Knowledge

Seaton railway station (Cumbria)

Source šŸ“

Disused railway station in Cumbria, England

Seaton
Seaton station, 1951.
General information
LocationSeaton, near Workington, Allerdale
England
Coordinates54Ā°39ā€²44ā€³N 3Ā°31ā€²24ā€³W / 54.6621Ā°N 3.5234Ā°W / 54.6621; -3.5234
Grid referenceNY018307
Platforms2
Other information
StatusDisused
History
Original companyCleator and Workington Junction Railway
Key dates
4 January 1888Opened
July 1897Closed
February 1907Reopened
February 1922Closed to passengers
6 April 1962Closed completely
4 June 1992Line through the station closed
Location
Seaton is located in the former Allerdale Borough
Seaton
Seaton
Location in present-day Allerdale, Cumbria
Show map of the former Allerdale Borough
Seaton is located in Cumbria
Seaton
Seaton
Location in present-day Cumbria, England
Show map of Cumbria
A 1914 Railway Clearing House Junction Diagram showing the complex network which existed in the Workington area
Cleator & Workington Junction Rly
Key
open line
C&WJR lines (all closed)
other closed lines

Solway Junction Railway
to Annan via Solway Viaduct
Linefoot
Linefoot Junction
Summit
Great Broughton
Buckhill Colliery Halt
Camerton Colliery Halt
Siddick Junction
Seaton
Siddick Junction
Calva Junction
enlargeā€¦ Workington North
enlargeā€¦ Workington Main
Workington Central enlargeā€¦
Bridgefoot
Derwent Ironworks
 
Moss Bay (north)
Ironworks (south)
 
Harrington
(Church Road Halt)
Rosehill
(Archer Street Halt)
High Harrington
Distington
Oatlands
Millgrove
Moresby Parks
Summit
Moresby Junction
Halt
Summit
Rowrah
Arlecdon
Keekle Colliers'
Platform
mine
Cleator Moor West
Cleator Moor East
Cleator Moor Junction
Moor Row Junction
Moor Row
Cumbrian Coast line
Carlisle
Cummersdale
Dalston
Curthwaite
Crofton
Wigton
Brookfield
Leegate
High Blaithwaite
Mealsgate
Allhallows Colliery
Brayton
Baggrow
Aspatria
Arkleby
Bullgill
Dearham Bridge
Maryport
Flimby
St Helens Colliery Halt
Siddick Junction
Calva Junction
Workington North
enlargeā€¦
Steel Works
Workington
Harrington
Parton
Whitehaven
Whitehaven Harbour
Preston Street
Corkickle
Corkickle Brake
St Bees
St Bees Golf Halt
Nethertown
Braystones
Sellafield
Sellafield sidings
Seascale
Drigg Low Level
Waste Repository
Drigg
Ravenglass
for Eskdale
Eskmeals
Monks Moors Halt
Bootle
Whitbeck Crossing Halt
Silecroft
Kirksanton Halt
Hodbarrow
Millom
Underhill Halt
Green Road
Foxfield
Kirkby-in-Furness
Dunnerholme Gate
Askam-in-Furness
Goldmire mines
Sandscale mines
Barrow-in-Furness
Barrow loop line
Port of Barrow
Roosecote Power Station
Salthouse Halt
Roose
Rampside
Furness Abbey
Piel

Seaton railway station served the village of Seaton, near Workington in Cumberland (now in Cumbria), England.

The station was opened by the Cleator and Workington Junction Railway (C&WJR) in 1888 on its new "Northern Extension" from Calva Junction on the northern edge of Workington to the Maryport and Carlisle Railway's Derwent Branch at Linefoot. The C&WJR built this 7-mile-30-chain long (11.9 km) line to connect the C&WJR with Carlisle and beyond. The line was double track from Workington to Seaton, then single to Linefoot Junction.

Most stations on C&WJR lines had heavy industrial neighbours, such as ironworks next to Cleator Moor West, or served primarily industrial workforces, such as Keekle Colliers' Platform. Seaton, however, was a fairly isolated country village.

History

The C&WJR was built in the late 1870s, being one of the fruits of the rapid industrialisation of West Cumberland in the second half of the nineteenth century, specifically being born as a reaction to oligopolistic behaviour by the London and North Western and Whitehaven, Cleator and Egremont Railways.

It was originally intended to drive the line northwards across country to meet the Caledonian Railway and cross into Scotland by the Solway Viaduct, but an accommodation was made with the LNWR leading to the intended northern extension being greatly watered down to three lines:

  • a 1 mile 54 chains (2.7 km) link from Workington Central to Siddick Junction which opened in 1880
  • a 30 chains (0.60 km) link from Cloffocks Junction to the CKPR line which opened in March 1885, and
  • the "Northern Extension" through Seaton to Linefoot Junction.

All lines in the area were primarily aimed at mineral traffic, notably iron ore, coal and limestone, none more so than the Northern Extension, which passed through open country. Passenger services were provided calling at Seaton, but they were so unsuccessful they petered out in 1922. The C&WJR earned the local name "The Track of the Ironmasters".

The founding Act of Parliament of June 1878 confirmed the company's agreement with the Furness Railway that the latter would operate the line for one third of the receipts.

All C&WJR's lines were heavily graded. Almost all of the first three miles of the Northern Extension from Calva Junction through Seaton was rising at 1 in 70. This favoured loaded coal and coke trains.

The Northern Extension became part of the London, Midland and Scottish Railway at the Grouping of 1923.

Like any business tied to one or few industries, the C&WJR was particularly at the mercy of trade fluctuations and technological change. The Cumberland iron industry led the charge in the nineteenth century, but became less and less competitive as time passed and local ore became worked out and harder to win, taking the fortunes of the railway with it. The peak year was 1909, when the C&WJR handled 1,644,514 tons of freight. Ominously for the line, that tonnage was down to just over 800,000 by 1922, bringing receipts of Ā£83,349, compared with passenger fares totalling Ā£6,570.

The high water mark for tonnage on the C&WJR was 1909, the high water mark for progress was 1913, with the opening of the Harrington and Lowca line for passenger traffic. A chronology of the line's affairs from 1876 to 1992 has almost no entries before 1914 which fail to include "opened" or "commenced". After 1918 the position was reversed, when the litany of step-by-step closures and withdrawals was relieved only by a control cabin and a signalbox being erected at Harrington Junction in 1919.

Services

C&WJR passenger trains consisted of antiquated Furness stock hauled largely by elderly Furness engines referred to as "rolling ruins" by one author after a footplate ride in 1949.

No Sunday passenger service was ever provided on any C&WJR line.

The Northern Extension had three stations: Seaton, Great Broughton and Linefoot, the last being run jointly with the Maryport and Carlisle Railway (MCR). A passenger service was provided to Seaton over two periods: 1888 to 1897 and 1907 to 1922. The service in the first period appears to have been out and back over the 2 miles 19 chains (3.6 km) to Workington Central. This was reduced to Wednesdays and Saturdays only (Workington Market Days) from March 1891 and to Saturdays only from January 1894, being withdrawn completely in July 1897.

The company tried again ten years later, with what appears to have been another daily out and back from Workington Central. From September 1908 this was extended, on Saturdays only, to Great Broughton and Linefoot Junction, making those outposts qualify as stations having had a publicly advertised passenger service. That experiment failed, as they disappeared from the timetable in December of that year, leaving Seaton as the only Northern extension station with a public passenger service.

On 2 June 1913 a new public passenger service was opened from Lowca to Workington Central, aimed mainly but not exclusively at workers travelling to and from the remote Harrington No 10 Colliery and associated bi-products works on the clifftop at Lowca. One of these trains ran beyond Workington to Seaton and a second one did so on Saturday afternoons. Southbound ("Down") the early morning train started at Seaton and one other made an out and back trip from Seaton to Workington, rather than a through train. All others plied between Lowca and Workington Central only. This remained the case in 1919. The Lowca service continued to 1926, but the Seaton experiment ended altogether in February 1922.

The W&CJR ran many workmen's trains. Three collieries were served by the Northern Extension - Camerton, Buckhill and Alice Pit. No source lists any station, halt or workmen's service to this last, which was at the northern end of the line near Linefoot Junction. The 1920 Working Time Table lists Alice Pit, but shows no booked services of any description.

Camerton Colliery Halt and Buckhill Colliery Halt both had workmen's services at some point, but they are not mentioned in the May 1920 Working Time Table. Indeed, Camerton Colliery is not mentioned at all.

The 1920 Working Time Table shows no Goods (as opposed to mineral) trains or "Through goods" trains booked to call or pass Seaton in either direction.

Rundown and closure

The West Cumberland iron and steel industry was heavily dependent on supplies of coke from the Northumberland and Durham coalfields. The Northern Extension allowed "a large proportion" of this traffic to be routed away from Maryport and the coastal line. Likewise the short chord between Workington Bridge and Cloffocks Junction allowed Durham coke traffic to reach the furnaces via Cockermouth then the C&WJR. These must have suffered a significant decline, as by 1920 there were just two booked mineral workings each way each weekday between Linefoot Junction and Workington through Seaton. There was also a daily booked mineral train from Workington to Buckhill Colliery which passed through Seaton. It is therefore no surprise that the line north of Buckhill Colliery closed on 1 September 1921, leaving Seaton station "stranded" on what was effectively a long siding.

Given this early decline it is remarkable that Seaton station remained open for goods traffic until 6 April 1962 and even more remarkable that the line through Seaton went on to outlive all other former C&WJR metals by some years. Buckhill Colliery's output and Seaton station's slender goods traffic appear to be the sole reasons for keeping the remnant of the Northern Extension open after 1922, though Camerton Colliery appears to have still been in production until 1931. Buckhill Colliery closed in 1932, though even here it is questionable how much rail borne coal traffic it generated after 1924 when an aerial ropeway was installed taking its coals over the Derwent to William Pit at Great Clifton.

The branch's longevity came about because the Admiralty, attracted by a remote area with rail and sea access, chose part of the site of Buckhill Colliery and the surrounding area to build a rail-served armaments depot which opened in 1938 and closed in 1992, taking the line with it. After the closure of the C&WJR south of Workington Central in 1965 all trains through Seaton to the armaments depot travelled south from Siddick Junction past Calva Junction, where they reversed towards Seaton.

Enthusiasts' specials

An enthusiasts' special passed through Seaton on 5 September 1954, travelling to the then limit of public railway at Buckhill, the only one to traverse the C&WJR using main line passenger stock.

The next such train to traverse any C&WJR metals was the "Solway Ranger" brakevan special on 7 May 1966, which repeated the run through Seaton to Buckhill, with a third and final such trip on 2 March 1968

Afterlife

By 2015 the trackbed through Seaton was part of the West Cumbria Cycle Network.


Preceding station   Disused railways   Following station
Workington Central
Line and station closed
  Cleator and Workington Junction Railway
Northern Extension
  Camerton Colliery Halt
Line and station closed

See also

References

  1. Anderson 2002, p. 315.
  2. Robinson 2002, p. 15.
  3. Suggitt 2008, p. 70.
  4. Webb 1964a, p. 790.
  5. ^ Butt 1995, p. 207.
  6. ^ McGowan Gradon 2004, p. 68.
  7. McGowan Gradon 2004, pp. 6 & 63.
  8. Smith & Turner 2012, Map 26.
  9. Jowett 1989, Map 36.
  10. Anderson 2002, p. 309.
  11. ^ McGowan Gradon 2004, p. 59.
  12. Anderson 2002, p. 313.
  13. Marshall 1981, p. 117.
  14. McGowan Gradon 2004, p. 64.
  15. McGowan Gradon 2004, p. 50.
  16. Suggitt 2008, p. 65.
  17. Anderson 2002, p. 314.
  18. McGowan Gradon 2004, pp. 40 & 42.
  19. McGowan Gradon 2004, p. 51.
  20. Bradshaw 1968, p. 477.
  21. Andrews 2001, p. 22.
  22. McGowan Gradon 2004, pp. 28ā€“9.
  23. ^ Haynes 1920, Tables.
  24. Bradshaw 1985, p. 595.
  25. Croughton, Kidner & Young 1982, pp. 55 & 53.
  26. McGowan Gradon 2004, p.11, Note 8.
  27. Camerton Colliery data, via Durham Mining Museum
  28. McGowan Gradon 2004, p. 56.
  29. Buckhill Colliery ropeway, via Durham Mining Museum
  30. McGowan Gradon 2004, pp. 58ā€“59.
  31. McGowan Gradon 2004, pp. 60ā€“1.

Sources

Further reading

External links

Closed railway stations in Cumbria
Waverley Route
Caledonian main line
Solway Junction Railway
Port Carlisle Dock and Railway
Carlisle and Silloth Bay Railway
Maryport and Carlisle Railway
Newcastle & Carlisle Railway
Lancaster and Carlisle Railway
Ingleton branch line
Eden Valley Railway
South Durham and Lancashire Union Railway
Settleā€“Carlisle line
Cleator and Workington Junction Railway
Harrington and Lowca Light Railway
Gilgarran Branch
Whitehaven, Cleator and Egremont Railway
Whitehaven Junction Railway
Whitehaven and Furness Junction Railway
Furness Railway
Cockermouth and Workington Railway
Cockermouth, Keswick and Penrith Railway
Coniston Railway
Other

Text is available under the Creative Commons Attribution-ShareAlike License. Additional terms may apply.

ā†‘