Tramway Atlas
339:"LATEST TELEGRAMS. THAMES ADVERTISER"
7:
364:
362:
360:
266:, where the line rises steeply from
705:Buildings and structures in Waikato
523:Rail Heritage Trust of New Zealand
475:Rail Heritage Trust of New Zealand
14:
282:. From its opening it was under
250:(sometimes named Waititi) was a
715:Railway stations closed in 1987
121:470.07 km (292.09 mi)
489:"RAILWAY WORKS. AUCKLAND STAR"
16:Railway station in New Zealand
1:
224:8.24 km (5.12 mi)
194:5.59 km (3.47 mi)
731:
674:Retrolens aerial photos –
700:Rail transport in Waikato
647:"Waiteti Stream, Waikato"
493:paperspast.natlib.govt.nz
449:paperspast.natlib.govt.nz
374:paperspast.natlib.govt.nz
343:paperspast.natlib.govt.nz
241:
237:
233:
214:
200:
184:
163:
154:
34:
537:"Waiteti Railway Siding"
100:125 m (410 ft)
81:38.386906°S 175.199007°E
626:Feilding Public Library
514:Scoble, Juliet (2010).
306:Public Works Department
256:North Island Main Trunk
202:North Island Main Trunk
109:North Island Main Trunk
27:Waiteti railway station
580:"NIMT Electrification"
541:gazetteer.linz.govt.nz
86:-38.386906; 175.199007
400:nzetc.victoria.ac.nz
174:Historical railways
77: /
47:General information
584:www.kiwirail.co.nz
376:. 13 December 1939
345:. 29 November 1888
258:railway (NIMT) in
180:Following station
168:Preceding station
495:. 11 October 1938
471:"Station Archive"
245:
244:
229:
228:
225:
209:
195:
722:
695:Waitomo District
662:
661:
659:
657:
643:
637:
636:
634:
632:
622:"The Last Spike"
618:
612:
611:
609:
601:
595:
594:
592:
590:
576:
570:
569:
568:. 21 March 1983.
558:
552:
551:
549:
547:
533:
527:
526:
520:
511:
505:
504:
502:
500:
485:
479:
478:
467:
461:
460:
458:
456:
441:
435:
434:
417:
411:
410:
408:
406:
392:
386:
385:
383:
381:
366:
355:
354:
352:
350:
335:
219:
205:
189:
165:
92:
91:
89:
88:
87:
82:
78:
75:
74:
73:
70:
39:
21:
730:
729:
725:
724:
723:
721:
720:
719:
685:
684:
671:
666:
665:
655:
653:
645:
644:
640:
630:
628:
620:
619:
615:
607:
603:
602:
598:
588:
586:
578:
577:
573:
560:
559:
555:
545:
543:
535:
534:
530:
518:
513:
512:
508:
498:
496:
487:
486:
482:
469:
468:
464:
454:
452:
443:
442:
438:
431:
419:
418:
414:
404:
402:
394:
393:
389:
379:
377:
368:
367:
358:
348:
346:
337:
336:
332:
327:
320:Waiteti Viaduct
317:
284:central control
223:
221:
218:
204:
193:
191:
188:
85:
83:
79:
76:
71:
68:
66:
64:
63:
42:
30:
29:
28:
17:
12:
11:
5:
728:
726:
718:
717:
712:
707:
702:
697:
687:
686:
683:
682:
670:
669:External links
667:
664:
663:
638:
613:
596:
571:
553:
528:
506:
480:
462:
436:
429:
412:
387:
356:
329:
328:
326:
323:
316:
313:
286:from Te Kuiti
243:
242:
239:
238:
235:
234:
231:
230:
227:
226:
222:station closed
213:
210:
199:
196:
192:station closed
182:
181:
178:
175:
172:
169:
161:
160:
156:
155:
152:
151:
148:
144:
143:
140:
136:
135:
132:
128:
127:
123:
122:
116:
112:
111:
106:
102:
101:
98:
94:
93:
61:
57:
56:
53:
49:
48:
44:
43:
40:
32:
31:
26:
25:
24:
15:
13:
10:
9:
6:
4:
3:
2:
727:
716:
713:
711:
708:
706:
703:
701:
698:
696:
693:
692:
690:
681:
677:
673:
672:
668:
652:
648:
642:
639:
627:
623:
617:
614:
606:
600:
597:
585:
581:
575:
572:
567:
563:
557:
554:
542:
538:
532:
529:
524:
517:
510:
507:
494:
490:
484:
481:
476:
472:
466:
463:
450:
446:
440:
437:
432:
430:0-900609-92-3
426:
422:
416:
413:
401:
397:
391:
388:
375:
371:
365:
363:
361:
357:
344:
340:
334:
331:
324:
322:
321:
314:
312:
309:
307:
302:
300:
296:
291:
289:
285:
281:
277:
273:
270:on a 1 in 70
269:
265:
261:
257:
253:
249:
240:
236:
232:
217:
211:
208:
203:
197:
187:
183:
179:
176:
173:
170:
167:
166:
162:
157:
153:
149:
145:
141:
137:
133:
129:
124:
120:
117:
113:
110:
107:
103:
99:
95:
90:
62:
58:
54:
50:
45:
38:
33:
22:
19:
654:. Retrieved
650:
641:
629:. Retrieved
625:
616:
599:
587:. Retrieved
583:
574:
565:
556:
544:. Retrieved
540:
531:
522:
509:
497:. Retrieved
492:
483:
474:
465:
453:. Retrieved
448:
439:
420:
415:
403:. Retrieved
399:
390:
378:. Retrieved
373:
347:. Retrieved
342:
333:
318:
310:
303:
292:
252:passing loop
247:
246:
18:
651:NZ Topo Map
260:New Zealand
147:Electrified
84: /
72:175°11′56″E
60:Coordinates
55:New Zealand
689:Categories
656:1 February
631:1 February
589:1 February
546:31 January
455:31 January
405:31 January
380:31 January
349:1 February
325:References
280:Wellington
220:Line open,
190:Line open,
119:Wellington
69:38°23′13″S
566:Retrolens
288:signalbox
150:June 1988
97:Elevation
315:See also
299:gazetted
272:gradient
268:Te Kuiti
216:Puketutu
207:KiwiRail
186:Te Kuiti
159:Services
115:Distance
52:Location
477:. 2012.
254:on the
248:Waiteti
212:
198:
177:
171:
126:History
105:Line(s)
451:. 1940
427:
295:Kopaki
276:radius
139:Closed
131:Opened
608:(PDF)
519:(PDF)
499:4 May
264:block
680:1983
676:1964
658:2019
633:2019
591:2019
548:2019
501:2021
457:2019
425:ISBN
407:2019
382:2019
351:2019
142:1987
134:1939
691::
678:,
649:.
624:.
582:.
564:.
539:.
521:.
491:.
473:.
447:.
398:.
372:.
359:^
341:.
660:.
635:.
610:.
593:.
550:.
525:.
503:.
459:.
433:.
409:.
384:.
353:.
Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.