149:, steering committee, or project manager, a review and approval process is typically required. The plan/scope and impact/risk assessments are considered in the context of business goals, requirements, and resources. If, for example, the change request is deemed to address a low severity, low impact issue that requires significant resources to correct, the request may be made low priority or shelved altogether. In cases where a high-impact change is requested but without a strong plan, the review/approval entity may request a full 137:
proposed change: high-, moderate-, or low-risk. High-risk change requires many additional steps such as management approval and stakeholder notification, whereas low-risk change may only require project manager approval and minimal documentation. If not addressed in the plan/scope, the desire for a backout plan should be expressed, particularly for high-risk changes that have significant worst-case scenarios.
179:
quality management standards. The implementation process may also require additional staff responsibilities outside the implementation team, including stakeholders who may be asked to assist with troubleshooting. Following implementation, the team may also carry out a post-implementation review, which would take place at another stakeholder meeting or during project closing procedures.
170:. Little in the way of testing and validation may occur for low-risk changes, though major changes will require significant testing before implementation. They will then seek approval and request a time and date to carry out the implementation phase. In rare cases where the solution can't be tested, special consideration should be made towards the change/implementation window. 714: 187:
The closing process can be one of the more difficult and important phases of change control. Three primary tasks at this end phase include determining that the project is actually complete, evaluating "the project plan in the context of project completion," and providing tangible proof of project
178:
In most cases a special implementation team with the technical expertise to quickly move a change along is used to implement the change. The team should also be implementing the change not only according to the approved plan but also according to organizational standards, industry standards, and
127:
Consider the primary and ancillary detail of the proposed change. This should include aspects such as identifying the change, its owner(s), how it will be communicated and executed, how success will be verified, the change's estimate of importance, its added value, its conformity to business and
136:
Impact and risk assessment is the next vital step. When executed, will the proposed plan cause something to go wrong? Will related systems be impacted by the proposed change? Even minor details should be considered during this phase. Afterwards, a risk category should ideally be assigned to the
48:
Change control is used in various industries, including in IT, software development, the pharmaceutical industry, the medical device industry, and other engineering/manufacturing industries. For the IT and software industries, change control is a major aspect of the broader discipline of change
38:
is a process—either formal or informal—used to ensure that changes to a product or system are introduced in a controlled and coordinated manner. It reduces the possibility that unnecessary changes will be introduced to a system without forethought, introducing faults into the system or undoing
161:
If the change control request is approved to move forward, the delivery team will execute the solution through a small-scale development process in test or development environments. This allows the delivery team an opportunity to design and make incremental changes, with
39:
changes made by other users of software. The goals of a change control procedure usually include minimal disruption to services, reduction in back-out activities, and cost-effective utilization of resources involved in implementing change. According to the
200:
regulated industry, the topic is frequently encountered by its users. Various industrial guidances and commentaries are available for people to comprehend this concept. As a common practice, the activity is usually directed by one or more
764: 188:
success. If despite best efforts something went wrong during the change control process, a post-mortem on what happened will need to be run, with the intent of applying lessons learned to future changes.
45:, change control is a "process whereby modifications to documents, deliverables, or baselines associated with the project are identified, documented, approved, or rejected." 819: 768: 667: 836: 743: 803: 846: 718: 660: 266: 637: 552: 493: 466: 441: 416: 318: 373: 214: 202: 40: 841: 197: 276: 27: 690: 236: 93: 581: 206: 31: 604: 602: 146: 813: 167: 96:
and change control. The definition below is not yet integrated with definitions of the others.
799: 633: 625: 548: 542: 489: 483: 462: 437: 412: 408: 401: 314: 308: 89: 58: 54: 271: 261: 251: 20: 310:
Managing the Software Enterprise: Software Engineering and Information Systems in Context
226: 210: 70: 66: 630:
Project Scheduling and Cost Control: Planning, Monitoring and Controlling the Baseline
544:
Project Scheduling and Cost Control: Planning, Monitoring and Controlling the Baseline
830: 241: 150: 661:"Guidance for Industry: Quality Systems Approach to Pharmaceutical CGMP Regulations" 231: 163: 246: 719:"Q7: Good Manufacturing Practice Guide for Active Pharmaceutical Ingredients" 485:
Implementing Information Security in Healthcare: Building a Security Program
256: 488:. Healthcare Information and Management Systems Society. pp. 204–205. 50: 62: 765:"Guidance for Industry - COMPUTERIZED SYSTEMS USED IN CLINICAL TRIALS" 798:. Project Management Institute (7th ed.). Newtown Square, PA. 57:
environments are patches to software products, installation of new
16:
Process ensuring that changes to a product or system are controlled
796:
A guide to the project management body of knowledge (PMBOK guide)
77: 608: 515: 459:
Engineering Documentation Control Practices & Procedures
340: 128:
industry standards, and its target date for completion.
99:
Change control can be described as a set of six steps:
691:"Challenges of Change Control in a Regulated Industry" 744:"Change control system: Standard Operating Procedure" 619: 617: 374:"10 essential elements of change control management" 88:
There is considerable overlap and confusion between
367: 365: 363: 361: 359: 357: 355: 353: 351: 349: 400: 575: 573: 571: 536: 534: 532: 530: 528: 526: 524: 482:Herzig, T.W.; Walsh, T.; Gallagher, L.A. (2013). 302: 300: 298: 296: 294: 292: 434:Design Controls for the Medical Device Industry 626:"Chapter 11: Successfully Closing the Project" 8: 818:: CS1 maint: location missing publisher ( 403:Pharmaceutical Engineering Change Control 632:. J. Ross Publishing. pp. 215–225. 547:. J. Ross Publishing. pp. 192–203. 436:(2nd ed.). CRC Press. p. 205. 580:Operational Excellence Program Office. 288: 153:may be requested for further analysis. 811: 313:. Cengage Learning. pp. 318–325. 49:management. Typical examples from the 794:Project Management Institute (2021). 213:, it has been guided by another U.S. 7: 307:Hall, P.A.V.; Ramil, J.C.F. (2007). 587:. University of California Berkeley 267:Specification (technical standard) 145:Whether it's a change controller, 14: 837:Information technology management 769:U.S. Food and Drug Administration 668:U.S. Food and Drug Administration 609:Project Management Institute 2021 516:Project Management Institute 2021 407:. Taylor & Francis. pp.  399:Turner, S.G. (15 December 2003). 341:Project Management Institute 2021 1: 611:, §4.4.3 Meetings and Events. 518:, §4.6.3 Meetings and Events. 372:Matteson, S. (7 July 2017). 215:Food and Drug Administration 42:Project Management Institute 847:Software project management 198:good manufacturing practice 863: 461:. CRC Press. p. 280. 343:, Glossary §3 Definitions. 65:tables, or changes to the 28:quality management systems 18: 742:GMP Online Consultancy. 582:"Change Control Process" 237:Engineering change order 94:configuration management 69:systems supporting such 19:Not to be confused with 432:Teixeira, M.B. (2013). 380:. CBS Interactive, Inc 207:information technology 192:Regulatory environment 80:cover change control. 61:, upgrades to network 32:information technology 457:Monahanm E. (1995). 147:change control board 76:Certain portions of 624:Taylor, J. (2008). 541:Taylor, J. (2008). 842:Project management 168:regression testing 805:978-1-62825-664-2 141:Review / approval 109:Review / approval 90:change management 59:operating systems 854: 823: 817: 809: 781: 780: 778: 776: 761: 755: 754: 752: 750: 739: 733: 732: 730: 728: 723: 711: 705: 704: 702: 700: 695: 686: 680: 679: 677: 675: 670:. September 2006 665: 657: 651: 650: 648: 646: 621: 612: 606: 597: 596: 594: 592: 586: 577: 566: 565: 563: 561: 538: 519: 513: 507: 506: 504: 502: 479: 473: 472: 454: 448: 447: 429: 423: 422: 406: 396: 390: 389: 387: 385: 369: 344: 338: 332: 331: 329: 327: 304: 277:Scope management 209:perspective for 132:Assess / analyze 106:Assess / analyze 67:electrical power 862: 861: 857: 856: 855: 853: 852: 851: 827: 826: 810: 806: 793: 790: 785: 784: 774: 772: 763: 762: 758: 748: 746: 741: 740: 736: 726: 724: 721: 713: 712: 708: 698: 696: 693: 688: 687: 683: 673: 671: 663: 659: 658: 654: 644: 642: 640: 623: 622: 615: 607: 600: 590: 588: 584: 579: 578: 569: 559: 557: 555: 540: 539: 522: 514: 510: 500: 498: 496: 481: 480: 476: 469: 456: 455: 451: 444: 431: 430: 426: 419: 398: 397: 393: 383: 381: 371: 370: 347: 339: 335: 325: 323: 321: 306: 305: 290: 285: 272:Standardization 262:Living document 252:Version control 223: 211:clinical trials 194: 185: 176: 159: 143: 134: 125: 86: 24: 21:version control 17: 12: 11: 5: 860: 858: 850: 849: 844: 839: 829: 828: 825: 824: 804: 789: 786: 783: 782: 756: 734: 706: 681: 652: 638: 613: 598: 567: 553: 520: 508: 494: 474: 467: 449: 442: 424: 417: 391: 345: 333: 319: 287: 286: 284: 281: 280: 279: 274: 269: 264: 259: 254: 249: 244: 239: 234: 229: 227:Change request 222: 219: 193: 190: 184: 181: 175: 172: 158: 155: 142: 139: 133: 130: 124: 121: 120: 119: 116: 113: 110: 107: 104: 85: 82: 71:infrastructure 36:change control 34:(IT) systems, 15: 13: 10: 9: 6: 4: 3: 2: 859: 848: 845: 843: 840: 838: 835: 834: 832: 821: 815: 807: 801: 797: 792: 791: 787: 770: 766: 760: 757: 745: 738: 735: 720: 716: 710: 707: 692: 685: 682: 669: 662: 656: 653: 641: 639:9781932159110 635: 631: 627: 620: 618: 614: 610: 605: 603: 599: 583: 576: 574: 572: 568: 556: 554:9781932159110 550: 546: 545: 537: 535: 533: 531: 529: 527: 525: 521: 517: 512: 509: 497: 495:9781938904356 491: 487: 486: 478: 475: 470: 468:9780824795740 464: 460: 453: 450: 445: 443:9781466503557 439: 435: 428: 425: 420: 418:9780849320613 414: 410: 405: 404: 395: 392: 379: 375: 368: 366: 364: 362: 360: 358: 356: 354: 352: 350: 346: 342: 337: 334: 322: 320:9781844803545 316: 312: 311: 303: 301: 299: 297: 295: 293: 289: 282: 278: 275: 273: 270: 268: 265: 263: 260: 258: 255: 253: 250: 248: 245: 243: 242:Documentation 240: 238: 235: 233: 230: 228: 225: 224: 220: 218: 216: 212: 208: 204: 199: 191: 189: 182: 180: 173: 171: 169: 165: 156: 154: 152: 151:business case 148: 140: 138: 131: 129: 122: 117: 114: 111: 108: 105: 102: 101: 100: 97: 95: 91: 83: 81: 79: 74: 72: 68: 64: 60: 56: 52: 46: 44: 43: 37: 33: 29: 22: 795: 773:. Retrieved 771:. April 1999 759: 747:. Retrieved 737: 725:. Retrieved 709: 697:. Retrieved 684: 672:. Retrieved 655: 643:. Retrieved 629: 589:. Retrieved 558:. Retrieved 543: 511: 499:. Retrieved 484: 477: 458: 452: 433: 427: 402: 394: 382:. Retrieved 378:TechRepublic 377: 336: 324:. Retrieved 309: 232:Change order 195: 186: 177: 160: 157:Build / test 144: 135: 126: 123:Plan / scope 112:Build / test 103:Plan / scope 98: 87: 75: 47: 41: 35: 25: 205:. From the 84:The process 831:Categories 788:References 689:Infusion. 247:Identifier 217:document. 30:(QMS) and 814:cite book 283:Citations 257:Changelog 174:Implement 115:Implement 749:28 April 727:20 April 699:28 April 221:See also 51:computer 674:12 July 166:and/or 63:routing 55:network 26:Within 802:  775:13 May 645:20 May 636:  591:20 May 560:20 May 551:  501:20 May 492:  465:  440:  415:  384:20 May 326:20 May 317:  722:(PDF) 694:(PDF) 664:(PDF) 585:(PDF) 196:In a 183:Close 118:Close 820:link 800:ISBN 777:2021 751:2009 729:2011 701:2009 676:2009 647:2018 634:ISBN 593:2018 562:2018 549:ISBN 503:2018 490:ISBN 463:ISBN 438:ISBN 413:ISBN 386:2018 328:2018 315:ISBN 203:SOPs 164:unit 78:ITIL 53:and 715:ICH 409:200 833:: 816:}} 812:{{ 767:. 717:. 666:. 628:. 616:^ 601:^ 570:^ 523:^ 411:. 376:. 348:^ 291:^ 92:, 73:. 822:) 808:. 779:. 753:. 731:. 703:. 678:. 649:. 595:. 564:. 505:. 471:. 446:. 421:. 388:. 330:. 23:.

Index

version control
quality management systems
information technology
Project Management Institute
computer
network
operating systems
routing
electrical power
infrastructure
ITIL
change management
configuration management
change control board
business case
unit
regression testing
good manufacturing practice
SOPs
information technology
clinical trials
Food and Drug Administration
Change request
Change order
Engineering change order
Documentation
Identifier
Version control
Changelog
Living document

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

↑